Building Types
80x120 Equipment Storage Building
- Width
- 80 ft
- Length
- 120 ft
- Floor area
- 9,600 sq ft
- Perimeter
- 400 ft

Use
How a 80×120 Equipment Storage Building May Be Used
Equipment shelter
Machinery clearance height and door width are usually the limiting factors, not floor area.
Commodity and forage
Bulk storage depth against the sidewalls affects how the building is loaded and unloaded.
Drive-through access
End-to-end access lets equipment pass through without reversing.
Seasonal working space
Open floor is commonly kept for repairs and staging between seasons.
Example
Example Configuration

Quick dimensions
At a Glance
Width
80 ft across the gable end.
Length
120 ft along the sidewall.
Floor area
9,600 sq ft of clear floor.
Eave height
22 ft at the sidewall on the stored profile.
Configuration
How This Building Is Configured
Configuration summary
| Building type | Equipment Storage Building |
|---|---|
| Footprint | 80 ft × 120 ft |
| Floor area | 9,600 sq ft |
| Eave height | 22 ft |
Planning
Footprint & Space Planning
Footprint
Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.
Height
Eave height affects door options, storage height and how open the interior feels.
Access
Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.
Doors and openings
Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.
Site
Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.
Expansion
Extending along the length is usually simpler than changing the width later, which is worth deciding up front.
Access
Doors & Access Considerations
Opening width
Across a 80 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.
Opening height
A 22 ft eave sets the ceiling on door height before any frame change.
Drive-through
Matching openings at both ends avoid reversing, at the cost of usable wall.
Similar sizes
Other Sizes for a Equipment Storage Building
80′ × 100′
8,000 sq ft
80′ × 140′
11,200 sq ft
70′ × 120′
8,400 sq ft
Related
Related Building Types
Example configuration — for planning purposes only.
FAQ
Common Questions
80 ft × 120 ft is 9,600 square feet of floor area before any interior partitions.
Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.
Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.
Compare nearby sizes
Related footprints for this building type
Each page works through one footprint for one building type.
Overview
A 80x120 equipment storage building planned as a high-bay store for tall machinery kept under one clear height
This page is ordered around height and clearance, because at 80x120 the 22-foot eave limits a equipment storage building sooner than the plan does.
5 machine positions fit across the 80-foot width with only 0 feet left over, which is a tight fit: the width is fully committed and nothing can be widened later without moving a wall.
Efficiency is the useful number here: 640 square feet of enclosed floor per machine position, against a 480-square-foot module. That leaves working slack around each position. Fire separation, egress and occupancy are determined for the specific building and can reshape this plan entirely.
An equipment storage building is an enclosed machinery store: it is planned around protecting parked capital at density and still being able to retrieve any one machine. It is reached low in ordinary weeks, sharp and impatient when a machine is called for. A 80 by 120 footprint is a clearly directional plan: 9,600 sq ft enclosed by 400 ft of wall, at a 1.5:1 length-to-width proportion. Along its 120 ft dimension it takes 4 runs of machine positions at 30 ft, leaving 0 ft over — the 0 ft is where the argument about this size actually happens. Taken purely as arithmetic, 80 by 120 gives 3 machine positions across the 80 ft dimension once 22 ft is reserved for movement, and 4 deep along the 120 ft dimension. Run as a a high-bay store for tall machinery kept under one clear height, 10 ft across is below the 16 ft this use needs to be worth planning, so no dedicated tall bay exists, so the tallest item parks in an ordinary position and the whole building carries its height requirement Machines arrive dirty and leave marks, so the floor is a working surface rather than a finish.
This footprint is planned as a high-bay store for tall machinery kept under one clear height. Retrieval in a high-bay store is complicated by the approach: tall machines often need a straighter run in and out, so the aisle serving them behaves differently from the rest of the floor. Retrieval time is the quiet cost of density, and it is paid on the day the machine is urgently wanted. As for people, intermittent — the building is usually empty of people and full of machines.
Areas, perimeter, roof area, ridge height, slab volume and the machine position counts on this page are computed from the stored 80x120 record and this platform's planning module for the equipment storage building category.
Height
Interior height for a 80x120 equipment storage building
The stored configuration carries a 22-foot eave and computes to 35.3 feet at the ridge on a 4:12 pitch — a 13.3-foot rise across 80 feet. Height is therefore not uniform, and the sidewall is the constraint. Circulation width is the first thing surrendered under pressure and the first thing missed afterwards.
