Skip to content
Find Steel Buildings

Building Types

60x150 Fire and EMS Station Building

Width
60 ft
Length
150 ft
Floor area
9,000 sq ft
Perimeter
420 ft
Concept visualization of a steel fire station at a representative 70 by 110 foot size; not a real project.
Example Configuration
steel fire station concept visualization at a representative 70x110 size.Example configuration — for planning purposes only
Last updated Aug 27, 2026Reviewed under the Find Steel Buildings editorial standards

Quick dimensions

At a Glance

  • Width

    60 ft across the gable end.

  • Length

    150 ft along the sidewall.

  • Floor area

    9,000 sq ft of clear floor.

  • Eave height

    14 ft at the sidewall on the stored profile.

Get Quotes for a 60×150 Fire and EMS Station Building

Fire and EMS Station Building ✓60′ × 150′ ✓
Continue

Configuration

How This Building Is Configured

150′ length60′ width9,000 sq ft
Footprint drawn to the stated dimensions.Platform calculation

Configuration summary

Building typeFire and EMS Station Building
Footprint60 ft × 150 ft
Floor area9,000 sq ft
Eave height14 ft

Planning

Footprint & Space Planning

  • Footprint

    Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.

  • Height

    Eave height affects door options, storage height and how open the interior feels.

  • Access

    Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.

  • Doors and openings

    Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.

  • Site

    Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.

  • Expansion

    Extending along the length is usually simpler than changing the width later, which is worth deciding up front.

Use

How a 60×150 Fire and EMS Station Building May Be Used

  • Assembly space

    Clear-span width determines how the main space can be arranged and seated.

  • Support rooms

    Ancillary rooms are commonly placed along one side or at one end.

  • Access and egress

    Entrance and exit placement follows the occupancy requirements for the use.

  • Acoustics and finish

    Interior treatment is specified with the intended activity in mind.

Example

Example Configuration

Example configuration of a 60 by 150 foot fire and ems station building
Fire and EMS Station Building shown as an example configuration — for planning purposes only. Doors, colors and openings are specified for the actual project.

Access

Doors & Access Considerations

  • Opening width

    Across a 60 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.

  • Opening height

    A 14 ft eave sets the ceiling on door height before any frame change.

  • Drive-through

    Matching openings at both ends avoid reversing, at the cost of usable wall.

Similar sizes

Other Sizes for a Fire and EMS Station Building

Related

Related Building Types

FAQ

Common Questions

60 ft × 150 ft is 9,000 square feet of floor area before any interior partitions.

Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.

Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.

Compare nearby sizes

Related footprints for this building type

Each page works through one footprint for one building type.

Overview

A 60x150 fire and ems station building planned as a station combining an apparatus floor with dedicated training or drill space under one roof

This page is ordered around through route, because that is the decision this footprint settles first and every later choice follows from it.

3 training bays fit across the 60-foot width with only 0 feet left over, which is a tight fit: the width is fully committed and nothing can be widened later without moving a wall.

Efficiency is the useful number here: 750 square feet of enclosed floor per training bay, against a 640-square-foot module. That is a tight, efficient allocation with little slack. Whoever operates the building daily should read the plan before it is frozen, because they know where the pinch points are.

A 60 by 150 footprint is a long corridor of a plan: 9,000 sq ft enclosed by 420 ft of wall, at a 2.5:1 length-to-width proportion. Along its 150 ft dimension it takes 4 runs of training bays at 32 ft, leaving 22 ft over — the 22 ft is where the argument about this size actually happens. Taken purely as arithmetic, 60 by 150 gives 2 training bays across the 60 ft dimension once 18 ft is reserved for movement, and 4 deep along the 150 ft dimension. Run as a a station combining an apparatus floor with dedicated training or drill space under one roof, 2 ft across is below the 16 ft this use needs to be worth planning, so there is no separation zone, so a drill in progress has to be cleared entirely before the apparatus floor can be used for an actual response Clearance in the apparatus bay follows the tallest apparatus expected to be housed there, not the ceiling height anywhere else in the building.

