60x200 Equipment Storage Building
- Width
- 60 ft
- Length
- 200 ft
- Floor area
- 12,000 sq ft
- Perimeter
- 520 ft

Use
How a 60×200 Equipment Storage Building May Be Used
Equipment shelter
Machinery clearance height and door width are usually the limiting factors, not floor area.
Commodity and forage
Bulk storage depth against the sidewalls affects how the building is loaded and unloaded.
Drive-through access
End-to-end access lets equipment pass through without reversing.
Seasonal working space
Open floor is commonly kept for repairs and staging between seasons.
Example
Example Configuration

Quick dimensions
At a Glance
Width
60 ft across the gable end.
Length
200 ft along the sidewall.
Floor area
12,000 sq ft of clear floor.
Eave height
14 ft at the sidewall on the stored profile.
Configuration
How This Building Is Configured
Configuration summary
| Building type | Equipment Storage Building |
|---|---|
| Footprint | 60 ft × 200 ft |
| Floor area | 12,000 sq ft |
| Eave height | 14 ft |
Planning
Footprint & Space Planning
Footprint
Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.
Height
Eave height affects door options, storage height and how open the interior feels.
Access
Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.
Doors and openings
Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.
Site
Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.
Expansion
Extending along the length is usually simpler than changing the width later, which is worth deciding up front.
Access
Doors & Access Considerations
Opening width
Across a 60 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.
Opening height
A 14 ft eave sets the ceiling on door height before any frame change.
Drive-through
Matching openings at both ends avoid reversing, at the cost of usable wall.
Similar sizes
Other Sizes for a Equipment Storage Building
60′ × 180′
10,800 sq ft
60′ × 220′
13,200 sq ft
50′ × 200′
10,000 sq ft
Related
Related Building Types
Example configuration — for planning purposes only.
FAQ
Common Questions
60 ft × 200 ft is 12,000 square feet of floor area before any interior partitions.
Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.
Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.
Compare nearby sizes
Related footprints for this building type
Each page works through one footprint for one building type.
Overview
A 60x200 equipment storage building planned as a high-bay store for tall machinery kept under one clear height
This page is ordered around zoning across the 60-foot span, because that is the dimension a equipment storage building cannot change later.
The footprint holds 15 machine positions — 3 across by 5 deep — and leaves 28 feet of depth for a tall bay at one end for the item that cannot be lowered, with clear floor around it for the approach it needs.
Efficiency is the useful number here: 800 square feet of enclosed floor per machine position, against a 480-square-foot module. That is generous — the footprint is doing more than hold modules. Noise from this floor reaches the office, the neighbours and the yard, and separation is a plan decision.
An equipment storage building is an enclosed machinery store: it is planned around protecting parked capital at density and still being able to retrieve any one machine. The perimeter is fully enclosed and lockable, because protection from weather and from theft is the reason the building exists. A 60 by 200 footprint is a long corridor of a plan: 12,000 sq ft enclosed by 520 ft of wall, at a 3.3:1 length-to-width proportion. Along its 200 ft dimension it takes 6 runs of machine positions at 30 ft, leaving 20 ft over — the 20 ft is where the argument about this size actually happens. Height is the expensive dimension, and in a machinery store it is usually driven by a small minority of the inventory. This footprint is planned around that fact: establish which items genuinely cannot be lowered, decide whether they justify raising the whole frame, and place them deliberately rather than by accident. An enclosed store protects capital that is standing still, which is a different job from housing capital that is working.
At 60x200 the operating question is a specific one: does one very tall machine set the height of the entire store, or does it get a bay of its own? That is a different question from the one a equipment storage building of another shape has to answer, and it is why this footprint is planned as a high-bay store for tall machinery kept under one clear height rather than as generic covered area.
Areas, perimeter, roof area, ridge height, slab volume and the machine position counts on this page are computed from the stored 60x200 record and this platform's planning module for the equipment storage building category.
Allocation
Dividing the floor for a high-bay store for tall machinery kept under one clear height
Turnover here is episodic: a machine may sit for weeks and then be wanted immediately. The storage pattern this floor drifts toward as the holding grows is a consolidated store replacing several scattered buildings: there is no zoned edge, so previously separate holdings mix on one floor and nobody is responsible for any part of it. Dividing the 12,000 sq ft by the 16 by 30 ft machine position gives roughly 12 positions before circulation is deducted a second time for cross movement. Whether the plan keeps 12 or drops to 6 comes back to the question this footprint is really answering: does one very tall machine set the height of the entire store, or does it get a bay of its own?
