Skip to content
Find Steel Buildings

Building Types

80x150 Steel Office Building

Width
80 ft
Length
150 ft
Floor area
12,000 sq ft
Perimeter
460 ft
Concept visualization of a steel office building at a representative 55 by 95 foot size; not a real project.
Example Configuration
steel office building concept visualization at a representative 55x95 size.Example configuration — for planning purposes only
Last updated Aug 27, 2026Reviewed under the Find Steel Buildings editorial standards

Quick dimensions

At a Glance

  • Width

    80 ft across the gable end.

  • Length

    150 ft along the sidewall.

  • Floor area

    12,000 sq ft of clear floor.

  • Eave height

    24 ft at the sidewall on the stored profile.

Get Quotes for a 80×150 Steel Office Building

Steel Office Building ✓80′ × 150′ ✓
Continue

Configuration

How This Building Is Configured

150′ length80′ width12,000 sq ft
Footprint drawn to the stated dimensions.Platform calculation

Configuration summary

Building typeSteel Office Building
Footprint80 ft × 150 ft
Floor area12,000 sq ft
Eave height24 ft

Planning

Footprint & Space Planning

  • Footprint

    Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.

  • Height

    Eave height affects door options, storage height and how open the interior feels.

  • Access

    Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.

  • Doors and openings

    Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.

  • Site

    Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.

  • Expansion

    Extending along the length is usually simpler than changing the width later, which is worth deciding up front.

Use

How a 80×150 Steel Office Building May Be Used

  • Customer-facing area

    Frontage, entry placement and glazing are planned with local requirements in mind.

  • Back-of-house

    Storage and staff areas are commonly separated from the public floor.

  • Parking and approach

    Site circulation often has more effect on the layout than the building itself.

  • Future fit-out

    Clear-span interiors leave partition placement to the fit-out stage.

Example

Example Configuration

Example configuration of a 80 by 150 foot steel office building
Steel Office Building shown as an example configuration — for planning purposes only. Doors, colors and openings are specified for the actual project.

Access

Doors & Access Considerations

  • Opening width

    Across a 80 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.

  • Opening height

    A 24 ft eave sets the ceiling on door height before any frame change.

  • Drive-through

    Matching openings at both ends avoid reversing, at the cost of usable wall.

Similar sizes

Other Sizes for a Steel Office Building

  • 130′ length80′ width10,400 sq ft

    80′ × 130′

    10,400 sq ft

  • 170′ length80′ width13,600 sq ft

    80′ × 170′

    13,600 sq ft

  • 150′ length70′ width10,500 sq ft

    70′ × 150′

    10,500 sq ft

Related

Related Building Types

FAQ

Common Questions

80 ft × 150 ft is 12,000 square feet of floor area before any interior partitions.

Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.

Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.

Compare nearby sizes

Related footprints for this building type

Each page works through one footprint for one building type.

Overview

A 80x150 steel office building planned as an office visitors come to, planned around arrival and meeting

This page is ordered around the enclosed space that supports the open floor, because focus and call rooms are what make open desking usable and are the first thing cut.

The footprint holds 60 front-of-house zones — 6 across by 10 deep — and the remaining 2 feet is marginal: there is no reception depth, so visitors arrive directly into the work floor and every arrival interrupts it.

Read this footprint through its span. 80 feet across is the fixed constraint; 150 feet of length is the negotiable one, and at 1.88 to 1 the building is long for its width, so movement runs front to back. Snow, wind and site exposure change what this shape costs to build long before the interior plan does.

A 80 by 150 footprint is a clearly directional plan: 12,000 sq ft enclosed by 460 ft of wall, at a 1.9:1 length-to-width proportion. Along its 150 ft dimension it takes 10 runs of front-of-house zones at 14 ft, leaving 10 ft over — the 10 ft is where the argument about this size actually happens. Taken purely as arithmetic, 80 by 150 gives 6 front-of-house zones across the 80 ft dimension once 8 ft is reserved for movement, and 10 deep along the 150 ft dimension. Run as a an office visitors come to, planned around arrival and meeting, 0 ft across is below the 8 ft this use needs to be worth planning, so there is no reception depth, so visitors arrive directly into the work floor and every arrival interrupts it Heating and cooling zoning follows occupancy patterns rather than the floor plate.

At 80x150 the operating question is a specific one: where does a visitor stand in the first thirty seconds after opening the door? That is a different question from the one a steel office building of another shape has to answer, and it is why this footprint is planned as an office visitors come to, planned around arrival and meeting rather than as generic covered area.

Planning assumptionPlatform calculation

Areas, perimeter, roof area, ridge height, slab volume and the front-of-house zone counts on this page are computed from the stored 80x150 record and this platform's planning module for the steel office building category.

Allocation

Dividing the floor for an office visitors come to, planned around arrival and meeting

The work pattern this floor could equally be planned around is office space attached to a working or storage area in one building: there is no transition zone, so the working side's dirt, noise and traffic arrive in the office through a single door. Dividing the 12,000 sq ft by the 12 by 14 ft front-of-house zone gives roughly 60 positions before circulation is deducted a second time for cross movement. Whether the plan keeps 60 or drops to 50 comes back to the question this footprint is really answering: where does a visitor stand in the first thirty seconds after opening the door?

