Skip to content
Find Steel Buildings

Building Types

80x100 Steel Office Building

Width
80 ft
Length
100 ft
Floor area
8,000 sq ft
Perimeter
360 ft
Concept visualization of a steel office building at a representative 55 by 95 foot size; not a real project.
Example Configuration
steel office building concept visualization at a representative 55x95 size.Example configuration — for planning purposes only
Last updated Aug 27, 2026Reviewed under the Find Steel Buildings editorial standards

Quick dimensions

At a Glance

  • Width

    80 ft across the gable end.

  • Length

    100 ft along the sidewall.

  • Floor area

    8,000 sq ft of clear floor.

  • Eave height

    20 ft at the sidewall on the stored profile.

Get Quotes for a 80×100 Steel Office Building

Steel Office Building ✓80′ × 100′ ✓
Continue

Configuration

How This Building Is Configured

100′ length80′ width8,000 sq ft
Footprint drawn to the stated dimensions.Platform calculation

Configuration summary

Building typeSteel Office Building
Footprint80 ft × 100 ft
Floor area8,000 sq ft
Eave height20 ft

Planning

Footprint & Space Planning

  • Footprint

    Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.

  • Height

    Eave height affects door options, storage height and how open the interior feels.

  • Access

    Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.

  • Doors and openings

    Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.

  • Site

    Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.

  • Expansion

    Extending along the length is usually simpler than changing the width later, which is worth deciding up front.

Use

How a 80×100 Steel Office Building May Be Used

  • Customer-facing area

    Frontage, entry placement and glazing are planned with local requirements in mind.

  • Back-of-house

    Storage and staff areas are commonly separated from the public floor.

  • Parking and approach

    Site circulation often has more effect on the layout than the building itself.

  • Future fit-out

    Clear-span interiors leave partition placement to the fit-out stage.

Example

Example Configuration

Example configuration of a 80 by 100 foot steel office building
Steel Office Building shown as an example configuration — for planning purposes only. Doors, colors and openings are specified for the actual project.

Access

Doors & Access Considerations

  • Opening width

    Across a 80 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.

  • Opening height

    A 20 ft eave sets the ceiling on door height before any frame change.

  • Drive-through

    Matching openings at both ends avoid reversing, at the cost of usable wall.

Similar sizes

Other Sizes for a Steel Office Building

Related

Related Building Types

FAQ

Common Questions

80 ft × 100 ft is 8,000 square feet of floor area before any interior partitions.

Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.

Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.

Compare nearby sizes

Related footprints for this building type

Each page works through one footprint for one building type.

Cost drivers

Quantities that move the estimate at 80x100

Quantities, not prices, are publishable here: roof cladding runs 8,433 square feet — 5% above the 8,000-square-foot floor at a 4:12 pitch — with 148.1 cubic yards of nominal slab beneath it. Rows that cannot be entered independently end up used as one long space.

Proportion drives cost here as much as size does: 360 ft of wall around 8,000 sq ft is 0.045 ft of wall per enclosed square foot, and a squarer plan of the same area would carry less. What moves the figure further on a an open working floor with enclosed space for the work that needs it is the fit-out open plan office floor implies, along with framed openings and the height chosen for the 80 ft span.

  • interior partitions, ceilings and finishes across the whole floor
  • the service core with restrooms and kitchen
  • air handling for continuous occupancy
  • small-power and data distribution density
Why we don't quote thisWe do not state 80x100 steel office building pricing here, because it varies too much to give an honest figure. Published only with a documented inclusion basis, a collection date and a named source.

Overview

A 80x100 steel office building planned as an open working floor with enclosed space for the work that needs it

This page is ordered around the door between the quiet side and the working side, because that interface is what a combined building actually has to solve.

The footprint holds 25 team zones — 5 across by 5 deep — and leaves 11 feet of depth for focus and call rooms at the floor's edge, so concentrated work has somewhere to go without booking a meeting room.

Commitment first: 70% of the 8,000 square feet goes to team zones at 224 square feet each, and 1,880 square feet survives as edge strip. A footprint is worth its own decision when that split lands where the work does. Set the openings before the interior, because the openings cannot move and the interior can.

A 80 by 100 footprint is a mildly directional plan: 8,000 sq ft enclosed by 360 ft of wall, at a 1.3:1 length-to-width proportion. Along its 100 ft dimension it takes 6 runs of team zones at 16 ft, leaving 4 ft over — the 4 ft is where the argument about this size actually happens. An open floor works when the enclosed space that supports it exists. Focus rooms, call booths and a quiet edge are not extras; they are the parts that make the open area usable, and they are what get cut first. Occupant load, egress and accessibility are determined for the specific project by the design professional and the authority having jurisdiction.

