Skip to content
Find Steel Buildings

Building Types

80x120 Steel Office Building

Width
80 ft
Length
120 ft
Floor area
9,600 sq ft
Perimeter
400 ft
Concept visualization of a steel office building at a representative 55 by 95 foot size; not a real project.
Example Configuration
steel office building concept visualization at a representative 55x95 size.Example configuration — for planning purposes only
Last updated Aug 27, 2026Reviewed under the Find Steel Buildings editorial standards

Quick dimensions

At a Glance

  • Width

    80 ft across the gable end.

  • Length

    120 ft along the sidewall.

  • Floor area

    9,600 sq ft of clear floor.

  • Eave height

    22 ft at the sidewall on the stored profile.

Get Quotes for a 80×120 Steel Office Building

Steel Office Building ✓80′ × 120′ ✓
Continue

Configuration

How This Building Is Configured

120′ length80′ width9,600 sq ft
Footprint drawn to the stated dimensions.Platform calculation

Configuration summary

Building typeSteel Office Building
Footprint80 ft × 120 ft
Floor area9,600 sq ft
Eave height22 ft

Planning

Footprint & Space Planning

  • Footprint

    Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.

  • Height

    Eave height affects door options, storage height and how open the interior feels.

  • Access

    Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.

  • Doors and openings

    Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.

  • Site

    Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.

  • Expansion

    Extending along the length is usually simpler than changing the width later, which is worth deciding up front.

Use

How a 80×120 Steel Office Building May Be Used

  • Customer-facing area

    Frontage, entry placement and glazing are planned with local requirements in mind.

  • Back-of-house

    Storage and staff areas are commonly separated from the public floor.

  • Parking and approach

    Site circulation often has more effect on the layout than the building itself.

  • Future fit-out

    Clear-span interiors leave partition placement to the fit-out stage.

Example

Example Configuration

Example configuration of a 80 by 120 foot steel office building
Steel Office Building shown as an example configuration — for planning purposes only. Doors, colors and openings are specified for the actual project.

Access

Doors & Access Considerations

  • Opening width

    Across a 80 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.

  • Opening height

    A 22 ft eave sets the ceiling on door height before any frame change.

  • Drive-through

    Matching openings at both ends avoid reversing, at the cost of usable wall.

Similar sizes

Other Sizes for a Steel Office Building

Related

Related Building Types

FAQ

Common Questions

80 ft × 120 ft is 9,600 square feet of floor area before any interior partitions.

Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.

Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.

Compare nearby sizes

Related footprints for this building type

Each page works through one footprint for one building type.

Overview

A 80x120 steel office building planned as an open working floor with enclosed space for the work that needs it

This page is ordered around the enclosed space that supports the open floor, because focus and call rooms are what make open desking usable and are the first thing cut.

The footprint holds 30 team zones — 5 across by 6 deep — and leaves 15 feet of depth for focus and call rooms at the floor's edge, so concentrated work has somewhere to go without booking a meeting room.

Read this footprint through its span. 80 feet across is the fixed constraint; 120 feet of length is the negotiable one, and at 1.5 to 1 the building is close to square, so movement runs in both directions. Two feet of spare width reads as nothing on a plan and as a great deal when a machine is being turned.

A 80 by 120 footprint is a clearly directional plan: 9,600 sq ft enclosed by 400 ft of wall, at a 1.5:1 length-to-width proportion. Along its 120 ft dimension it takes 7 runs of team zones at 16 ft, leaving 8 ft over — the 8 ft is where the argument about this size actually happens. Taken purely as arithmetic, 80 by 120 gives 5 team zones across the 80 ft dimension once 9 ft is reserved for movement, and 7 deep along the 120 ft dimension. Run as a an open working floor with enclosed space for the work that needs it, 1 ft across is below the 10 ft this use needs to be worth planning, so there are no focus rooms, so calls happen at desks and the open floor's noise becomes its defining feature Acoustic separation is specified for the specific partitions and ceilings rather than assumed from a layout.

This footprint is planned as an open working floor with enclosed space for the work that needs it. Spent as a square 98 by 98 instead, the same 9,600 sq ft would stand 6 team zones across rather than 5, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. Compared with a 80 by 90 of the same width, the extra depth here adds run rather than reach: it buys about 7 team zones in line, and every position past the second is retrieved by moving what stands in front of it. A building of this size behaves like a small yard under a roof: zones need to be defined, signed and left alone, or they migrate. The floor is occupied all day at varying densities, so circulation and acoustic separation matter more than desk count. Daylight depth from the window line shapes where desks are worth placing.

Planning assumptionPlatform calculation

Areas, perimeter, roof area, ridge height, slab volume and the team zone counts on this page are computed from the stored 80x120 record and this platform's planning module for the steel office building category.

Allocation

Dividing the floor for an open working floor with enclosed space for the work that needs it

The work pattern this floor could equally be planned around is an office of individual rooms, planned around privacy and corridors: there is no support core, so shared functions sit in the corridor and every use of them is heard through two doors. Open desking in the centre with enclosed rooms on the perimeter, keeping daylight shared rather than walled into offices.

