A door opening on a new building costs you more wall than the opening itself, and the eave height you order has to clear the opening plus the manufacturer's published headroom.

Written by Gary ThompsonSteel Building Research EditorReviewed by Find Steel Buildings Editorial Team

Common single
9 × 7 and 9 × 8
Common double
16 × 7 and 16 × 8
Published headroom
10 in to 14 in
Published sideroom
3¾ in each side

Quick reference

Openings, the wall they consume and the eave they need

Wall width = opening + 0.5 ft each side; eave height = opening height + 14 in headroom

Opening (W × H)Wall width consumedEave height neededTypical use
8′ × 7′9′8.17′Single car, compact
9′ × 7′10′8.17′Single car, most common single opening
9′ × 8′10′9.17′Single bay with roof-rack clearance
10′ × 8′11′9.17′Pickup or workshop bay
12′ × 10′13′11.17′Equipment, trailer or tractor bay
14′ × 14′15′15.17′RV or tall equipment bay
16′ × 7′17′8.17′Two cars behind one opening
16′ × 8′17′9.17′Two vehicles, taller opening
18′ × 8′19′9.17′Two full-size vehicles behind one opening

Both allowances are shown so you can substitute your own supplier's figures. The 14 in headroom is the largest value in the published Clopay table below.

Manufacturer literature

Published headroom and sideroom

Clopay residential sectional door headroom

Extension spring, 12 in radius track10″Verified source
Extension spring, 15 in radius track12″Verified source
Torsion spring, 12 in radius track12″Verified source
Torsion spring, 15 in radius track14″Verified source

Headroom is measured above the opening, inside the building.

Low-headroom options and sideroom

Low-headroom extension kit4.5″Verified source
Low-headroom torsion kit9.5″Verified source
Sideroom, vertical track3.75″ each sideVerified source
Sideroom above opening, torsion4.5″Verified source

These figures are published by one manufacturer for one product family. A roll-up door on a steel building has its own published figures; ask your supplier for them rather than reusing these.

Diagram

Opening, headroom and eave on one elevation

16′ × 8′ opening10′ eave2′ 0″ above the opening (allowance 1′ 2″)
A 16 x 8 opening in a 10 ft eave wall, with the space above the opening computed.Computed elevation

What changes

Ordering openings for a new building is not measuring for a replacement

Replacement guidance starts from an opening that already exists. On a new steel building you are buying the opening, and every foot of it comes out of a wall you also need for corners and for the spacing between doors. Two 9 ft openings on a 24 ft wall consume 20 ft once a half-foot jamb allowance is added on each side of each door, leaving 4 ft split across three pieces of wall.

Door wall arithmetic on a 24 ft bay

ConfigurationOpeningsWall consumedWall remaining on a 24 ft bay
One 16 ft opening117′7.0′
Two 9 ft openings220.0′4.0′
Two 10 ft openings222.0′2.0′

Jamb allowance of 0.5 ft per side is a stated planning input, not a manufacturer requirement.

Vehicle fit

What clears which opening

Vertical margin = opening height − published unit height

Vehicle or unitHeight8 ft opening10 ft opening14 ft opening
Pickup, planning envelope6.5′1′ 6″3′ 6″7′ 6″
Winnebago Travato (all floorplans)9.33′-1′ 4″0′ 8″4′ 8″
Winnebago Minnie Winnie 26T11′-3′ 0″-1′ 0″3′ 0″
Winnebago Adventurer 35F12.5′-4′ 6″-2′ 6″1′ 6″

A negative margin means the unit does not pass under that opening. RV heights are published manufacturer figures.

Limits

One thing this page will not tell you

No universal standard

There is no single standard garage door size. The sizes above are the openings most often ordered on steel buildings. Framing, headers and structural detail around an opening are the building manufacturer's design work, and nothing here substitutes for it.

Evidence

Where these numbers come from

Evidence record

Computed values are recalculated whenever this page renders. Published figures link to the source document. Planning inputs are shown as inputs so you can substitute your own.

Keep planning

Next step

Answers

Common questions

There is no single standard. Single openings are most often 9 ft wide and 7 or 8 ft high; doubles are most often 16 ft wide. Steel buildings also use 10 x 8, 12 x 10 and 14 x 14 openings for equipment and RVs.

Clopay's published installation literature gives 10 in for an extension spring on 12 in radius track, 12 in for a 15 in radius or a torsion spring on 12 in track, and 14 in for a torsion spring on 15 in track. Low-headroom kits reduce that to 4½ in or 9½ in.

The opening height plus the headroom your door needs, plus whatever the building's own framing takes. Using the largest published Clopay figure of 14 in, an 8 ft opening wants at least 9 ft 2 in of clear wall above the floor before framing.

More than the opening. Adding a half-foot jamb allowance on each side, a 16 ft opening consumes 17 ft of a wall, and two 9 ft openings consume 20 ft.

Continue your research

Related planning topics

Background reading on the questions this page raises. None of these pages sells anything.

Planning a building?

Get door openings quoted with the building

Door count, width and height change the price more than most buyers expect. Quote them together.

Requesting information does not require a purchase.