Skip to content
Find Steel Buildings

Building Types

80x120 Fire and EMS Station Building

Width
80 ft
Length
120 ft
Floor area
9,600 sq ft
Perimeter
400 ft
Concept visualization of a steel fire station at a representative 70 by 110 foot size; not a real project.
Example Configuration
steel fire station concept visualization at a representative 70x110 size.Example configuration — for planning purposes only
Last updated Aug 27, 2026Reviewed under the Find Steel Buildings editorial standards

Quick dimensions

At a Glance

  • Width

    80 ft across the gable end.

  • Length

    120 ft along the sidewall.

  • Floor area

    9,600 sq ft of clear floor.

  • Eave height

    22 ft at the sidewall on the stored profile.

Get Quotes for a 80×120 Fire and EMS Station Building

Fire and EMS Station Building ✓80′ × 120′ ✓
Continue

Configuration

How This Building Is Configured

120′ length80′ width9,600 sq ft
Footprint drawn to the stated dimensions.Platform calculation

Configuration summary

Building typeFire and EMS Station Building
Footprint80 ft × 120 ft
Floor area9,600 sq ft
Eave height22 ft

Planning

Footprint & Space Planning

  • Footprint

    Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.

  • Height

    Eave height affects door options, storage height and how open the interior feels.

  • Access

    Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.

  • Doors and openings

    Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.

  • Site

    Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.

  • Expansion

    Extending along the length is usually simpler than changing the width later, which is worth deciding up front.

Use

How a 80×120 Fire and EMS Station Building May Be Used

  • Assembly space

    Clear-span width determines how the main space can be arranged and seated.

  • Support rooms

    Ancillary rooms are commonly placed along one side or at one end.

  • Access and egress

    Entrance and exit placement follows the occupancy requirements for the use.

  • Acoustics and finish

    Interior treatment is specified with the intended activity in mind.

Example

Example Configuration

Example configuration of a 80 by 120 foot fire and ems station building
Fire and EMS Station Building shown as an example configuration — for planning purposes only. Doors, colors and openings are specified for the actual project.

Access

Doors & Access Considerations

  • Opening width

    Across a 80 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.

  • Opening height

    A 22 ft eave sets the ceiling on door height before any frame change.

  • Drive-through

    Matching openings at both ends avoid reversing, at the cost of usable wall.

Similar sizes

Other Sizes for a Fire and EMS Station Building

Related

Related Building Types

FAQ

Common Questions

80 ft × 120 ft is 9,600 square feet of floor area before any interior partitions.

Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.

Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.

Compare nearby sizes

Related footprints for this building type

Each page works through one footprint for one building type.

Overview

A 80x120 fire and ems station building planned as a continuously staffed station with living quarters separated from the apparatus floor

This page is ordered around arrival, because in a client-facing office the first thirty seconds after the door decide how the rest of the plan has to work.

The footprint holds 16 quarters modules — 4 across by 4 deep — and the remaining 8 feet is marginal: there is no buffer between quarters and the bay, so noise, exhaust and traffic from the apparatus floor reach the living space directly.

Efficiency is the useful number here: 600 square feet of enclosed floor per quarters module, against a 432-square-foot module. That leaves working slack around each position. An empty building looks generous and a working one rarely does; plan against the working state.

A 80 by 120 footprint is a clearly directional plan: 9,600 sq ft enclosed by 400 ft of wall, at a 1.5:1 length-to-width proportion. Along its 120 ft dimension it takes 5 runs of quarters modules at 24 ft, leaving 0 ft over — the 0 ft is where the argument about this size actually happens. Taken purely as arithmetic, 80 by 120 gives 3 quarters modules across the 80 ft dimension once 16 ft is reserved for movement, and 5 deep along the 120 ft dimension. Run as a a continuously staffed station with living quarters separated from the apparatus floor, 10 ft across is below the 14 ft this use needs to be worth planning, so there is no buffer between quarters and the bay, so noise, exhaust and traffic from the apparatus floor reach the living space directly Whether a station needs quarters, how many bays are required, and how coverage is distributed across substations are determined by the department and the authority having jurisdiction, not by the building program.

