Building Types
80x100 Fire and EMS Station Building
- Width
- 80 ft
- Length
- 100 ft
- Floor area
- 8,000 sq ft
- Perimeter
- 360 ft

Quick dimensions
At a Glance
Width
80 ft across the gable end.
Length
100 ft along the sidewall.
Floor area
8,000 sq ft of clear floor.
Eave height
20 ft at the sidewall on the stored profile.
Get Quotes for a 80×100 Fire and EMS Station Building
Configuration
How This Building Is Configured
Configuration summary
| Building type | Fire and EMS Station Building |
|---|---|
| Footprint | 80 ft × 100 ft |
| Floor area | 8,000 sq ft |
| Eave height | 20 ft |
Planning
Footprint & Space Planning
Footprint
Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.
Height
Eave height affects door options, storage height and how open the interior feels.
Access
Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.
Doors and openings
Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.
Site
Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.
Expansion
Extending along the length is usually simpler than changing the width later, which is worth deciding up front.
Use
How a 80×100 Fire and EMS Station Building May Be Used
Assembly space
Clear-span width determines how the main space can be arranged and seated.
Support rooms
Ancillary rooms are commonly placed along one side or at one end.
Access and egress
Entrance and exit placement follows the occupancy requirements for the use.
Acoustics and finish
Interior treatment is specified with the intended activity in mind.
Example
Example Configuration

Access
Doors & Access Considerations
Opening width
Across a 80 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.
Opening height
A 20 ft eave sets the ceiling on door height before any frame change.
Drive-through
Matching openings at both ends avoid reversing, at the cost of usable wall.
Similar sizes
Other Sizes for a Fire and EMS Station Building
80′ × 80′
6,400 sq ft
80′ × 120′
9,600 sq ft
70′ × 100′
7,000 sq ft
Related
Related Building Types
Example configuration — for planning purposes only.
FAQ
Common Questions
80 ft × 100 ft is 8,000 square feet of floor area before any interior partitions.
Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.
Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.
Compare nearby sizes
Related footprints for this building type
Each page works through one footprint for one building type.
Cost drivers
Quantities that move the estimate at 80x100
No price appears on this page. The quantities that scale an estimate at 80x100 are 8,000 square feet of slab, 148.1 cubic yards of nominal concrete, 7,200 square feet of wall cladding and 8,433 square feet of roof cladding. Interior divisions are the last decision that should be fixed, because they are the first one that usually changes.
Proportion drives cost here as much as size does: 360 ft of wall around 8,000 sq ft is 0.045 ft of wall per enclosed square foot, and a squarer plan of the same area would carry less. What moves the figure further on a a continuously staffed station with living quarters separated from the apparatus floor is the fit-out staffed fire station quarters implies, along with framed openings and the height chosen for the 80 ft span.
- apparatus door height and width
- drive-through bays versus reverse-in bays
- exhaust capture in the bays
- crew quarters as a separate conditioned envelope
Overview
A 80x100 fire and ems station building planned as a continuously staffed station with living quarters separated from the apparatus floor
This page is ordered around arrival, because in a client-facing office the first thirty seconds after the door decide how the rest of the plan has to work.
The footprint holds 12 quarters modules — 4 across by 3 deep — and the remaining 12 feet is marginal: there is no buffer between quarters and the bay, so noise, exhaust and traffic from the apparatus floor reach the living space directly.
Read this footprint through its span. 80 feet across is the fixed constraint; 100 feet of length is the negotiable one, and at 1.25 to 1 the building is close to square, so movement runs in both directions. Ground conditions and drainage decide the floor before the frame does.
A 80 by 100 footprint is a mildly directional plan: 8,000 sq ft enclosed by 360 ft of wall, at a 1.3:1 length-to-width proportion. Along its 100 ft dimension it takes 4 runs of quarters modules at 24 ft, leaving 4 ft over — the 4 ft is where the argument about this size actually happens. A staffed station is occupied around the clock, so it has to work as living space and as a response building at the same time, and those two roles pull in opposite directions — quarters want quiet and separation, the apparatus floor wants a direct route to it. The plan's central decision is how much distance to put between them without lengthening the response path. A substation earns its size by doing deliberately less than a primary station, not by quietly duplicating the primary station's full program at a smaller footprint.
This footprint is planned as a continuously staffed station with living quarters separated from the apparatus floor. Spent as a square 89 by 89 instead, the same 8,000 sq ft would stand 4 quarters modules across rather than 3, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. Compared with a 80 by 80 of the same width, the extra depth here adds run rather than reach: it buys about 4 quarters modules in line, and every position past the second is retrieved by moving what stands in front of it. A building of this size behaves like a small yard under a roof: zones need to be defined, signed and left alone, or they migrate. The building runs on two schedules at once — daily living routines and an interruption sequence that has to work at any hour. Furniture, doors and floor finishes in the connecting zone are chosen for that interruption sequence rather than for the daily routine alone. Clearance in the apparatus bay follows the tallest apparatus expected to be housed there, not the ceiling height anywhere else in the building.
