100x100 Fire and EMS Station Building

Width
100 ft
Length
100 ft
Floor area
10,000 sq ft
Perimeter
400 ft
Concept visualization of a steel fire station at a representative 70 by 110 foot size; not a real project.
Example Configuration
steel fire station concept visualization at a representative 70x110 size.Example configuration — for planning purposes only
Last updated Aug 27, 2026Reviewed under the Find Steel Buildings editorial standards

Quick dimensions

At a Glance

  • Width

    100 ft across the gable end.

  • Length

    100 ft along the sidewall.

  • Floor area

    10,000 sq ft of clear floor.

  • Eave height

    22 ft at the sidewall on the stored profile.

Get Quotes for a 100×100 Fire and EMS Station Building

Fire and EMS Station Building ✓100′ × 100′ ✓
Continue

Configuration

How This Building Is Configured

100′ length100′ width10,000 sq ft
Footprint drawn to the stated dimensions.Platform calculation

Configuration summary

Building typeFire and EMS Station Building
Footprint100 ft × 100 ft
Floor area10,000 sq ft
Eave height22 ft

Planning

Footprint & Space Planning

  • Footprint

    Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.

  • Height

    Eave height affects door options, storage height and how open the interior feels.

  • Access

    Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.

  • Doors and openings

    Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.

  • Site

    Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.

  • Expansion

    Extending along the length is usually simpler than changing the width later, which is worth deciding up front.

Use

How a 100×100 Fire and EMS Station Building May Be Used

  • Assembly space

    Clear-span width determines how the main space can be arranged and seated.

  • Support rooms

    Ancillary rooms are commonly placed along one side or at one end.

  • Access and egress

    Entrance and exit placement follows the occupancy requirements for the use.

  • Acoustics and finish

    Interior treatment is specified with the intended activity in mind.

Example

Example Configuration

Example configuration of a 100 by 100 foot fire and ems station building
Fire and EMS Station Building shown as an example configuration — for planning purposes only. Doors, colors and openings are specified for the actual project.

Access

Doors & Access Considerations

  • Opening width

    Across a 100 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.

  • Opening height

    A 22 ft eave sets the ceiling on door height before any frame change.

  • Drive-through

    Matching openings at both ends avoid reversing, at the cost of usable wall.

Similar sizes

Other Sizes for a Fire and EMS Station Building

Related

Related Building Types

FAQ

Common Questions

100 ft × 100 ft is 10,000 square feet of floor area before any interior partitions.

Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.

Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.

Compare nearby sizes

Related footprints for this building type

Each page works through one footprint for one building type.

Overview

A 100x100 fire and ems station building planned as a station combining an apparatus floor with dedicated training or drill space under one roof

This page is ordered around quarters buffer, because that is the decision this footprint settles first and every later choice follows from it.

5 training bays fit across the 100-foot width with only 0 feet left over, which is a tight fit: the width is fully committed and nothing can be widened later without moving a wall.

Commitment first: 64% of the 10,000 square feet goes to training bays at 640 square feet each, and 1,800 square feet survives as edge strip. A footprint is worth its own decision when that split lands where the work does. Plan the exit as carefully as the entrance; buildings are emptied under more time pressure than they are filled.

A 100 by 100 footprint is a near-square plan: 10,000 sq ft enclosed by 400 ft of wall, at a 1:1 length-to-width proportion. Along its 100 ft dimension it takes 3 runs of training bays at 32 ft, leaving 4 ft over — the 4 ft is where the argument about this size actually happens. Combining an apparatus floor with training or drill space multiplies the building's use but also multiplies the ways one activity can interfere with the other, so the central planning task is drawing a boundary — physical or procedural — that keeps a drill from ever standing between apparatus and its door. How apparatus enters and exits governs the plan more than the number of bays does — a drive-through approach and a single-entry approach solve different problems.