The 2-foot leftover depth falls under the 8 feet this platform treats as usable for a steel office building, so there is no reception depth, so visitors arrive directly into the work floor and every arrival interrupts it. Fire separation, egress and occupancy are determined for the specific building and can reshape this plan entirely.

Spare width is the more valuable of the two leftovers here: a continuous 8-foot strip beats the same area stranded at the end of the run, because it touches every position along the way. The mezzanine that is added afterwards is the change order that reprices the frame.

Compared with a 80 by 110 of the same width, the extra depth here adds run rather than reach: it buys about 10 front-of-house zones in line, and every position past the second is retrieved by moving what stands in front of it. Spent as a square 110 by 110 instead, the same 12,000 sq ft would stand 8 front-of-house zones across rather than 6, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. A building of this size behaves like a small yard under a roof: zones need to be defined, signed and left alone, or they migrate. Two populations use the building — staff continuously and visitors briefly — and keeping their routes apart is the whole layout discipline. Occupant load, egress and accessibility are determined for the specific project by the design professional and the authority having jurisdiction. That movement pattern, not the 12,000-square-foot total, is what decides whether the leftover 2 feet is useful here.

Primary operating area90 × 80 ft · 7,200 sq ftCustomer or staff area33 × 80 ft · 2,640 sq ftBack of house and utility27 × 80 ft · 2,160 sq ft150 ft overall length
operating and support allocation allocation across the 150-foot length

Usable area

How the 12,000 square feet divides at 80x150

Computed front-of-house zone fit for a 80x150 steel office building

MeasureComputed at this footprint
Front-of-house zones across the 80-foot width6 at a 12-foot module
Leftover width8 ft (1,200 sq ft as a full-length strip)
Rows along the 150-foot length10 at a 14-foot module after 8 ft of circulation
Leftover depth2 ft (160 sq ft across the width)
Total front-of-house zones60
Share of floor committed84%

Module footprint used here is 12 by 14 feet, this platform's planning module for a steel office building. It is not a code minimum or an engineered clearance.

Example allocation of the 150-foot length — planning model, not survey data

ZoneLength along the buildingComputed area
Primary operating area90 ft7,200 sq ft
Customer or staff area33 ft2,640 sq ft
Back of house and utility27 ft2,160 sq ft

Shares applied to the stored 150-foot length; areas computed against the 80-foot width.

Planning assumptionPlanning guidance

Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.

Configurations

Configuring 60 front-of-house zones at 80x150

Nominal bay division computes to 6 bays at about 25 feet, wider than the 12-foot module — so a position can sit inside a bay without a frame line splitting it. Storage expands until it meets a wall, so give it a wall on purpose.

Two-plus rows change the access question entirely. Every rear position at 80x150 needs either its own opening or an aisle, and 8 feet of spare width is what that aisle has to come from. Judge the plan by what has to happen on the worst day of the year, not on an average one.

The working floor grows behind; the front of house rarely changes once it is set.

Configured as an office visitors come to, planned around arrival and meeting, 80x150 is judged on whether the 60 front-of-house zones it holds match the operation, and on whether the 8 feet of spare width leaves the route this mode depends on.

  • Does the work need racking or work zones on both sides with a full vehicle lane down the middle, or does it need a second lane that this 80-foot span cannot give?
  • Is the 150-foot length being bought for depth, or for the repeated bays — a long repeating bay sequence, so segment boundaries are set by bay lines rather than by walls?
  • What finished ceiling height do you want, and what service zone sits above it?
  • Where does the service core go, and does the desk plan work around it?
Planning assumptionTypical configuration

Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.

Height

Interior height for a 80x150 steel office building

Across a 80-foot span the 4:12 pitch adds 13.3 feet between eave and ridge. The centreline measures 37.3 feet; anything parked or stacked near a wall lives with the 24-foot eave. Rows that cannot be entered independently end up used as one long space.

Height on a 80 ft span is a separate decision from the 150 ft length, and it is the span that sets the frame's behavior. Raising the eave over 12,000 sq ft affects every bay along the 150 ft dimension, so the test is whether client facing office layout genuinely needs the extra clear height or only the floor area.

Ventilation across 12,000 square feet at this height: continuous occupancy at desk density makes air handling a core system rather than an accessory.

Planning assumptionPlanning guidance

Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.

Openings

Openings for 6 front-of-house zones across

The 80-foot gable can carry 6 openings, one per front-of-house zone, with 8 feet of wall left for piers between and beside them — the arrangement that keeps each position independently reachable. Circulation width is the first thing surrendered under pressure and the first thing missed afterwards.

A legible main entrance and, where the plan allows, a staff entrance so arriving staff do not pass through reception.

Planning assumptionEngineering-required

Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.