At 60x150 the operating question is a specific one: can the training area be used at full activity while the apparatus bay stays clear and ready, or does one always have to stand down for the other? That is a different question from the one a fire and ems station building of another shape has to answer, and it is why this footprint is planned as a station combining an apparatus floor with dedicated training or drill space under one roof rather than as generic covered area.

Planning assumptionPlatform calculation

Areas, perimeter, roof area, ridge height, slab volume and the training bay counts on this page are computed from the stored 60x150 record and this platform's planning module for the fire and ems station building category.

Height

Interior height for a 60x150 fire and ems station building

Span drives headroom at 60x150: 60 feet of width on a 3:12 pitch puts 21.5 feet over the middle and 14 feet at the walls, so where a tall item stands matters as much as how tall it is. The building is fixed for decades while the operation inside it changes every few years, and the plan has to survive that.

Training space often needs different clearance than the apparatus bay — a drill tower or hose-drying area may want more height than the bay itself — so each zone's height should be set by its own use rather than by matching the bay uniformly.

Ventilation across 9,000 square feet at this height: exhaust capture in the bays is planned as part of the building rather than added afterwards.

Planning assumptionPlanning guidance

Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.

Usable area

How the 9,000 square feet divides at 60x150

Computed training bay fit for a 60x150 fire and ems station building

MeasureComputed at this footprint
Training bays across the 60-foot width3 at a 20-foot module
Leftover width0 ft (0 sq ft as a full-length strip)
Rows along the 150-foot length4 at a 32-foot module after 18 ft of circulation
Leftover depth4 ft (240 sq ft across the width)
Total training bays12
Share of floor committed85%

Module footprint used here is 20 by 32 feet, this platform's planning module for a fire and ems station building. It is not a code minimum or an engineered clearance.

Example allocation of the 150-foot length — planning model, not survey data

ZoneLength along the buildingComputed area
Primary operating area90 ft5,400 sq ft
Customer or staff area33 ft1,980 sq ft
Back of house and utility27 ft1,620 sq ft

Shares applied to the stored 150-foot length; areas computed against the 60-foot width.

Planning assumptionPlanning guidance

Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.

Openings

Openings for 3 training bays across

Openings are the pinch point here. With 0 feet of spare width the gable cannot host 3 separate doors, so access is either shared or moved to the 150-foot sidewall. The floor treatment is a use decision that outlasts most of the equipment standing on it.

The 60 ft ends and the 150 ft sides offer very different opening budgets: 60 ft of end wall has room for one wide opening or two modest ones, while 150 ft of side wall can carry several without the openings competing. On this plan the deciding factor is whether apparatus and training station or drill space planning should be the first thing reached from the door.

Planning assumptionEngineering-required

Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.

Allocation

Dividing the floor for a station combining an apparatus floor with dedicated training or drill space under one roof

The staffing and turnout pattern this station could equally be planned for is a volunteer station members drive to and park apparatus in, entering and exiting through the same bay front: there is no turnout area between the bays and the day room, so gear is staged wherever there is a wall left over and members cross the bay floor to reach it. The apparatus floor keeps a dedicated, unobstructed zone including its own approach and door; training space, whether a drill tower footprint, a classroom, or an open floor for equipment drills, occupies a separate zone connected by circulation rather than by shared floor.

There is no end zone at this footprint. 4 feet is circulation slack, not floor area with a purpose, and there is no separation zone, so a drill in progress has to be cleared entirely before the apparatus floor can be used for an actual response. Daylight placement changes how a floor is used far more than its cost suggests.

Width is fully committed at 60x150. With 0 feet spare, wall storage and passing room compete with the training bays directly. Security and after-hours access are easier to design in the door layout than to bolt on later.

