Skip to content
Find Steel Buildings

Building Types

80x80 Equipment Storage Building

Width
80 ft
Length
80 ft
Floor area
6,400 sq ft
Perimeter
320 ft
Concept visualization of a equipment storage building at a representative 65 by 120 foot size; not a real project.
Example Configuration
equipment storage building concept visualization at a representative 65x120 size.Example configuration — for planning purposes only
Last updated Aug 27, 2026Reviewed under the Find Steel Buildings editorial standards

Get Quotes for a 80×80 Equipment Storage Building

Equipment Storage Building ✓80′ × 80′ ✓
Continue

Use

How a 80×80 Equipment Storage Building May Be Used

  • Equipment shelter

    Machinery clearance height and door width are usually the limiting factors, not floor area.

  • Commodity and forage

    Bulk storage depth against the sidewalls affects how the building is loaded and unloaded.

  • Drive-through access

    End-to-end access lets equipment pass through without reversing.

  • Seasonal working space

    Open floor is commonly kept for repairs and staging between seasons.

Example

Example Configuration

Example configuration of a 80 by 80 foot equipment storage building
Equipment Storage Building shown as an example configuration — for planning purposes only. Doors, colors and openings are specified for the actual project.

Quick dimensions

At a Glance

  • Width

    80 ft across the gable end.

  • Length

    80 ft along the sidewall.

  • Floor area

    6,400 sq ft of clear floor.

  • Eave height

    14 ft at the sidewall on the stored profile.

Configuration

How This Building Is Configured

80′ length80′ width6,400 sq ft
Footprint drawn to the stated dimensions.Platform calculation

Configuration summary

Building typeEquipment Storage Building
Footprint80 ft × 80 ft
Floor area6,400 sq ft
Eave height14 ft

Planning

Footprint & Space Planning

  • Footprint

    Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.

  • Height

    Eave height affects door options, storage height and how open the interior feels.

  • Access

    Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.

  • Doors and openings

    Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.

  • Site

    Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.

  • Expansion

    Extending along the length is usually simpler than changing the width later, which is worth deciding up front.

Access

Doors & Access Considerations

  • Opening width

    Across a 80 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.

  • Opening height

    A 14 ft eave sets the ceiling on door height before any frame change.

  • Drive-through

    Matching openings at both ends avoid reversing, at the cost of usable wall.

Similar sizes

Other Sizes for a Equipment Storage Building

Related

Related Building Types

FAQ

Common Questions

80 ft × 80 ft is 6,400 square feet of floor area before any interior partitions.

Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.

Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.

Compare nearby sizes

Related footprints for this building type

Each page works through one footprint for one building type.

Cost drivers

Quantities that move the estimate at 80x80

The estimate at 80x80 moves with four computed quantities: 6,400 square feet of floor, 320 feet of perimeter, 4,480 square feet of wall and 6,597 square feet of roof. Everything else is site and specification. Rows that cannot be entered independently end up used as one long space.

At this scale circulation, doors and floor together outweigh the marginal cost of enclosed area. That is why consolidated stores reward careful zoning: the expensive parts are the parts that move machines, not the parts that hold them.

  • full-width door openings and their operation
  • opening height set by the largest machine
  • condensation control above stored equipment
  • security provisions and hardware
Why we don't quote thisWe do not state 80x80 equipment storage building pricing here, because it varies too much to give an honest figure. Published only with a documented inclusion basis, a collection date and a named source.

Overview

A 80x80 equipment storage building planned as a consolidated store replacing several scattered buildings

This page is ordered around the floor itself, because at 80x80 the 6,400 sq ft available decides what a equipment storage building can hold before any other consideration applies.

The footprint holds 5 machine positions — 5 across by 1 deep — and leaves 26 feet of depth for a zoned edge where each formerly separate holding keeps its own identifiable ground rather than merging into one floor.

Read this footprint through its span. 80 feet across is the fixed constraint; 80 feet of length is the negotiable one, and at 1 to 1 the building is close to square, so movement runs in both directions. Set the openings before the interior, because the openings cannot move and the interior can.

An equipment storage building is an enclosed machinery store: it is planned around protecting parked capital at density and still being able to retrieve any one machine. It is reached low in ordinary weeks, sharp and impatient when a machine is called for. A 80 by 80 footprint is a near-square plan: 6,400 sq ft enclosed by 320 ft of wall, at a 1:1 length-to-width proportion. Along its 80 ft dimension it takes 2 runs of machine positions at 28 ft, leaving 24 ft over — the 24 ft is where the argument about this size actually happens. Taken purely as arithmetic, 80 by 80 gives 3 machine positions across the 80 ft dimension once 26 ft is reserved for movement, and 2 deep along the 80 ft dimension. Run as a a consolidated store replacing several scattered buildings, 9 ft across is below the 20 ft this use needs to be worth planning, so there is no zoned edge, so previously separate holdings mix on one floor and nobody is responsible for any part of it Doors are used rarely and matter enormously, because they are used exactly when the awkward item is moving.