This footprint is planned as a station combining an apparatus floor with dedicated training or drill space under one roof. At 1:1 the plan is close enough to square that neither width nor depth is doing the arguing; what decides the layout here is where the openings go, because no proportion is forcing a direction on the floor. Spent as a square 100 by 100 instead, the same 10,000 sq ft would stand 4 training bays across rather than 4, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. A building of this size behaves like a small yard under a roof: zones need to be defined, signed and left alone, or they migrate. The longest internal travel on a 100 by 100 plan is about 141 ft corner to corner, and the shortest useful one is the 100 ft cross-run. For a a station combining an apparatus floor with dedicated training or drill space under one roof that matters where apparatus and training station sits, because shortening the 100 ft run to serve it lengthens every trip along the 100 ft dimension. Clearance in the apparatus bay follows the tallest apparatus expected to be housed there, not the ceiling height anywhere else in the building.

Planning assumptionPlatform calculation

Areas, perimeter, roof area, ridge height, slab volume and the training bay counts on this page are computed from the stored 100x100 record and this platform's planning module for the fire and ems station building category.

Allocation

Dividing the floor for a station combining an apparatus floor with dedicated training or drill space under one roof

The staffing and turnout pattern this station could equally be planned for is a station where apparatus enters at one end of the bay and exits the other, never reversing on site: there is no clear apron at both ends, so an apparatus returning while another is staged blocks the through route entirely. The apparatus floor keeps a dedicated, unobstructed zone including its own approach and door; training space, whether a drill tower footprint, a classroom, or an open floor for equipment drills, occupies a separate zone connected by circulation rather than by shared floor.

The 18-foot leftover depth is 1,800 square feet across the full width — deep enough to plan deliberately, and at this footprint it goes to a separation zone between the apparatus floor and the training area so drills do not compete with a live response for the same door or floor space. Interior divisions are the last decision that should be fixed, because they are the first one that usually changes.

Width is fully committed at 100x100. With 0 feet spare, wall storage and passing room compete with the training bays directly. Utilities entering on the wrong elevation quietly rewrite the interior layout.

At 1:1 the plan is close enough to square that neither width nor depth is doing the arguing; what decides the layout here is where the openings go, because no proportion is forcing a direction on the floor. Spent as a square 100 by 100 instead, the same 10,000 sq ft would stand 4 training bays across rather than 4, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. A building of this size behaves like a small yard under a roof: zones need to be defined, signed and left alone, or they migrate. The longest internal travel on a 100 by 100 plan is about 141 ft corner to corner, and the shortest useful one is the 100 ft cross-run. For a a station combining an apparatus floor with dedicated training or drill space under one roof that matters where apparatus and training station sits, because shortening the 100 ft run to serve it lengthens every trip along the 100 ft dimension. Clearance in the apparatus bay follows the tallest apparatus expected to be housed there, not the ceiling height anywhere else in the building. That movement pattern, not the 10,000-square-foot total, is what decides whether the leftover 18 feet is useful here.

Primary operating area60 × 100 ft · 6,000 sq ftCustomer or staff area22 × 100 ft · 2,200 sq ftBack of house and utility18 × 100 ft · 1,800 sq ft100 ft overall length
operating and support allocation allocation across the 100-foot length

Height

Interior height for a 100x100 fire and ems station building

The stored configuration carries a 22-foot eave and computes to 38.7 feet at the ridge on a 4:12 pitch — a 16.7-foot rise across 100 feet. Height is therefore not uniform, and the sidewall is the constraint. Depth is bought cheaply and width expensively, which is why this proportion tends to be argued about before anything else.

Training space often needs different clearance than the apparatus bay — a drill tower or hose-drying area may want more height than the bay itself — so each zone's height should be set by its own use rather than by matching the bay uniformly.

Ventilation across 10,000 square feet at this height: exhaust capture in the bays is planned as part of the building rather than added afterwards.

Planning assumptionPlanning guidance

Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.