Compared with a 60 by 110 of the same width, the extra depth here adds run rather than reach: it buys about 4 training bays in line, and every position past the second is retrieved by moving what stands in front of it. Spent as a square 95 by 95 instead, the same 9,000 sq ft would stand 3 training bays across rather than 2, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. A building of this size behaves like a small yard under a roof: zones need to be defined, signed and left alone, or they migrate. Two independent activities need to run without either one waiting on the other, so scheduling and layout both matter: the apparatus response sequence has to be assumed possible at any time, including during a scheduled drill. Whether a station needs quarters, how many bays are required, and how coverage is distributed across substations are determined by the department and the authority having jurisdiction, not by the building program. That movement pattern, not the 9,000-square-foot total, is what decides whether the leftover 4 feet is useful here.

Primary operating area90 × 60 ft · 5,400 sq ftCustomer or staff area33 × 60 ft · 1,980 sq ftBack of house and utility27 × 60 ft · 1,620 sq ft150 ft overall length
operating and support allocation allocation across the 150-foot length

Configurations

Configuring 12 training bays at 60x150

At 25-foot nominal bays the structure works with the layout instead of against it: one training bay per bay line, walls free of awkward half-positions. The span is the commitment; everything inside it is rearrangeable later, and the 60-foot dimension is not.

Depth here creates a hierarchy: 4 rows means front positions get used and rear positions get filled. Deciding which is which up front is what keeps 60x150 workable. Doors and their approaches decide more about daily use here than the enclosed area does.

Extension is cheapest along the 150 ft dimension, where each added bay repeats work already framed; widening past 60 ft is a different frame rather than a longer one. Growing to 60 by 182 adds a 5th run of training bays — useful if the constraint is training bays rather than the 22 ft already spare at the far end.

Configured as a station combining an apparatus floor with dedicated training or drill space under one roof, 60x150 is judged on whether the 12 training bays it holds match the operation, and on whether the 0 feet of spare width leaves the route this mode depends on.

  • Does the work need four lanes across, or two lanes flanking an interior work hall, or does it need a second lane that this 60-foot span cannot give?
  • Is the 150-foot length being bought for depth, or for the repeated bays — a long repeating bay sequence, so segment boundaries are set by bay lines rather than by walls?
  • Is the tallest apparatus dimension measured with everything mounted?
  • Drive-through or reverse-in, and what does the apron allow?
Planning assumptionTypical configuration

Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.

Comparison

What changes at adjacent footprints

Computed comparison of nearby footprints for a fire and ems station building

FootprintFloor areaTraining bays
60x603,600 sq ft4 (4 x 1)
50x804,000 sq ft3 (3 x 1)
40x1004,000 sq ft4 (2 x 2)
60x804,800 sq ft6 (3 x 2)
40x1204,800 sq ft6 (2 x 3)

Areas computed from each stored size record; training bay counts computed with the same 20 by 32 foot planning module.

  • 60x60 moves the count from 12 to 4 training bays (4 across by 1 deep), which is the reason to choose between them.
  • 50x80 moves the count from 12 to 3 training bays (3 across by 1 deep), which is the reason to choose between them.
  • 40x100 moves the count from 12 to 4 training bays (2 across by 2 deep), which is the reason to choose between them.

Nearby footprints read for a fire and ems station building: exact change in area and in planning training bays

FootprintArea Δ% ΔTraining bays at that footprintWhat changes for this use
80x120+600 sq ft+6.7%16 (4 x 4)+4 training bays on the same planning module.
80x100−1,000 sq ft−11.1%12 (4 x 3)Same training bay count on this planning module; the difference is circulation and stored depth, not capacity.
50x150−1,500 sq ft−16.7%8 (2 x 4)−4 training bays on the same planning module.
60x120−1,800 sq ft−20%12 (3 x 4)Same training bay count on this planning module; the difference is circulation and stored depth, not capacity.