Areas, perimeter, roof area, ridge height, slab volume and the quarters module counts on this page are computed from the stored 80x100 record and this platform's planning module for the fire and ems station building category.
Openings
Openings for 4 quarters modules across
The 80-foot gable can carry 4 openings, one per quarters module, with 8 feet of wall left for piers between and beside them — the arrangement that keeps each position independently reachable. Plan the exit as carefully as the entrance; buildings are emptied under more time pressure than they are filled.
Beyond the apparatus doors, the door and route from quarters to the bay matter more than any other opening in the building; a direct, unobstructed path is the priority, and it should not pass through public or administrative space.
Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.
Allocation
Dividing the floor for a continuously staffed station with living quarters separated from the apparatus floor
The staffing and turnout pattern this station could equally be planned for is a volunteer station members drive to and park apparatus in, entering and exiting through the same bay front: there is no turnout area between the bays and the day room, so gear is staged wherever there is a wall left over and members cross the bay floor to reach it. Dividing the 8,000 sq ft by the 18 by 24 ft quarters module gives roughly 12 positions before circulation is deducted a second time for cross movement. Whether the plan keeps 12 or drops to 8 comes back to the question this footprint is really answering: does the route from quarters to the apparatus stay short and direct, while the quarters themselves stay separated enough from the bay to function as a place to rest?
The 12-foot leftover depth falls under the 14 feet this platform treats as usable for a fire and ems station building, so there is no buffer between quarters and the bay, so noise, exhaust and traffic from the apparatus floor reach the living space directly. Neighbouring buildings, setbacks and the approach road often decide the orientation before the plan does.
Spare width is the more valuable of the two leftovers here: a continuous 8-foot strip beats the same area stranded at the end of the run, because it touches every position along the way. The plan should survive the day the largest item the operation owns has to come inside.
Spent as a square 89 by 89 instead, the same 8,000 sq ft would stand 4 quarters modules across rather than 3, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. Compared with a 80 by 80 of the same width, the extra depth here adds run rather than reach: it buys about 4 quarters modules in line, and every position past the second is retrieved by moving what stands in front of it. A building of this size behaves like a small yard under a roof: zones need to be defined, signed and left alone, or they migrate. The building runs on two schedules at once — daily living routines and an interruption sequence that has to work at any hour. Furniture, doors and floor finishes in the connecting zone are chosen for that interruption sequence rather than for the daily routine alone. Clearance in the apparatus bay follows the tallest apparatus expected to be housed there, not the ceiling height anywhere else in the building. That movement pattern, not the 8,000-square-foot total, is what decides whether the leftover 12 feet is useful here.
Configurations
Configuring 12 quarters modules at 80x100
Nominal bay division computes to 4 bays at about 25 feet, wider than the 18-foot module — so a position can sit inside a bay without a frame line splitting it. A leftover strip earns its place only when something is deliberately put in it; otherwise it is circulation with a nicer name.
Depth here creates a hierarchy: 3 rows means front positions get used and rear positions get filled. Deciding which is which up front is what keeps 80x100 workable. The corner nobody plans for is the one that fills first, which is an argument for planning it.
Quarters typically expand along their own wing rather than by extending toward the apparatus floor, keeping the buffer and the direct route intact as staffing needs grow.
Configured as a continuously staffed station with living quarters separated from the apparatus floor, 80x100 is judged on whether the 12 quarters modules it holds match the operation, and on whether the 8 feet of spare width leaves the route this mode depends on.
- Does the work need racking or work zones on both sides with a full vehicle lane down the middle, or does it need a second lane that this 80-foot span cannot give?
- Is the 100-foot length being bought for depth, or for the repeated bays — eight to ten repeated bays, which makes the layout a scheduling problem as much as a spatial one?
- Is the tallest apparatus dimension measured with everything mounted?
- Drive-through or reverse-in, and what does the apron allow?
Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.
Usable area
How the 8,000 square feet divides at 80x100
Computed quarters module fit for a 80x100 fire and ems station building
| Measure | Computed at this footprint |
|---|---|
| Quarters modules across the 80-foot width | 4 at a 18-foot module |
| Leftover width | 8 ft (800 sq ft as a full-length strip) |
| Rows along the 100-foot length | 3 at a 24-foot module after 16 ft of circulation |
| Leftover depth | 12 ft (960 sq ft across the width) |
| Total quarters modules | 12 |
| Share of floor committed | 65% |
Module footprint used here is 18 by 24 feet, this platform's planning module for a fire and ems station building. It is not a code minimum or an engineered clearance.