This footprint is planned as an open working floor with enclosed space for the work that needs it. Spent as a square 89 by 89 instead, the same 8,000 sq ft would stand 5 team zones across rather than 5, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. Compared with a 80 by 80 of the same width, the extra depth here adds run rather than reach: it buys about 6 team zones in line, and every position past the second is retrieved by moving what stands in front of it. A building of this size behaves like a small yard under a roof: zones need to be defined, signed and left alone, or they migrate. The floor is occupied all day at varying densities, so circulation and acoustic separation matter more than desk count. Heating and cooling zoning follows occupancy patterns rather than the floor plate.

Planning assumptionPlatform calculation

Areas, perimeter, roof area, ridge height, slab volume and the team zone counts on this page are computed from the stored 80x100 record and this platform's planning module for the steel office building category.

Configurations

Configuring 25 team zones at 80x100

Nominal bay division computes to 4 bays at about 25 feet, wider than the 14-foot module — so a position can sit inside a bay without a frame line splitting it. Fire separation, egress and occupancy are determined for the specific building and can reshape this plan entirely.

With 5 rows deep, the rear row is behind the front one. Without a route past it, those team zones become storage positions rather than working ones — the real cost of depth at this width. The mezzanine that is added afterwards is the change order that reprices the frame.

Density increases before area does, which makes the initial provision of enclosed rooms a decision about the floor's future rather than its present.

Configured as an open working floor with enclosed space for the work that needs it, 80x100 is judged on whether the 25 team zones it holds match the operation, and on whether the 10 feet of spare width leaves the route this mode depends on.

  • Does the work need racking or work zones on both sides with a full vehicle lane down the middle, or does it need a second lane that this 80-foot span cannot give?
  • Is the 100-foot length being bought for depth, or for the repeated bays — eight to ten repeated bays, which makes the layout a scheduling problem as much as a spatial one?
  • What finished ceiling height do you want, and what service zone sits above it?
  • Where does the service core go, and does the desk plan work around it?
Planning assumptionTypical configuration

Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.

Openings

Openings for 5 team zones across

The 80-foot gable can carry 5 openings, one per team zone, with 10 feet of wall left for piers between and beside them — the arrangement that keeps each position independently reachable. Judge the plan by what has to happen on the worst day of the year, not on an average one.

One main entrance plus daylight distribution, which is a window and depth question rather than a door one.

Planning assumptionEngineering-required

Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.

Allocation

Dividing the floor for an open working floor with enclosed space for the work that needs it

The work pattern this floor could equally be planned around is office space attached to a working or storage area in one building: there is no transition zone, so the working side's dirt, noise and traffic arrive in the office through a single door. Dividing the 8,000 sq ft by the 14 by 16 ft team zone gives roughly 30 positions before circulation is deducted a second time for cross movement. Whether the plan keeps 30 or drops to 24 comes back to the question this footprint is really answering: where does someone go to concentrate, and where do they go to take a call?

Because 11 feet clears the 10 feet this platform treats as usable, the end of the run is a room rather than a gap: 880 square feet for focus and call rooms at the floor's edge, so concentrated work has somewhere to go without booking a meeting room. Where the building sits on the site changes how much of this floor is genuinely reachable.

Spare width is the more valuable of the two leftovers here: a continuous 10-foot strip beats the same area stranded at the end of the run, because it touches every position along the way. Snow, wind and site exposure change what this shape costs to build long before the interior plan does.

Spent as a square 89 by 89 instead, the same 8,000 sq ft would stand 5 team zones across rather than 5, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. Compared with a 80 by 80 of the same width, the extra depth here adds run rather than reach: it buys about 6 team zones in line, and every position past the second is retrieved by moving what stands in front of it. A building of this size behaves like a small yard under a roof: zones need to be defined, signed and left alone, or they migrate. The floor is occupied all day at varying densities, so circulation and acoustic separation matter more than desk count. Heating and cooling zoning follows occupancy patterns rather than the floor plate. That movement pattern, not the 8,000-square-foot total, is what decides whether the leftover 11 feet is useful here.

Primary operating area60 × 80 ft · 4,800 sq ftCustomer or staff area22 × 80 ft · 1,760 sq ftBack of house and utility18 × 80 ft · 1,440 sq ft100 ft overall length
operating and support allocation allocation across the 100-foot length

Usable area

How the 8,000 square feet divides at 80x100

Computed team zone fit for a 80x100 steel office building

MeasureComputed at this footprint
Team zones across the 80-foot width5 at a 14-foot module
Leftover width10 ft (1,000 sq ft as a full-length strip)
Rows along the 100-foot length5 at a 16-foot module after 9 ft of circulation
Leftover depth11 ft (880 sq ft across the width)
Total team zones25
Share of floor committed70%

Module footprint used here is 14 by 16 feet, this platform's planning module for a steel office building. It is not a code minimum or an engineered clearance.

Example allocation of the 100-foot length — planning model, not survey data

ZoneLength along the buildingComputed area
Primary operating area60 ft4,800 sq ft
Customer or staff area22 ft1,760 sq ft
Back of house and utility18 ft1,440 sq ft

Shares applied to the stored 100-foot length; areas computed against the 80-foot width.