Depth arithmetic leaves a working end zone here. 1,200 square feet sits past the last row, which is why 80x120 tends to be planned with focus and call rooms at the floor's edge, so concentrated work has somewhere to go without booking a meeting room designed in rather than added later. The plan is only as good as the route into it, which is a site question rather than a building one.

Spare width is the more valuable of the two leftovers here: a continuous 10-foot strip beats the same area stranded at the end of the run, because it touches every position along the way. Whoever operates the building daily should read the plan before it is frozen, because they know where the pinch points are.

Spent as a square 98 by 98 instead, the same 9,600 sq ft would stand 6 team zones across rather than 5, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. Compared with a 80 by 90 of the same width, the extra depth here adds run rather than reach: it buys about 7 team zones in line, and every position past the second is retrieved by moving what stands in front of it. A building of this size behaves like a small yard under a roof: zones need to be defined, signed and left alone, or they migrate. The floor is occupied all day at varying densities, so circulation and acoustic separation matter more than desk count. Daylight depth from the window line shapes where desks are worth placing. That movement pattern, not the 9,600-square-foot total, is what decides whether the leftover 15 feet is useful here.

Primary operating area72 × 80 ft · 5,760 sq ftCustomer or staff area26.4 × 80 ft · 2,112 sq ftBack of house and utility21.6 × 80 ft · 1,728 sq ft120 ft overall length
operating and support allocation allocation across the 120-foot length

Usable area

How the 9,600 square feet divides at 80x120

Computed team zone fit for a 80x120 steel office building

MeasureComputed at this footprint
Team zones across the 80-foot width5 at a 14-foot module
Leftover width10 ft (1,200 sq ft as a full-length strip)
Rows along the 120-foot length6 at a 16-foot module after 9 ft of circulation
Leftover depth15 ft (1,200 sq ft across the width)
Total team zones30
Share of floor committed70%

Module footprint used here is 14 by 16 feet, this platform's planning module for a steel office building. It is not a code minimum or an engineered clearance.

Example allocation of the 120-foot length — planning model, not survey data

ZoneLength along the buildingComputed area
Primary operating area72 ft5,760 sq ft
Customer or staff area26.4 ft2,112 sq ft
Back of house and utility21.6 ft1,728 sq ft

Shares applied to the stored 120-foot length; areas computed against the 80-foot width.

Planning assumptionPlanning guidance

Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.

Configurations

Configuring 30 team zones at 80x120

Nominal bay division computes to 5 bays at about 24 feet, wider than the 14-foot module — so a position can sit inside a bay without a frame line splitting it. Daylight placement changes how a floor is used far more than its cost suggests.

Two-plus rows change the access question entirely. Every rear position at 80x120 needs either its own opening or an aisle, and 10 feet of spare width is what that aisle has to come from. Security and after-hours access are easier to design in the door layout than to bolt on later.

Density increases before area does, which makes the initial provision of enclosed rooms a decision about the floor's future rather than its present.

Configured as an open working floor with enclosed space for the work that needs it, 80x120 is judged on whether the 30 team zones it holds match the operation, and on whether the 10 feet of spare width leaves the route this mode depends on.

  • Does the work need racking or work zones on both sides with a full vehicle lane down the middle, or does it need a second lane that this 80-foot span cannot give?
  • Is the 120-foot length being bought for depth, or for the repeated bays — a long repeating bay sequence, so segment boundaries are set by bay lines rather than by walls?
  • What finished ceiling height do you want, and what service zone sits above it?
  • Where does the service core go, and does the desk plan work around it?
Planning assumptionTypical configuration

Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.

Height

Interior height for a 80x120 steel office building

Across a 80-foot span the 4:12 pitch adds 13.3 feet between eave and ridge. The centreline measures 35.3 feet; anything parked or stacked near a wall lives with the 22-foot eave. The span is the commitment; everything inside it is rearrangeable later, and the 80-foot dimension is not.

Height affects acoustics and services distribution. Acoustic treatment is specified for the specific floor plate.

Ventilation across 9,600 square feet at this height: continuous occupancy at desk density makes air handling a core system rather than an accessory.

Planning assumptionPlanning guidance

Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.

Openings

Openings for 5 team zones across

One opening per position works on this gable: 5 across 80 feet, with 10 feet of wall to distribute as piers. Splitting that margin evenly is what keeps the elevation buildable. Doors and their approaches decide more about daily use here than the enclosed area does.

The 80 ft ends and the 120 ft sides offer very different opening budgets: 80 ft of end wall has room for one wide opening or two modest ones, while 120 ft of side wall can carry several without the openings competing. On this plan the deciding factor is whether open plan office floor or focus and call rooms should be the first thing reached from the door.

Planning assumptionEngineering-required

Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.

