Most quote mistakes come from four words: span, eave height, ridge height and clear height. Each one measures something different, and only one of them is what a supplier asks for.

Written by Gary ThompsonSteel Building Research EditorReviewed by Find Steel Buildings Editorial Team

Terms defined
18
Anchored to
One labelled section
Ridge formula
eave + (span ÷ 2)(rise ÷ 12)
Excluded
Loads, spans, sizing

Diagram

One section, every dimension word on it

clear span 40eave height 14ridge height 20.67roof pitch 4:12
A 40 ft clear span at 14 ft eave and 4:12 pitch. Ridge height is computed, not drawn to a stated value.Computed section
Platform calculation

Ridge height = eave + (span ÷ 2) × (rise ÷ 12). On this section: 14 + (40 ÷ 2) × (4 ÷ 12) = 20.67 ft.

Glossary

What each term measures, and where it appears on a quote

Terms used on steel building quotes

TermWhat it measuresQuote fieldCommon confusion
Clear spanWidth between the inside faces of the sidewall columns, with no interior columnWidthQuoted width is usually the outside dimension, which is slightly larger
Eave heightGround to the point where the sidewall meets the roof lineHeightConfused with ridge height, which is always taller on a gable
Ridge heightGround to the peak of the roofNot usually asked for; it is derivedOrdering by ridge height gives you a shorter sidewall than expected
Clear heightFloor to the lowest overhead obstructionDoor and interior questionsAlways less than eave height once framing is in place
BayDistance between two adjacent main frames along the lengthLengthBuilding length is a whole number of bays, so lengths come in steps
Roof pitchRise in inches per 12 inches of horizontal runRoofStated as 3:12 rather than in degrees
GirtHorizontal wall member that panels attach toNot asked forMistaken for a structural column
PurlinHorizontal roof member that roof panels attach toNot asked forMistaken for a rafter
RafterSloping main frame member carrying the roofNot asked forMistaken for a purlin
ColumnVertical main frame memberNot asked forInterior columns are what a clear span removes
Framed openingA prepared opening for a door or windowDoors and windowsThe opening size, not the door size
Base angleAngle section at the base of the wall that panels fasten toNot asked forNot the same as the anchor bolts
Anchor boltBolt fixing a column base to the foundationFoundationSupplied by the building or the concrete contractor, depending on the order
Lean-toSingle-slope structure attached to a sidewallAdd-onsAdds footprint without adding clear span
MezzanineIntermediate floor inside the buildingInteriorNeeds clear height, not just eave height
TrimClosure and finish pieces at corners, eaves and openingsFinishColour choices are separate from panel colour
PanelThe formed steel sheet forming wall or roof surfaceFinishProfile and gauge are separate choices
Bay spacingThe chosen distance between main framesNot asked for directlyDetermined by the manufacturer's design, not by the buyer

Definitions only. This page states no span capacity, member size or load figure.

Practical

The four words that cause most quote errors

Span, eave height, ridge height and clear height all describe size, and only two of them are things you order. You choose the span and the eave height. Ridge height follows from those two plus the pitch. Clear height is what you can actually drive under, and it is always less than the eave height once the frame is in. Answering a supplier with a ridge height when they asked for an eave height produces a building shorter than you wanted.

Limits

What this page deliberately does not cover

Stated planning input

Planning assumptionBay spacing, member sizing, purlin and girt spacing, load values and foundation design are engineering outputs, specific to your site and your manufacturer. This page defines the words; it publishes no numbers for any of them.

Weighing options

Compare this against the alternative

A side-by-side walkthrough of the decision, written for buyers rather than engineers.

Evidence

Where these numbers come from

Evidence record

  • Platform calculation

    Roof pitch in degrees = arctan(rise / run)

    Computed on this page

  • Platform calculation

    Ridge height = eave height + (span / 2) x (rise / 12)

    Computed on this page

Computed values are recalculated whenever this page renders. Published figures link to the source document. Planning inputs are shown as inputs so you can substitute your own.

Keep planning

Next step

Answers

Common questions

The height from the floor to the point where the sidewall meets the roof line. It is the height figure a supplier asks you to choose, and it is always less than the ridge height on a gable building.

The width between the inside faces of the sidewall columns with no interior column in between. It is what makes an arena or a hangar usable, and it is the figure that moves the price most.

The distance between two adjacent main frames along the length of the building. It is set by the manufacturer's design for your building, not chosen from a table, which is why no numeric recommendation appears on this page.

Ridge height = eave height + (span ÷ 2) × (rise ÷ 12). A 40 ft span at 14 ft eave and 4:12 pitch gives 20.67 ft.

Continue your research

Related planning topics

Background reading on the questions this page raises. None of these pages sells anything.

Planning a building?

Ready to answer a supplier?

Give span, eave height and door openings once, and compare quotes that describe the same building.

Requesting information does not require a purchase.