Configurations

Configuring 10 training bays at 100x100

Nominal bay division computes to 4 bays at about 25 feet, wider than the 20-foot module — so a position can sit inside a bay without a frame line splitting it. Insulating later is possible; framing for insulation later is much harder.

Depth here creates a hierarchy: 2 rows means front positions get used and rear positions get filled. Deciding which is which up front is what keeps 100x100 workable. Long spans buy flexibility that is only worth paying for if the operation actually changes shape.

Extension is cheapest along the 100 ft dimension, where each added bay repeats work already framed; widening past 100 ft is a different frame rather than a longer one. Growing to 100 by 132 adds a 4th run of training bays — useful if the constraint is training bays rather than the 4 ft already spare at the far end.

Configured as a station combining an apparatus floor with dedicated training or drill space under one roof, 100x100 is judged on whether the 10 training bays it holds match the operation, and on whether the 0 feet of spare width leaves the route this mode depends on.

  • Does the work need an interior street with independent zones on both sides and turning room at each end, or does it need a second lane that this 100-foot span cannot give?
  • Is the 100-foot length being bought for depth, or for the repeated bays — eight to ten repeated bays, which makes the layout a scheduling problem as much as a spatial one?
  • Is the tallest apparatus dimension measured with everything mounted?
  • Drive-through or reverse-in, and what does the apron allow?
Planning assumptionTypical configuration

Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.

Openings

Openings for 5 training bays across

At 100 feet the gable will not comfortably take one opening per training bay: 5 positions with 0 feet spare leaves too little wall for piers. A single wider opening, or a sidewall opening, is the workable route. Height is the dimension people regret; it cannot be added later without rebuilding the frame line.

The apparatus door remains the priority opening and should never open into or across the training area; a separate entrance and, where a drill tower or yard is included, its own access route, keep the two functions from sharing a threshold.

Planning assumptionEngineering-required

Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.

Usable area

How the 10,000 square feet divides at 100x100

Computed training bay fit for a 100x100 fire and ems station building

MeasureComputed at this footprint
Training bays across the 100-foot width5 at a 20-foot module
Leftover width0 ft (0 sq ft as a full-length strip)
Rows along the 100-foot length2 at a 32-foot module after 18 ft of circulation
Leftover depth18 ft (1,800 sq ft across the width)
Total training bays10
Share of floor committed64%

Module footprint used here is 20 by 32 feet, this platform's planning module for a fire and ems station building. It is not a code minimum or an engineered clearance.

Example allocation of the 100-foot length — planning model, not survey data

ZoneLength along the buildingComputed area
Primary operating area60 ft6,000 sq ft
Customer or staff area22 ft2,200 sq ft
Back of house and utility18 ft1,800 sq ft

Shares applied to the stored 100-foot length; areas computed against the 100-foot width.

Planning assumptionPlanning guidance

Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.

Comparison

What changes at adjacent footprints

Computed comparison of nearby footprints for a fire and ems station building

FootprintFloor areaTraining bays
50x804,000 sq ft3 (3 x 1)
40x1004,000 sq ft4 (2 x 2)
60x804,800 sq ft6 (3 x 2)
40x1204,800 sq ft6 (2 x 3)
50x1005,000 sq ft3 (3 x 1)

Areas computed from each stored size record; training bay counts computed with the same 20 by 32 foot planning module.

  • 50x80 moves the count from 10 to 3 training bays (3 across by 1 deep), which is the reason to choose between them.
  • 40x100 moves the count from 10 to 4 training bays (2 across by 2 deep), which is the reason to choose between them.
  • 60x80 moves the count from 10 to 6 training bays (3 across by 2 deep), which is the reason to choose between them.

Nearby footprints read for a fire and ems station building: exact change in area and in planning training bays

FootprintArea Δ% ΔTraining bays at that footprintWhat changes for this use
80x120−400 sq ft−4%16 (4 x 4)+6 training bays on the same planning module.
100x120+2,000 sq ft+20%15 (5 x 3)+5 training bays on the same planning module.
80x100−2,000 sq ft−20%12 (4 x 3)+2 training bays on the same planning module.