Comparison

What changes at adjacent footprints

Computed comparison of nearby footprints for a steel office building

FootprintFloor areaTeam zones
50x804,000 sq ft12 (3 x 4)
40x1004,000 sq ft18 (3 x 6)
60x804,800 sq ft16 (4 x 4)
40x1204,800 sq ft21 (3 x 7)
50x1005,000 sq ft28 (4 x 7)

Areas computed from each stored size record; team zone counts computed with the same 14 by 16 foot planning module.

  • 50x80 moves the count from 30 to 12 team zones (3 across by 4 deep), which is the reason to choose between them.
  • 40x100 moves the count from 30 to 18 team zones (3 across by 6 deep), which is the reason to choose between them.
  • 60x80 moves the count from 30 to 16 team zones (4 across by 4 deep), which is the reason to choose between them.

Nearby footprints read for a steel office building: exact change in area and in planning team zones

FootprintArea Δ% ΔTeam zones at that footprintWhat changes for this use
100x100+400 sq ft+4.2%35 (7 x 5)+5 team zones on the same planning module.
60x150−600 sq ft−6.2%36 (4 x 9)+6 team zones on the same planning module.
80x100−1,600 sq ft−16.7%25 (5 x 5)−5 team zones on the same planning module.
80x150+2,400 sq ft+25%60 (6 x 10)+30 team zones on the same planning module.

Areas are arithmetic on two stored size records; team zone counts use this platform's 14 by 16 foot planning module and are not a capacity statement.

Because this footprint is planned as an open working floor with enclosed space for the work that needs it, the useful next reads are different from the ones a differently shaped steel office building suggests: open plan office floor, focus and call rooms, daylight distribution.

Visualization

Reading the 80x120 footprint as a steel office building

120′ length80′ width9,600 sq ft
80x120 footprint plan, drawn from the stored dimensional record
22′ eave35.3′ ridge4:12 pitch · 80′ clear span
Gable cross section at a 22-foot eave and 4:12 pitch, computing to a 35.3-foot ridge

FAQ

Questions about 80x120 steel office building projects

The width leaves 10 feet spare after 5 team zones. That margin absorbs wall storage and passing room. Width is the dimension that cannot be extended later.

Reserving 9 ft across the 80 ft dimension for movement leaves 71 ft of working width, which takes 5 team zones at 14 ft. Along 120 ft it takes 7 runs at 16 ft. That is 35 positions out of 9,600 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on where does someone go to concentrate, and where do they go to take a call. These are planning figures computed from the footprint, not a quoted layout.

Length here buys 6 rows and 5 nominal bays; width buys 5 positions side by side. At this aspect ratio both dimensions are still adding usable positions.

It walls off daylight for the few. Placing them on the internal edge and keeping the window line open shares the daylight across the floor.

The plan is re-partitioned as headcount changes; adding building length is a late resort compared with re-planning Practically, the 120-foot dimension is the one that extends; the 80-foot span is fixed once the frames are set.

Methodology

How this page was produced

Sources and methodology

Verified sourceExternal factual sources
  • Find Steel Buildings dimensional records

    Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.

  • International Building Code and International Residential Code

    International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.

Platform calculationComputed on this platform
  • Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
  • Team zone fit: Counts, leftover strips and per-module areas are computed from the stored 80x120 record against this platform's 14 by 16 foot planning module for the steel office building category, with 9 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
  • Allocation model: Zone shares come from this platform's use typology for commercial and customer-facing operations and are applied arithmetically to the stored 120-foot length.
Planning assumptionPlanning assumptions
  • Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
  • Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.

Methodology notes

  • Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.

Cost drivers

Quantities that move the estimate at 80x120

Quantities, not prices, are publishable here: roof cladding runs 10,119 square feet — 5% above the 9,600-square-foot floor at a 4:12 pitch — with 177.8 cubic yards of nominal slab beneath it. The building is fixed for decades while the operation inside it changes every few years, and the plan has to survive that.

Proportion drives cost here as much as size does: 400 ft of wall around 9,600 sq ft is 0.042 ft of wall per enclosed square foot, and a squarer plan of the same area would carry less. What moves the figure further on a an open working floor with enclosed space for the work that needs it is the fit-out open plan office floor implies, along with framed openings and the height chosen for the 80 ft span.

  • interior partitions, ceilings and finishes across the whole floor
  • the service core with restrooms and kitchen
  • air handling for continuous occupancy
  • small-power and data distribution density
Why we don't quote thisWe do not state 80x120 steel office building pricing here, because it varies too much to give an honest figure. Published only with a documented inclusion basis, a collection date and a named source.

Drawn to scale

Plans and dimensions

Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.

120′ length80′ width9,600 sq ft
Computed from stored dimensions
Footprint plan — 80′ × 120′, drawn to the stored dimensions.Platform calculation
Front third3,200 sq ftCenter third3,200 sq ftRear third3,200 sq ft80′ × 120′ floor plate
Computed from stored dimensions
Floor plate divided into equal thirds along the length; each area is computed from the stored footprint.Platform calculation

Continue your research

Related planning topics

Background reading on the questions this page raises. None of these pages sells anything.

Compare 80x120 steel office building configurations

Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.

Get a Quote