Clear height under the frame is not the same as the nominal eave, because purlins, bracing, lighting and any services hang below it. The usable figure is the one worth confirming with the supplier for the specific building.
Ventilation across 9,600 square feet at this height: an enclosed building holding equipment that arrives wet needs air movement to avoid corrosion in storage.
Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.
Usable area
How the 9,600 square feet divides at 80x120
Computed machine position fit for a 80x120 equipment storage building
| Measure | Computed at this footprint |
|---|---|
| Machine positions across the 80-foot width | 5 at a 16-foot module |
| Leftover width | 0 ft (0 sq ft as a full-length strip) |
| Rows along the 120-foot length | 3 at a 30-foot module after 22 ft of circulation |
| Leftover depth | 8 ft (640 sq ft across the width) |
| Total machine positions | 15 |
| Share of floor committed | 75% |
Module footprint used here is 16 by 30 feet, this platform's planning module for a equipment storage building. It is not a code minimum or an engineered clearance.
Example allocation of the 120-foot length — planning model, not survey data
| Zone | Length along the building | Computed area |
|---|---|---|
| Equipment bays | 72 ft | 5,760 sq ft |
| Material and input storage | 30 ft | 2,400 sq ft |
| Working and turning space | 18 ft | 1,440 sq ft |
Shares applied to the stored 120-foot length; areas computed against the 80-foot width.
Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.
Allocation
Dividing the floor for a high-bay store for tall machinery kept under one clear height
Turnover here is episodic: a machine may sit for weeks and then be wanted immediately. The storage pattern this floor drifts toward as the holding grows is a single-aisle machinery store with everything reachable from one run: there is no attachment wall, so attachments occupy floor that a machine could have used and are moved every time one is retrieved. Positions are allocated by vertical profile first and floor area second, which is the reverse of the usual instinct. A store sorted this way keeps its expensive clear height working instead of spending it on machines that never needed it.
There is no end zone at this footprint. 8 feet is circulation slack, not floor area with a purpose, and no dedicated tall bay exists, so the tallest item parks in an ordinary position and the whole building carries its height requirement. The mezzanine that is added afterwards is the change order that reprices the frame.
Width is fully committed at 80x120. With 0 feet spare, wall storage and passing room compete with the machine positions directly. Storage expands until it meets a wall, so give it a wall on purpose.
Retrieval in a high-bay store is complicated by the approach: tall machines often need a straighter run in and out, so the aisle serving them behaves differently from the rest of the floor. Retrieval time is the quiet cost of density, and it is paid on the day the machine is urgently wanted. As for people, intermittent — the building is usually empty of people and full of machines. That movement pattern, not the 9,600-square-foot total, is what decides whether the leftover 8 feet is useful here.
Openings
Openings for 5 machine positions across
Openings are the pinch point here. With 0 feet of spare width the gable cannot host 5 separate doors, so access is either shared or moved to the 120-foot sidewall. Two feet of spare width reads as nothing on a plan and as a great deal when a machine is being turned.
The 80 ft ends and the 120 ft sides offer very different opening budgets: 80 ft of end wall has room for one wide opening or two modest ones, while 120 ft of side wall can carry several without the openings competing. On this plan the deciding factor is whether clear height planning or tall machine bay should be the first thing reached from the door.
Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.
Configurations
Configuring 15 machine positions at 80x120
Nominal bay division computes to 5 bays at about 24 feet, wider than the 16-foot module — so a position can sit inside a bay without a frame line splitting it. Judge the plan by what has to happen on the worst day of the year, not on an average one.
With 3 rows deep, the rear row is behind the front one. Without a route past it, those machine positions become storage positions rather than working ones — the real cost of depth at this width. Rows that cannot be entered independently end up used as one long space.
Extending a high-bay store repeats an expensive frame, so growth should be planned toward the standard-height end where possible. Mixed-height extensions are common and are a legitimate way to avoid paying for height twice.
Configured as a high-bay store for tall machinery kept under one clear height, 80x120 is judged on whether the 15 machine positions it holds match the operation, and on whether the 0 feet of spare width leaves the route this mode depends on.
- Does the work need racking or work zones on both sides with a full vehicle lane down the middle, or does it need a second lane that this 80-foot span cannot give?
- Is the 120-foot length being bought for depth, or for the repeated bays — a long repeating bay sequence, so segment boundaries are set by bay lines rather than by walls?
- What is the largest machine, and does the opening clear it with the cab up?
- Which machine leaves most often, and is it parked where it can?
Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.