Areas are arithmetic on two stored size records; training bay counts use this platform's 20 by 32 foot planning module and are not a capacity statement.

Because this footprint is planned as a station combining an apparatus floor with dedicated training or drill space under one roof, the useful next reads are different from the ones a differently shaped fire and ems station building suggests: apparatus and training station, drill space planning, combined training fire station.

Visualization

Reading the 100x100 footprint as a fire and ems station building

100′ length100′ width10,000 sq ft
100x100 footprint plan, drawn from the stored dimensional record
22′ eave38.7′ ridge4:12 pitch · 100′ clear span
Gable cross section at a 22-foot eave and 4:12 pitch, computing to a 38.7-foot ridge

FAQ

Questions about 100x100 fire and ems station building projects

8,800 square feet of wall and 10,541 square feet of roof at a 4:12 pitch — the roof exceeding the floor by 5%.

Reserving 18 ft across the 100 ft dimension for movement leaves 82 ft of working width, which takes 4 training bays at 20 ft. Along 100 ft it takes 3 runs at 32 ft. That is 12 positions out of 10,000 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on can the training area be used at full activity while the apparatus bay stays clear and ready, or does one always have to stand down for the other. These are planning figures computed from the footprint, not a quoted layout.

The width leaves 0 feet spare after 5 training bays. There is no margin, so added equipment or wall storage comes out of a position. Width is the dimension that cannot be extended later.

It can be planned that way, but doing so routinely blurs the separation this mode depends on. If overflow storage is a real need, it is better planned as its own zone than absorbed into training space.

Length here buys 2 rows and 4 nominal bays; width buys 5 positions side by side. At this aspect ratio both dimensions are still adding usable positions.

Methodology

How this page was produced

Sources and methodology

Verified sourceExternal factual sources
  • Find Steel Buildings dimensional records

    Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.

  • International Building Code and International Residential Code

    International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.

Platform calculationComputed on this platform
  • Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
  • Training bay fit: Counts, leftover strips and per-module areas are computed from the stored 100x100 record against this platform's 20 by 32 foot planning module for the fire and ems station building category, with 18 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
  • Allocation model: Zone shares come from this platform's use typology for commercial and customer-facing operations and are applied arithmetically to the stored 100-foot length.
Planning assumptionPlanning assumptions
  • Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
  • Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.

Methodology notes

  • Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.

Cost drivers

Quantities that move the estimate at 100x100

The estimate at 100x100 moves with four computed quantities: 10,000 square feet of floor, 400 feet of perimeter, 8,800 square feet of wall and 10,541 square feet of roof. Everything else is site and specification. A wider bay is a structural decision and a longer bay is a layout decision; the two are often confused.

Proportion drives cost here as much as size does: 400 ft of wall around 10,000 sq ft is 0.04 ft of wall per enclosed square foot, and a squarer plan of the same area would carry less. What moves the figure further on a a station combining an apparatus floor with dedicated training or drill space under one roof is the fit-out apparatus and training station implies, along with framed openings and the height chosen for the 100 ft span.

  • apparatus door height and width
  • drive-through bays versus reverse-in bays
  • exhaust capture in the bays
  • crew quarters as a separate conditioned envelope
Why we don't quote thisWe do not state 100x100 fire and ems station building pricing here, because it varies too much to give an honest figure. Published only with a documented inclusion basis, a collection date and a named source.

Drawn to scale

Plans and dimensions

Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.

100′ length100′ width10,000 sq ft
Computed from stored dimensions
Footprint plan — 100′ × 100′, drawn to the stored dimensions.Platform calculation
Front third3,333 sq ftCenter third3,333 sq ftRear third3,333 sq ft100′ × 100′ floor plate
Computed from stored dimensions
Floor plate divided into equal thirds along the length; each area is computed from the stored footprint.Platform calculation

Compare 100x100 fire and ems station building configurations

Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.

Get a Quote