Example allocation of the 100-foot length — planning model, not survey data
| Zone | Length along the building | Computed area |
|---|---|---|
| Primary operating area | 60 ft | 4,800 sq ft |
| Customer or staff area | 22 ft | 1,760 sq ft |
| Back of house and utility | 18 ft | 1,440 sq ft |
Shares applied to the stored 100-foot length; areas computed against the 80-foot width.
Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.
Height
Interior height for a 80x100 fire and ems station building
The stored configuration carries a 20-foot eave and computes to 33.3 feet at the ridge on a 4:12 pitch — a 13.3-foot rise across 80 feet. Height is therefore not uniform, and the sidewall is the constraint. What the building holds in its busiest week is the honest brief; the rest of the year is slack.
Height on a 80 ft span is a separate decision from the 100 ft length, and it is the span that sets the frame's behavior. Raising the eave over 8,000 sq ft affects every bay along the 100 ft dimension, so the test is whether staffed fire station quarters genuinely needs the extra clear height or only the floor area.
Ventilation across 8,000 square feet at this height: exhaust capture in the bays is planned as part of the building rather than added afterwards.
Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.
Comparison
What changes at adjacent footprints
Computed comparison of nearby footprints for a fire and ems station building
| Footprint | Floor area | Quarters modules |
|---|---|---|
| 40x80 | 3,200 sq ft | 2 (2 x 1) |
| 60x60 | 3,600 sq ft | 4 (4 x 1) |
| 50x80 | 4,000 sq ft | 3 (3 x 1) |
| 40x100 | 4,000 sq ft | 4 (2 x 2) |
| 60x80 | 4,800 sq ft | 6 (3 x 2) |
Areas computed from each stored size record; quarters module counts computed with the same 18 by 24 foot planning module.
- 40x80 moves the count from 12 to 2 quarters modules (2 across by 1 deep), which is the reason to choose between them.
- 60x60 moves the count from 12 to 4 quarters modules (4 across by 1 deep), which is the reason to choose between them.
- 50x80 moves the count from 12 to 3 quarters modules (3 across by 1 deep), which is the reason to choose between them.
Nearby footprints read for a fire and ems station building: exact change in area and in planning quarters modules
| Footprint | Area Δ | % Δ | Quarters modules at that footprint | What changes for this use |
|---|---|---|---|---|
| 50x150 | −500 sq ft | −6.2% | 8 (2 x 4) | −4 quarters modules on the same planning module. |
| 60x150 | +1,000 sq ft | +12.5% | 12 (3 x 4) | Same quarters module count on this planning module; the difference is circulation and stored depth, not capacity. |
| 80x120 | +1,600 sq ft | +20% | 16 (4 x 4) | +4 quarters modules on the same planning module. |
| 80x80 | −1,600 sq ft | −20% | 4 (4 x 1) | −8 quarters modules on the same planning module. |
Areas are arithmetic on two stored size records; quarters module counts use this platform's 18 by 24 foot planning module and are not a capacity statement.
Because this footprint is planned as a continuously staffed station with living quarters separated from the apparatus floor, the useful next reads are different from the ones a differently shaped fire and ems station building suggests: staffed fire station quarters, apparatus bay to quarters route, 24-hour station layout.
Visualization
Reading the 80x100 footprint as a fire and ems station building
FAQ
Questions about 80x100 fire and ems station building projects
The footprint holds 12 quarters modules — 4 across by 3 deep — and the remaining 12 feet is marginal: there is no buffer between quarters and the bay, so noise, exhaust and traffic from the apparatus floor reach the living space directly. Those counts use a 18 by 24 foot planning module with 16 feet allowed for circulation, so a different module changes the answer.
Reserving 16 ft across the 80 ft dimension for movement leaves 64 ft of working width, which takes 3 quarters modules at 18 ft. Along 100 ft it takes 4 runs at 24 ft. That is 12 positions out of 8,000 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on does the route from quarters to the apparatus stay short and direct, while the quarters themselves stay separated enough from the bay to function as a place to rest. These are planning figures computed from the footprint, not a quoted layout.
A 6-inch slab across 8,000 square feet computes to 148.1 cubic yards before thickened edges, piers or waste. The final design comes from the foundation engineer.
Usually not directly on it — separating public-facing space from the crew's living areas keeps quarters functioning as a place to rest between calls.
7,200 square feet of wall and 8,433 square feet of roof at a 4:12 pitch — the roof exceeding the floor by 5%.
Methodology
How this page was produced
Sources and methodology
Find Steel Buildings dimensional records
Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering
Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.
International Building Code and International Residential Code
International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering
Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.
- Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
- Quarters module fit: Counts, leftover strips and per-module areas are computed from the stored 80x100 record against this platform's 18 by 24 foot planning module for the fire and ems station building category, with 16 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
- Allocation model: Zone shares come from this platform's use typology for commercial and customer-facing operations and are applied arithmetically to the stored 100-foot length.
- Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
- Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.
Methodology notes
- Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.
Drawn to scale
Plans and dimensions
Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.
Compare 80x100 fire and ems station building configurations
Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.