Comparison
What changes at adjacent footprints
Computed comparison of nearby footprints for a equipment storage building
| Footprint | Floor area | Machine positions |
|---|---|---|
| 50x80 | 4,000 sq ft | 6 (3 x 2) |
| 40x100 | 4,000 sq ft | 9 (3 x 3) |
| 60x80 | 4,800 sq ft | 10 (5 x 2) |
| 40x120 | 4,800 sq ft | 12 (3 x 4) |
| 50x100 | 5,000 sq ft | 9 (3 x 3) |
Areas computed from each stored size record; machine position counts computed with the same 16 by 30 foot planning module.
- 50x80 moves the count from 15 to 6 machine positions (3 across by 2 deep), which is the reason to choose between them.
- 40x100 moves the count from 15 to 9 machine positions (3 across by 3 deep), which is the reason to choose between them.
- 60x80 moves the count from 15 to 10 machine positions (5 across by 2 deep), which is the reason to choose between them.
Nearby footprints read for a equipment storage building: exact change in area and in planning machine positions
| Footprint | Area Δ | % Δ | Machine positions at that footprint | What changes for this use |
|---|---|---|---|---|
| 100x100 | +400 sq ft | +4.2% | 12 (6 x 2) | −3 machine positions on the same planning module. |
| 60x150 | −600 sq ft | −6.2% | 12 (3 x 4) | −3 machine positions on the same planning module. |
| 80x100 | −1,600 sq ft | −16.7% | 10 (5 x 2) | −5 machine positions on the same planning module. |
| 80x150 | +2,400 sq ft | +25% | 20 (5 x 4) | +5 machine positions on the same planning module. |
Areas are arithmetic on two stored size records; machine position counts use this platform's 16 by 30 foot planning module and are not a capacity statement.
Because this footprint is planned as a high-bay store for tall machinery kept under one clear height, the useful next reads are different from the ones a differently shaped equipment storage building suggests: clear height planning, tall machine bay, eave height and cost.
Visualization
Reading the 80x120 footprint as a equipment storage building
FAQ
Questions about 80x120 equipment storage building projects
It depends on the tallest machine as it is driven in, including any mast, cab or raised arm. The stored configuration computes to 35.3 feet at the ridge, but the eave is the number that governs anything standing near a wall.
Reserving 22 ft across the 80 ft dimension for movement leaves 58 ft of working width, which takes 3 machine positions at 16 ft. Along 120 ft it takes 4 runs at 30 ft. That is 12 positions out of 9,600 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on does one very tall machine set the height of the entire store, or does it get a bay of its own. These are planning figures computed from the footprint, not a quoted layout.
5 machine positions fit across the 80-foot width with only 0 feet left over, which is a tight fit: the width is fully committed and nothing can be widened later without moving a wall. Those counts use a 16 by 30 foot planning module with 22 feet allowed for circulation, so a different module changes the answer.
Less than the nominal eave, because bracing, purlins and services occupy part of it. The usable clear dimension for a specific building is confirmed by the manufacturer's drawings rather than estimated.
A 6-inch slab across 9,600 square feet computes to 177.8 cubic yards before thickened edges, piers or waste. The final design comes from the foundation engineer.
Methodology
How this page was produced
Sources and methodology
Find Steel Buildings dimensional records
Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering
Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.
International Building Code and International Residential Code
International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering
Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.
- Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
- Machine position fit: Counts, leftover strips and per-module areas are computed from the stored 80x120 record against this platform's 16 by 30 foot planning module for the equipment storage building category, with 22 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
- Allocation model: Zone shares come from this platform's use typology for agricultural equipment and crop shelter and are applied arithmetically to the stored 120-foot length.
- Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
- Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.
Methodology notes
- Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.
Cost drivers
Quantities that move the estimate at 80x120
No price appears on this page. The quantities that scale an estimate at 80x120 are 9,600 square feet of slab, 177.8 cubic yards of nominal concrete, 8,800 square feet of wall cladding and 10,119 square feet of roof cladding. The plan is only as good as the route into it, which is a site question rather than a building one.
Proportion drives cost here as much as size does: 400 ft of wall around 9,600 sq ft is 0.042 ft of wall per enclosed square foot, and a squarer plan of the same area would carry less. What moves the figure further on a a high-bay store for tall machinery kept under one clear height is the fit-out clear height planning implies, along with framed openings and the height chosen for the 80 ft span.
- full-width door openings and their operation
- opening height set by the largest machine
- condensation control above stored equipment
- security provisions and hardware
Drawn to scale
Plans and dimensions
Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.
Compare 80x120 equipment storage building configurations
Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.