At 80x80 the operating question is a specific one: when several stores become one, who owns which part of the floor? That is a different question from the one a equipment storage building of another shape has to answer, and it is why this footprint is planned as a consolidated store replacing several scattered buildings rather than as generic covered area.

Planning assumptionPlatform calculation

Areas, perimeter, roof area, ridge height, slab volume and the machine position counts on this page are computed from the stored 80x80 record and this platform's planning module for the equipment storage building category.

Usable area

How the 6,400 square feet divides at 80x80

Computed machine position fit for a 80x80 equipment storage building

MeasureComputed at this footprint
Machine positions across the 80-foot width5 at a 15-foot module
Leftover width5 ft (400 sq ft as a full-length strip)
Rows along the 80-foot length1 at a 28-foot module after 26 ft of circulation
Leftover depth26 ft (2,080 sq ft across the width)
Total machine positions5
Share of floor committed33%

Module footprint used here is 15 by 28 feet, this platform's planning module for a equipment storage building. It is not a code minimum or an engineered clearance.

Example allocation of the 80-foot length — planning model, not survey data

ZoneLength along the buildingComputed area
Equipment bays48 ft3,840 sq ft
Material and input storage20 ft1,600 sq ft
Working and turning space12 ft960 sq ft

Shares applied to the stored 80-foot length; areas computed against the 80-foot width.

Planning assumptionPlanning guidance

Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.

Allocation

Dividing the floor for a consolidated store replacing several scattered buildings

What it holds is self-propelled machines, attachments and implements that represent a large capital holding standing still. The storage pattern this floor drifts toward as the holding grows is a single-aisle machinery store with everything reachable from one run: there is no attachment wall, so attachments occupy floor that a machine could have used and are moved every time one is retrieved. Allocation works by zone, then by position within the zone. Zones defined by marked ground and named on the drawing survive; zones defined by understanding do not.

Because 26 feet clears the 20 feet this platform treats as usable, the end of the run is a room rather than a gap: 2,080 square feet for a zoned edge where each formerly separate holding keeps its own identifiable ground rather than merging into one floor. Where the building sits on the site changes how much of this floor is genuinely reachable.

The 5 feet of spare width runs the whole 80-foot length — 400 square feet of wall strip. It earns its keep as shelving, staging or a walking route, not as another machine position. Snow, wind and site exposure change what this shape costs to build long before the interior plan does.

The longest internal travel on a 80 by 80 plan is about 113 ft corner to corner, and the shortest useful one is the 80 ft cross-run. For a a consolidated store replacing several scattered buildings that matters where store consolidation planning sits, because shortening the 80 ft run to serve it lengthens every trip along the 80 ft dimension. Retrieval time is the quiet cost of density, and it is paid on the day the machine is urgently wanted. The perimeter is fully enclosed and lockable, because protection from weather and from theft is the reason the building exists. That movement pattern, not the 6,400-square-foot total, is what decides whether the leftover 26 feet is useful here.

Equipment bays48 × 80 ft · 3,840 sq ftMaterial and input storage20 × 80 ft · 1,600 sq ftWorking and turning space12 × 80 ft · 960 sq ft80 ft overall length
equipment and storage allocation allocation across the 80-foot length

Configurations

Configuring 5 machine positions at 80x80

Nominal bay division computes to 4 bays at about 20 feet, wider than the 15-foot module — so a position can sit inside a bay without a frame line splitting it. Fire separation, egress and occupancy are determined for the specific building and can reshape this plan entirely.

One row deep keeps the layout honest — no aisle to protect, no rear zone to serve, and the full 80-foot length available along the wall. The mezzanine that is added afterwards is the change order that reprices the frame.

A consolidated store should be planned with one extendable flank kept clear of yard infrastructure. Consolidation tends to attract further consolidation, and the second phase is far cheaper when the ground beside it was left alone.

Configured as a consolidated store replacing several scattered buildings, 80x80 is judged on whether the 5 machine positions it holds match the operation, and on whether the 5 feet of spare width leaves the route this mode depends on.

  • Does the work need racking or work zones on both sides with a full vehicle lane down the middle, or does it need a second lane that this 80-foot span cannot give?
  • Is the 80-foot length being bought for depth, or for the repeated bays — six to eight repeated bays, and the bay line becomes the organising device for the whole plan?
  • What is the largest machine, and does the opening clear it with the cab up?
  • Which machine leaves most often, and is it parked where it can?
Planning assumptionTypical configuration

Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.

Openings

Openings for 5 machine positions across

The 80-foot gable can carry 5 openings, one per machine position, with 5 feet of wall left for piers between and beside them — the arrangement that keeps each position independently reachable. Judge the plan by what has to happen on the worst day of the year, not on an average one.

Multiple openings serve a consolidated store better than one large one, because they let each zone reach the yard on its own path. Their placement should follow the zones rather than the elevation's symmetry.

Planning assumptionEngineering-required

Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.