Cost drivers

Quantities that move the estimate at 80x150

Quantities, not prices, are publishable here: roof cladding runs 12,649 square feet — 5% above the 12,000-square-foot floor at a 4:12 pitch — with 222.2 cubic yards of nominal slab beneath it. Two feet of spare width reads as nothing on a plan and as a great deal when a machine is being turned.

Front-of-house finishes, meeting-room acoustics and the accessible restroom carry disproportionate cost relative to their area.

  • interior partitions, ceilings and finishes across the whole floor
  • the service core with restrooms and kitchen
  • air handling for continuous occupancy
  • small-power and data distribution density
Why we don't quote thisWe do not state 80x150 steel office building pricing here, because it varies too much to give an honest figure. Published only with a documented inclusion basis, a collection date and a named source.

Comparison

What changes at adjacent footprints

Computed comparison of nearby footprints for a steel office building

FootprintFloor areaFront-of-house zones
60x804,800 sq ft16 (4 x 4)
40x1204,800 sq ft21 (3 x 7)
50x1005,000 sq ft28 (4 x 7)
60x1006,000 sq ft20 (4 x 5)
50x1206,000 sq ft21 (3 x 7)

Areas computed from each stored size record; front-of-house zone counts computed with the same 12 by 14 foot planning module.

  • 60x80 moves the count from 60 to 16 front-of-house zones (4 across by 4 deep), which is the reason to choose between them.
  • 40x120 moves the count from 60 to 21 front-of-house zones (3 across by 7 deep), which is the reason to choose between them.
  • 50x100 moves the count from 60 to 28 front-of-house zones (4 across by 7 deep), which is the reason to choose between them.

Nearby footprints read for a steel office building: exact change in area and in planning front-of-house zones

FootprintArea Δ% ΔFront-of-house zones at that footprintWhat changes for this use
100x100−2,000 sq ft−16.7%35 (7 x 5)−25 front-of-house zones on the same planning module.
80x120−2,400 sq ft−20%30 (5 x 6)−30 front-of-house zones on the same planning module.
100x150+3,000 sq ft+25%80 (8 x 10)+20 front-of-house zones on the same planning module.
60x150−3,000 sq ft−25%36 (4 x 9)−24 front-of-house zones on the same planning module.

Areas are arithmetic on two stored size records; front-of-house zone counts use this platform's 12 by 14 foot planning module and are not a capacity statement.

Because this footprint is planned as an office visitors come to, planned around arrival and meeting, the useful next reads are different from the ones a differently shaped steel office building suggests: client facing office layout, reception and waiting, visitor route separation.

Visualization

Reading the 80x150 footprint as a steel office building

150′ length80′ width12,000 sq ft
80x150 footprint plan, drawn from the stored dimensional record
24′ eave37.3′ ridge4:12 pitch · 80′ clear span
Gable cross section at a 24-foot eave and 4:12 pitch, computing to a 37.3-foot ridge

FAQ

Questions about 80x150 steel office building projects

The width leaves 8 feet spare after 6 front-of-house zones. That margin absorbs wall storage and passing room. Width is the dimension that cannot be extended later.

Reserving 8 ft across the 80 ft dimension for movement leaves 72 ft of working width, which takes 6 front-of-house zones at 12 ft. Along 150 ft it takes 10 runs at 14 ft. That is 60 positions out of 12,000 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on where does a visitor stand in the first thirty seconds after opening the door. These are planning figures computed from the footprint, not a quoted layout.

Length here buys 10 rows and 6 nominal bays; width buys 6 positions side by side. At this aspect ratio the building is already long for its span, so extra length adds depth rather than capacity.

Adjoining reception, so visitors reach them without crossing the working floor. Deep meeting rooms interrupt everyone twice per meeting.

The plan is re-partitioned as headcount changes; adding building length is a late resort compared with re-planning Practically, the 150-foot dimension is the one that extends; the 80-foot span is fixed once the frames are set.

Methodology

How this page was produced

Sources and methodology

Verified sourceExternal factual sources
  • Find Steel Buildings dimensional records

    Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.

  • International Building Code and International Residential Code

    International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.

Platform calculationComputed on this platform
  • Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
  • Front-of-house zone fit: Counts, leftover strips and per-module areas are computed from the stored 80x150 record against this platform's 12 by 14 foot planning module for the steel office building category, with 8 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
  • Allocation model: Zone shares come from this platform's use typology for commercial and customer-facing operations and are applied arithmetically to the stored 150-foot length.
Planning assumptionPlanning assumptions
  • Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
  • Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.

Methodology notes

  • Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.

Drawn to scale

Plans and dimensions

Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.

150′ length80′ width12,000 sq ft
Computed from stored dimensions
Footprint plan — 80′ × 150′, drawn to the stored dimensions.Platform calculation
Front third4,000 sq ftCenter third4,000 sq ftRear third4,000 sq ft80′ × 150′ floor plate
Computed from stored dimensions
Floor plate divided into equal thirds along the length; each area is computed from the stored footprint.Platform calculation

Continue your research

Related planning topics

Background reading on the questions this page raises. None of these pages sells anything.

Compare 80x150 steel office building configurations

Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.

Get a Quote