This footprint is planned as a continuously staffed station with living quarters separated from the apparatus floor. Spent as a square 98 by 98 instead, the same 9,600 sq ft would stand 4 quarters modules across rather than 3, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. Compared with a 80 by 90 of the same width, the extra depth here adds run rather than reach: it buys about 5 quarters modules in line, and every position past the second is retrieved by moving what stands in front of it. A building of this size behaves like a small yard under a roof: zones need to be defined, signed and left alone, or they migrate. The building runs on two schedules at once — daily living routines and an interruption sequence that has to work at any hour. Furniture, doors and floor finishes in the connecting zone are chosen for that interruption sequence rather than for the daily routine alone. Training or drill space works best kept physically separate from the apparatus floor, so a scheduled drill never has to be cleared before a response can proceed.

Planning assumptionPlatform calculation

Areas, perimeter, roof area, ridge height, slab volume and the quarters module counts on this page are computed from the stored 80x120 record and this platform's planning module for the fire and ems station building category.

Openings

Openings for 4 quarters modules across

One opening per position works on this gable: 4 across 80 feet, with 8 feet of wall to distribute as piers. Splitting that margin evenly is what keeps the elevation buildable. What the building holds in its busiest week is the honest brief; the rest of the year is slack.

The 80 ft ends and the 120 ft sides offer very different opening budgets: 80 ft of end wall has room for one wide opening or two modest ones, while 120 ft of side wall can carry several without the openings competing. On this plan the deciding factor is whether staffed fire station quarters or apparatus bay to quarters route should be the first thing reached from the door.

Planning assumptionEngineering-required

Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.

Allocation

Dividing the floor for a continuously staffed station with living quarters separated from the apparatus floor

The staffing and turnout pattern this station could equally be planned for is a volunteer station members drive to and park apparatus in, entering and exiting through the same bay front: there is no turnout area between the bays and the day room, so gear is staged wherever there is a wall left over and members cross the bay floor to reach it. Quarters, kitchen and common space form one zone; the apparatus floor and its support rooms form another; a defined buffer corridor connects them and carries the direct route without merging the two zones. Placing quarters directly against the bay wall trades comfort for a marginally shorter route that a well-planned buffer rarely costs.

There is no end zone at this footprint. 8 feet is circulation slack, not floor area with a purpose, and there is no buffer between quarters and the bay, so noise, exhaust and traffic from the apparatus floor reach the living space directly. Ground conditions and drainage decide the floor before the frame does.

Spare width is the more valuable of the two leftovers here: a continuous 8-foot strip beats the same area stranded at the end of the run, because it touches every position along the way. Neighbouring buildings, setbacks and the approach road often decide the orientation before the plan does.

Spent as a square 98 by 98 instead, the same 9,600 sq ft would stand 4 quarters modules across rather than 3, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. Compared with a 80 by 90 of the same width, the extra depth here adds run rather than reach: it buys about 5 quarters modules in line, and every position past the second is retrieved by moving what stands in front of it. A building of this size behaves like a small yard under a roof: zones need to be defined, signed and left alone, or they migrate. The building runs on two schedules at once — daily living routines and an interruption sequence that has to work at any hour. Furniture, doors and floor finishes in the connecting zone are chosen for that interruption sequence rather than for the daily routine alone. Training or drill space works best kept physically separate from the apparatus floor, so a scheduled drill never has to be cleared before a response can proceed. That movement pattern, not the 9,600-square-foot total, is what decides whether the leftover 8 feet is useful here.

Primary operating area72 × 80 ft · 5,760 sq ftCustomer or staff area26.4 × 80 ft · 2,112 sq ftBack of house and utility21.6 × 80 ft · 1,728 sq ft120 ft overall length
operating and support allocation allocation across the 120-foot length

Configurations

Configuring 16 quarters modules at 80x120

Nominal bay division computes to 5 bays at about 24 feet, wider than the 18-foot module — so a position can sit inside a bay without a frame line splitting it. The plan should survive the day the largest item the operation owns has to come inside.