Planning assumptionPlanning guidance

Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.

Height

Interior height for a 80x100 steel office building

Span drives headroom at 80x100: 80 feet of width on a 4:12 pitch puts 33.3 feet over the middle and 20 feet at the walls, so where a tall item stands matters as much as how tall it is. Storage expands until it meets a wall, so give it a wall on purpose.

Height on a 80 ft span is a separate decision from the 100 ft length, and it is the span that sets the frame's behavior. Raising the eave over 8,000 sq ft affects every bay along the 100 ft dimension, so the test is whether open plan office floor genuinely needs the extra clear height or only the floor area.

Ventilation across 8,000 square feet at this height: continuous occupancy at desk density makes air handling a core system rather than an accessory.

Planning assumptionPlanning guidance

Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.

Comparison

What changes at adjacent footprints

Computed comparison of nearby footprints for a steel office building

FootprintFloor areaTeam zones
40x803,200 sq ft8 (2 x 4)
60x603,600 sq ft12 (4 x 3)
50x804,000 sq ft12 (3 x 4)
40x1004,000 sq ft18 (3 x 6)
60x804,800 sq ft16 (4 x 4)

Areas computed from each stored size record; team zone counts computed with the same 14 by 16 foot planning module.

  • 40x80 moves the count from 25 to 8 team zones (2 across by 4 deep), which is the reason to choose between them.
  • 60x60 moves the count from 25 to 12 team zones (4 across by 3 deep), which is the reason to choose between them.
  • 50x80 moves the count from 25 to 12 team zones (3 across by 4 deep), which is the reason to choose between them.

Nearby footprints read for a steel office building: exact change in area and in planning team zones

FootprintArea Δ% ΔTeam zones at that footprintWhat changes for this use
50x150−500 sq ft−6.2%27 (3 x 9)+2 team zones on the same planning module.
60x150+1,000 sq ft+12.5%36 (4 x 9)+11 team zones on the same planning module.
80x120+1,600 sq ft+20%30 (5 x 6)+5 team zones on the same planning module.
80x80−1,600 sq ft−20%20 (5 x 4)−5 team zones on the same planning module.

Areas are arithmetic on two stored size records; team zone counts use this platform's 14 by 16 foot planning module and are not a capacity statement.

Because this footprint is planned as an open working floor with enclosed space for the work that needs it, the useful next reads are different from the ones a differently shaped steel office building suggests: open plan office floor, focus and call rooms, daylight distribution.

Visualization

Reading the 80x100 footprint as a steel office building

100′ length80′ width8,000 sq ft
80x100 footprint plan, drawn from the stored dimensional record
20′ eave33.3′ ridge4:12 pitch · 80′ clear span
Gable cross section at a 20-foot eave and 4:12 pitch, computing to a 33.3-foot ridge

FAQ

Questions about 80x100 steel office building projects

Length here buys 5 rows and 4 nominal bays; width buys 5 positions side by side. At this aspect ratio both dimensions are still adding usable positions.

Reserving 9 ft across the 80 ft dimension for movement leaves 71 ft of working width, which takes 5 team zones at 14 ft. Along 100 ft it takes 6 runs at 16 ft. That is 30 positions out of 8,000 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on where does someone go to concentrate, and where do they go to take a call. These are planning figures computed from the footprint, not a quoted layout.

The plan is re-partitioned as headcount changes; adding building length is a late resort compared with re-planning Practically, the 100-foot dimension is the one that extends; the 80-foot span is fixed once the frames are set.

It walls off daylight for the few. Placing them on the internal edge and keeping the window line open shares the daylight across the floor.

About 880 square feet across the width — enough for focus and call rooms at the floor's edge, so concentrated work has somewhere to go without booking a meeting room.

Methodology

How this page was produced

Sources and methodology

Verified sourceExternal factual sources
  • Find Steel Buildings dimensional records

    Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.

  • International Building Code and International Residential Code

    International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.

Platform calculationComputed on this platform
  • Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
  • Team zone fit: Counts, leftover strips and per-module areas are computed from the stored 80x100 record against this platform's 14 by 16 foot planning module for the steel office building category, with 9 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
  • Allocation model: Zone shares come from this platform's use typology for commercial and customer-facing operations and are applied arithmetically to the stored 100-foot length.
Planning assumptionPlanning assumptions
  • Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
  • Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.

Methodology notes

  • Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.

Drawn to scale

Plans and dimensions

Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.

100′ length80′ width8,000 sq ft
Computed from stored dimensions
Footprint plan — 80′ × 100′, drawn to the stored dimensions.Platform calculation
Front third2,667 sq ftCenter third2,667 sq ftRear third2,667 sq ft80′ × 100′ floor plate
Computed from stored dimensions
Floor plate divided into equal thirds along the length; each area is computed from the stored footprint.Platform calculation

Continue your research

Related planning topics

Background reading on the questions this page raises. None of these pages sells anything.

Compare 80x100 steel office building configurations

Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.

Get a Quote