Because 28 feet clears the 16 feet this platform treats as usable, the end of the run is a room rather than a gap: 1,680 square feet for a tall bay at one end for the item that cannot be lowered, with clear floor around it for the approach it needs. Temperature swing on a steel shell drives condensation decisions that outrank most layout preferences.
Spare width is the more valuable of the two leftovers here: a continuous 12-foot strip beats the same area stranded at the end of the run, because it touches every position along the way. The count of working positions, not the headline area, is the figure that survives contact with the operation.
Retrieval in a high-bay store is complicated by the approach: tall machines often need a straighter run in and out, so the aisle serving them behaves differently from the rest of the floor. Machine dimensions, turning circles and transport heights come from the equipment manufacturer's data for each specific machine. As for work on the assets themselves, washing down, greasing and winter lay-up preparation, not scheduled repair work. That movement pattern, not the 12,000-square-foot total, is what decides whether the leftover 28 feet is useful here.
Usable area
How the 12,000 square feet divides at 60x200
Computed machine position fit for a 60x200 equipment storage building
| Measure | Computed at this footprint |
|---|---|
| Machine positions across the 60-foot width | 3 at a 16-foot module |
| Leftover width | 12 ft (2,400 sq ft as a full-length strip) |
| Rows along the 200-foot length | 5 at a 30-foot module after 22 ft of circulation |
| Leftover depth | 28 ft (1,680 sq ft across the width) |
| Total machine positions | 15 |
| Share of floor committed | 60% |
Module footprint used here is 16 by 30 feet, this platform's planning module for a equipment storage building. It is not a code minimum or an engineered clearance.
Example allocation of the 200-foot length — planning model, not survey data
| Zone | Length along the building | Computed area |
|---|---|---|
| Equipment bays | 120 ft | 7,200 sq ft |
| Material and input storage | 50 ft | 3,000 sq ft |
| Working and turning space | 30 ft | 1,800 sq ft |
Shares applied to the stored 200-foot length; areas computed against the 60-foot width.
Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.
Openings
Openings for 3 machine positions across
One opening per position works on this gable: 3 across 60 feet, with 12 feet of wall to distribute as piers. Splitting that margin evenly is what keeps the elevation buildable. Snow, wind and site exposure change what this shape costs to build long before the interior plan does.
Door height is the governing decision, and it is worth resolving before the frame. A door that fits everything except one machine defines that machine's home permanently, which may be an acceptable outcome if it is chosen rather than discovered.
Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.
Configurations
Configuring 15 machine positions at 60x200
Nominal bay division computes to 8 bays at about 25 feet, wider than the 16-foot module — so a position can sit inside a bay without a frame line splitting it. Access, not area, is what makes a plan feel small once it is in use.
With 5 rows deep, the rear row is behind the front one. Without a route past it, those machine positions become storage positions rather than working ones — the real cost of depth at this width. Set the openings before the interior, because the openings cannot move and the interior can.
Extension is cheapest along the 200 ft dimension, where each added bay repeats work already framed; widening past 60 ft is a different frame rather than a longer one. Growing to 60 by 230 adds a 7th run of machine positions — useful if the constraint is machine positions rather than the 20 ft already spare at the far end.
Configured as a high-bay store for tall machinery kept under one clear height, 60x200 is judged on whether the 15 machine positions it holds match the operation, and on whether the 12 feet of spare width leaves the route this mode depends on.
- Does the work need four lanes across, or two lanes flanking an interior work hall, or does it need a second lane that this 60-foot span cannot give?
- Is the 200-foot length being bought for depth, or for the repeated bays — a long uninterrupted bay sequence that suits repetitive layouts and continuous processes?
- What is the largest machine, and does the opening clear it with the cab up?
- Which machine leaves most often, and is it parked where it can?
Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.
Height
Interior height for a 60x200 equipment storage building
The stored configuration carries a 14-foot eave and computes to 21.5 feet at the ridge on a 3:12 pitch — a 7.5-foot rise across 60 feet. Height is therefore not uniform, and the sidewall is the constraint. Where the building sits on the site changes how much of this floor is genuinely reachable.
Height on a 60 ft span is a separate decision from the 200 ft length, and it is the span that sets the frame's behavior. Raising the eave over 12,000 sq ft affects every bay along the 200 ft dimension, so the test is whether clear height planning genuinely needs the extra clear height or only the floor area.