With 4 rows deep, the rear row is behind the front one. Without a route past it, those quarters modules become storage positions rather than working ones — the real cost of depth at this width. A leftover strip earns its place only when something is deliberately put in it; otherwise it is circulation with a nicer name.

Quarters typically expand along their own wing rather than by extending toward the apparatus floor, keeping the buffer and the direct route intact as staffing needs grow.

Configured as a continuously staffed station with living quarters separated from the apparatus floor, 80x120 is judged on whether the 16 quarters modules it holds match the operation, and on whether the 8 feet of spare width leaves the route this mode depends on.

  • Does the work need racking or work zones on both sides with a full vehicle lane down the middle, or does it need a second lane that this 80-foot span cannot give?
  • Is the 120-foot length being bought for depth, or for the repeated bays — a long repeating bay sequence, so segment boundaries are set by bay lines rather than by walls?
  • Is the tallest apparatus dimension measured with everything mounted?
  • Drive-through or reverse-in, and what does the apron allow?
Planning assumptionTypical configuration

Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.

Usable area

How the 9,600 square feet divides at 80x120

Computed quarters module fit for a 80x120 fire and ems station building

MeasureComputed at this footprint
Quarters modules across the 80-foot width4 at a 18-foot module
Leftover width8 ft (960 sq ft as a full-length strip)
Rows along the 120-foot length4 at a 24-foot module after 16 ft of circulation
Leftover depth8 ft (640 sq ft across the width)
Total quarters modules16
Share of floor committed72%

Module footprint used here is 18 by 24 feet, this platform's planning module for a fire and ems station building. It is not a code minimum or an engineered clearance.

Example allocation of the 120-foot length — planning model, not survey data

ZoneLength along the buildingComputed area
Primary operating area72 ft5,760 sq ft
Customer or staff area26.4 ft2,112 sq ft
Back of house and utility21.6 ft1,728 sq ft

Shares applied to the stored 120-foot length; areas computed against the 80-foot width.

Planning assumptionPlanning guidance

Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.

Height

Interior height for a 80x120 fire and ems station building

Span drives headroom at 80x120: 80 feet of width on a 4:12 pitch puts 35.3 feet over the middle and 22 feet at the walls, so where a tall item stands matters as much as how tall it is. The corner nobody plans for is the one that fills first, which is an argument for planning it.

Quarters and administrative space can use residential or office-scale ceiling heights, while the apparatus bay needs its own clearance for the equipment housed there — treating the whole building as one uniform height wastes volume in the living areas or shortchanges the bay.

Ventilation across 9,600 square feet at this height: exhaust capture in the bays is planned as part of the building rather than added afterwards.

Planning assumptionPlanning guidance

Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.

Comparison

What changes at adjacent footprints

Computed comparison of nearby footprints for a fire and ems station building

FootprintFloor areaQuarters modules
50x804,000 sq ft3 (3 x 1)
40x1004,000 sq ft4 (2 x 2)
60x804,800 sq ft6 (3 x 2)
40x1204,800 sq ft6 (2 x 3)
50x1005,000 sq ft3 (3 x 1)

Areas computed from each stored size record; quarters module counts computed with the same 18 by 24 foot planning module.

  • 50x80 moves the count from 16 to 3 quarters modules (3 across by 1 deep), which is the reason to choose between them.
  • 40x100 moves the count from 16 to 4 quarters modules (2 across by 2 deep), which is the reason to choose between them.
  • 60x80 moves the count from 16 to 6 quarters modules (3 across by 2 deep), which is the reason to choose between them.

Nearby footprints read for a fire and ems station building: exact change in area and in planning quarters modules

FootprintArea Δ% ΔQuarters modules at that footprintWhat changes for this use
100x100+400 sq ft+4.2%10 (5 x 2)−6 quarters modules on the same planning module.
60x150−600 sq ft−6.2%12 (3 x 4)−4 quarters modules on the same planning module.
80x100−1,600 sq ft−16.7%12 (4 x 3)−4 quarters modules on the same planning module.
80x150+2,400 sq ft+25%16 (4 x 4)Same quarters module count on this planning module; the difference is circulation and stored depth, not capacity.