Height

Interior height for a 80x80 equipment storage building

Across a 80-foot span the 3:12 pitch adds 10 feet between eave and ridge. The centreline measures 24 feet; anything parked or stacked near a wall lives with the 14-foot eave. Storage expands until it meets a wall, so give it a wall on purpose.

Height on a 80 ft span is a separate decision from the 80 ft length, and it is the span that sets the frame's behavior. Raising the eave over 6,400 sq ft affects every bay along the 80 ft dimension, so the test is whether store consolidation planning genuinely needs the extra clear height or only the floor area.

Ventilation across 6,400 square feet at this height: an enclosed building holding equipment that arrives wet needs air movement to avoid corrosion in storage.

Planning assumptionPlanning guidance

Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.

Comparison

What changes at adjacent footprints

Computed comparison of nearby footprints for a equipment storage building

FootprintFloor areaMachine positions
40x702,800 sq ft4 (2 x 2)
30x1003,000 sq ft6 (2 x 3)
50x603,000 sq ft4 (4 x 1)
40x803,200 sq ft6 (3 x 2)
60x603,600 sq ft3 (3 x 1)

Areas computed from each stored size record; machine position counts computed with the same 15 by 28 foot planning module.

  • 40x70 moves the count from 5 to 4 machine positions (2 across by 2 deep), which is the reason to choose between them.
  • 30x100 moves the count from 5 to 6 machine positions (2 across by 3 deep), which is the reason to choose between them.
  • 50x60 moves the count from 5 to 4 machine positions (4 across by 1 deep), which is the reason to choose between them.

Nearby footprints read for a equipment storage building: exact change in area and in planning machine positions

FootprintArea Δ% ΔMachine positions at that footprintWhat changes for this use
60x100−400 sq ft−6.2%15 (5 x 3)+10 machine positions on the same planning module.
60x120+800 sq ft+12.5%12 (4 x 3)+7 machine positions on the same planning module.
80x100+1,600 sq ft+25%10 (5 x 2)+5 machine positions on the same planning module.
60x80−1,600 sq ft−25%10 (5 x 2)+5 machine positions on the same planning module.

Areas are arithmetic on two stored size records; machine position counts use this platform's 15 by 28 foot planning module and are not a capacity statement.

Because this footprint is planned as a consolidated store replacing several scattered buildings, the useful next reads are different from the ones a differently shaped equipment storage building suggests: store consolidation planning, zoning a large machinery floor, two-way machine traffic.

Visualization

Reading the 80x80 footprint as a equipment storage building

80′ length80′ width6,400 sq ft
80x80 footprint plan, drawn from the stored dimensional record
12′ eave22′ ridge3:12 pitch · 80′ clear span
Gable cross section at a 14-foot eave and 3:12 pitch, computing to a 24-foot ridge

FAQ

Questions about 80x80 equipment storage building projects

It depends on the tallest machine as it is driven in, including any mast, cab or raised arm. The stored configuration computes to 24 feet at the ridge, but the eave is the number that governs anything standing near a wall.

Reserving 26 ft across the 80 ft dimension for movement leaves 54 ft of working width, which takes 3 machine positions at 15 ft. Along 80 ft it takes 2 runs at 28 ft. That is 6 positions out of 6,400 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on when several stores become one, who owns which part of the floor. These are planning figures computed from the footprint, not a quoted layout.

The footprint holds 5 machine positions — 5 across by 1 deep — and leaves 26 feet of depth for a zoned edge where each formerly separate holding keeps its own identifiable ground rather than merging into one floor. Those counts use a 15 by 28 foot planning module with 26 feet allowed for circulation, so a different module changes the answer.

Ownership of the floor. Machinery from different operations mixes, positions drift, and retrieval slows. Marked zones with names on the drawing are the cheapest defense.

A 4-inch slab across 6,400 square feet computes to 79 cubic yards before thickened edges, piers or waste. The final design comes from the foundation engineer.

Methodology

How this page was produced

Sources and methodology

Verified sourceExternal factual sources
  • Find Steel Buildings dimensional records

    Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.

  • International Building Code and International Residential Code

    International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.

Platform calculationComputed on this platform
  • Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
  • Machine position fit: Counts, leftover strips and per-module areas are computed from the stored 80x80 record against this platform's 15 by 28 foot planning module for the equipment storage building category, with 26 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
  • Allocation model: Zone shares come from this platform's use typology for agricultural equipment and crop shelter and are applied arithmetically to the stored 80-foot length.
Planning assumptionPlanning assumptions
  • Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
  • Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.

Methodology notes

  • Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.

Drawn to scale

Plans and dimensions

Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.

80′ length80′ width6,400 sq ft
Computed from stored dimensions
Footprint plan — 80′ × 80′, drawn to the stored dimensions.Platform calculation
Front third2,133 sq ftCenter third2,133 sq ftRear third2,133 sq ft80′ × 80′ floor plate
Computed from stored dimensions
Floor plate divided into equal thirds along the length; each area is computed from the stored footprint.Platform calculation

Compare 80x80 equipment storage building configurations

Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.

Get a Quote