Areas are arithmetic on two stored size records; training bay counts use this platform's 20 by 32 foot planning module and are not a capacity statement.

Because this footprint is planned as a station combining an apparatus floor with dedicated training or drill space under one roof, the useful next reads are different from the ones a differently shaped fire and ems station building suggests: apparatus and training station, drill space planning, combined training fire station.

Visualization

Reading the 60x150 footprint as a fire and ems station building

150′ length60′ width9,000 sq ft
60x150 footprint plan, drawn from the stored dimensional record
12′ eave19.5′ ridge3:12 pitch · 60′ clear span
Gable cross section at a 14-foot eave and 3:12 pitch, computing to a 21.5-foot ridge

FAQ

Questions about 60x150 fire and ems station building projects

3 training bays fit across the 60-foot width with only 0 feet left over, which is a tight fit: the width is fully committed and nothing can be widened later without moving a wall. Those counts use a 20 by 32 foot planning module with 18 feet allowed for circulation, so a different module changes the answer.

Reserving 18 ft across the 60 ft dimension for movement leaves 42 ft of working width, which takes 2 training bays at 20 ft. Along 150 ft it takes 4 runs at 32 ft. That is 8 positions out of 9,000 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on can the training area be used at full activity while the apparatus bay stays clear and ready, or does one always have to stand down for the other. These are planning figures computed from the footprint, not a quoted layout.

A 4-inch slab across 9,000 square feet computes to 111.1 cubic yards before thickened edges, piers or waste. The final design comes from the foundation engineer.

It can be planned that way, but doing so routinely blurs the separation this mode depends on. If overflow storage is a real need, it is better planned as its own zone than absorbed into training space.

5,880 square feet of wall and 9,277 square feet of roof at a 3:12 pitch — the roof exceeding the floor by 3%.

Methodology

How this page was produced

Sources and methodology

Verified sourceExternal factual sources
  • Find Steel Buildings dimensional records

    Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.

  • International Building Code and International Residential Code

    International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.

Platform calculationComputed on this platform
  • Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
  • Training bay fit: Counts, leftover strips and per-module areas are computed from the stored 60x150 record against this platform's 20 by 32 foot planning module for the fire and ems station building category, with 18 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
  • Allocation model: Zone shares come from this platform's use typology for commercial and customer-facing operations and are applied arithmetically to the stored 150-foot length.
Planning assumptionPlanning assumptions
  • Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
  • Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.

Methodology notes

  • Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.

Cost drivers

Quantities that move the estimate at 60x150

The estimate at 60x150 moves with four computed quantities: 9,000 square feet of floor, 420 feet of perimeter, 5,880 square feet of wall and 9,277 square feet of roof. Everything else is site and specification. Two operations of the same size can want opposite plans, so the arithmetic below is a starting point rather than a recommendation.

Dedicated training space adds meaningfully to the footprint and its finishes beyond what the apparatus floor alone requires, and that addition is deliberate rather than incidental — it is what distinguishes this mode from a station with an apparatus floor only.

  • apparatus door height and width
  • drive-through bays versus reverse-in bays
  • exhaust capture in the bays
  • crew quarters as a separate conditioned envelope
Why we don't quote thisWe do not state 60x150 fire and ems station building pricing here, because it varies too much to give an honest figure. Published only with a documented inclusion basis, a collection date and a named source.

Drawn to scale

Plans and dimensions

Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.

150′ length60′ width9,000 sq ft
Computed from stored dimensions
Footprint plan — 60′ × 150′, drawn to the stored dimensions.Platform calculation
Front third3,000 sq ftCenter third3,000 sq ftRear third3,000 sq ft60′ × 150′ floor plate
Computed from stored dimensions
Floor plate divided into equal thirds along the length; each area is computed from the stored footprint.Platform calculation

Compare 60x150 fire and ems station building configurations

Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.

Get a Quote