Areas are arithmetic on two stored size records; quarters module counts use this platform's 18 by 24 foot planning module and are not a capacity statement.

Because this footprint is planned as a continuously staffed station with living quarters separated from the apparatus floor, the useful next reads are different from the ones a differently shaped fire and ems station building suggests: staffed fire station quarters, apparatus bay to quarters route, 24-hour station layout.

Visualization

Reading the 80x120 footprint as a fire and ems station building

120′ length80′ width9,600 sq ft
80x120 footprint plan, drawn from the stored dimensional record
22′ eave35.3′ ridge4:12 pitch · 80′ clear span
Gable cross section at a 22-foot eave and 4:12 pitch, computing to a 35.3-foot ridge

FAQ

Questions about 80x120 fire and ems station building projects

It depends on the tallest apparatus with everything mounted on it, measured at the door. The stored configuration computes to 35.3 feet at the ridge, but the eave is the number that governs anything standing near a wall.

Reserving 16 ft across the 80 ft dimension for movement leaves 64 ft of working width, which takes 3 quarters modules at 18 ft. Along 120 ft it takes 5 runs at 24 ft. That is 15 positions out of 9,600 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on does the route from quarters to the apparatus stay short and direct, while the quarters themselves stay separated enough from the bay to function as a place to rest. These are planning figures computed from the footprint, not a quoted layout.

The footprint holds 16 quarters modules — 4 across by 4 deep — and the remaining 8 feet is marginal: there is no buffer between quarters and the bay, so noise, exhaust and traffic from the apparatus floor reach the living space directly. Those counts use a 18 by 24 foot planning module with 16 feet allowed for circulation, so a different module changes the answer.

Usually not directly on it — separating public-facing space from the crew's living areas keeps quarters functioning as a place to rest between calls.

A 6-inch slab across 9,600 square feet computes to 177.8 cubic yards before thickened edges, piers or waste. The final design comes from the foundation engineer.

Methodology

How this page was produced

Sources and methodology

Verified sourceExternal factual sources
  • Find Steel Buildings dimensional records

    Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.

  • International Building Code and International Residential Code

    International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.

Platform calculationComputed on this platform
  • Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
  • Quarters module fit: Counts, leftover strips and per-module areas are computed from the stored 80x120 record against this platform's 18 by 24 foot planning module for the fire and ems station building category, with 16 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
  • Allocation model: Zone shares come from this platform's use typology for commercial and customer-facing operations and are applied arithmetically to the stored 120-foot length.
Planning assumptionPlanning assumptions
  • Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
  • Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.

Methodology notes

  • Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.

Cost drivers

Quantities that move the estimate at 80x120

No price appears on this page. The quantities that scale an estimate at 80x120 are 9,600 square feet of slab, 177.8 cubic yards of nominal concrete, 8,800 square feet of wall cladding and 10,119 square feet of roof cladding. Plan the exit as carefully as the entrance; buildings are emptied under more time pressure than they are filled.

Proportion drives cost here as much as size does: 400 ft of wall around 9,600 sq ft is 0.042 ft of wall per enclosed square foot, and a squarer plan of the same area would carry less. What moves the figure further on a a continuously staffed station with living quarters separated from the apparatus floor is the fit-out staffed fire station quarters implies, along with framed openings and the height chosen for the 80 ft span.

  • apparatus door height and width
  • drive-through bays versus reverse-in bays
  • exhaust capture in the bays
  • crew quarters as a separate conditioned envelope
Why we don't quote thisWe do not state 80x120 fire and ems station building pricing here, because it varies too much to give an honest figure. Published only with a documented inclusion basis, a collection date and a named source.

Drawn to scale

Plans and dimensions

Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.

120′ length80′ width9,600 sq ft
Computed from stored dimensions
Footprint plan — 80′ × 120′, drawn to the stored dimensions.Platform calculation
Front third3,200 sq ftCenter third3,200 sq ftRear third3,200 sq ft80′ × 120′ floor plate
Computed from stored dimensions
Floor plate divided into equal thirds along the length; each area is computed from the stored footprint.Platform calculation

Compare 80x120 fire and ems station building configurations

Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.

Get a Quote