Ventilation across 12,000 square feet at this height: an enclosed building holding equipment that arrives wet needs air movement to avoid corrosion in storage.
Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.
Comparison
What changes at adjacent footprints
Computed comparison of nearby footprints for a equipment storage building
| Footprint | Floor area | Machine positions |
|---|---|---|
| 60x80 | 4,800 sq ft | 10 (5 x 2) |
| 40x120 | 4,800 sq ft | 12 (3 x 4) |
| 50x100 | 5,000 sq ft | 9 (3 x 3) |
| 60x100 | 6,000 sq ft | 15 (5 x 3) |
| 50x120 | 6,000 sq ft | 9 (3 x 3) |
Areas computed from each stored size record; machine position counts computed with the same 16 by 30 foot planning module.
- 60x80 moves the count from 15 to 10 machine positions (5 across by 2 deep), which is the reason to choose between them.
- 40x120 moves the count from 15 to 12 machine positions (3 across by 4 deep), which is the reason to choose between them.
- 50x100 moves the count from 15 to 9 machine positions (3 across by 3 deep), which is the reason to choose between them.
Nearby footprints read for a equipment storage building: exact change in area and in planning machine positions
| Footprint | Area Δ | % Δ | Machine positions at that footprint | What changes for this use |
|---|---|---|---|---|
| 100x100 | −2,000 sq ft | −16.7% | 12 (6 x 2) | −3 machine positions on the same planning module. |
| 60x150 | −3,000 sq ft | −25% | 12 (3 x 4) | −3 machine positions on the same planning module. |
| 100x150 | +3,000 sq ft | +25% | 24 (6 x 4) | +9 machine positions on the same planning module. |
| 80x200 | +4,000 sq ft | +33.3% | 30 (5 x 6) | +15 machine positions on the same planning module. |
Areas are arithmetic on two stored size records; machine position counts use this platform's 16 by 30 foot planning module and are not a capacity statement.
Because this footprint is planned as a high-bay store for tall machinery kept under one clear height, the useful next reads are different from the ones a differently shaped equipment storage building suggests: clear height planning, tall machine bay, eave height and cost.
Visualization
Reading the 60x200 footprint as a equipment storage building
FAQ
Questions about 60x200 equipment storage building projects
The width leaves 12 feet spare after 3 machine positions. That margin absorbs wall storage and passing room. Width is the dimension that cannot be extended later.
Reserving 22 ft across the 60 ft dimension for movement leaves 38 ft of working width, which takes 2 machine positions at 16 ft. Along 200 ft it takes 6 runs at 30 ft. That is 12 positions out of 12,000 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on does one very tall machine set the height of the entire store, or does it get a bay of its own. These are planning figures computed from the footprint, not a quoted layout.
Length here buys 5 rows and 8 nominal bays; width buys 3 positions side by side. At this aspect ratio the building is already long for its span, so extra length adds depth rather than capacity.
Less than the nominal eave, because bracing, purlins and services occupy part of it. The usable clear dimension for a specific building is confirmed by the manufacturer's drawings rather than estimated.
Length grows to hold more machines in the same order; width only grows when a machine cannot turn inside Practically, the 200-foot dimension is the one that extends; the 60-foot span is fixed once the frames are set.
Methodology
How this page was produced
Sources and methodology
Find Steel Buildings dimensional records
Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering
Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.
International Building Code and International Residential Code
International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering
Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.
- Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
- Machine position fit: Counts, leftover strips and per-module areas are computed from the stored 60x200 record against this platform's 16 by 30 foot planning module for the equipment storage building category, with 22 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
- Allocation model: Zone shares come from this platform's use typology for agricultural equipment and crop shelter and are applied arithmetically to the stored 200-foot length.
- Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
- Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.
Methodology notes
- Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.
Cost drivers
Quantities that move the estimate at 60x200
The estimate at 60x200 moves with four computed quantities: 12,000 square feet of floor, 520 feet of perimeter, 7,280 square feet of wall and 12,369 square feet of roof. Everything else is site and specification. Fire separation, egress and occupancy are determined for the specific building and can reshape this plan entirely.
Every foot of eave applies to the whole footprint, so height is the least local decision in the building. That is exactly why segregating the tall minority into their own bay is often the cheaper answer.
- full-width door openings and their operation
- opening height set by the largest machine
- condensation control above stored equipment
- security provisions and hardware
Drawn to scale
Plans and dimensions
Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.
Compare 60x200 equipment storage building configurations
Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.