Building Types
80x100 Steel Aircraft Hangar
- Width
- 80 ft
- Length
- 100 ft
- Floor area
- 8,000 sq ft
- Perimeter
- 360 ft

Use
How a 80×100 Aircraft Hangar May Be Used
Door span
The clear door opening, not the footprint, is usually the governing dimension.
Tail height
Required clearance is set by the aircraft, and it drives eave and door height.
Maintenance area
Working space around the aircraft is planned separately from the parking envelope.
Apron access
Approach and taxi access affect where the opening is placed.
Example
Example Configuration

Quick dimensions
At a Glance
Width
80 ft across the gable end.
Length
100 ft along the sidewall.
Floor area
8,000 sq ft of clear floor.
Eave height
20 ft at the sidewall on the stored profile.
Configuration
How This Building Is Configured
Configuration summary
| Building type | Aircraft Hangar |
|---|---|
| Footprint | 80 ft × 100 ft |
| Floor area | 8,000 sq ft |
| Eave height | 20 ft |
Planning
Footprint & Space Planning
Footprint
Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.
Height
Eave height is commonly the governing dimension here, because clearance for the tallest item sets the door and the wall.
Access
Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.
Doors and openings
Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.
Site
Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.
Expansion
Extending along the length is usually simpler than changing the width later, which is worth deciding up front.
Access
Doors & Access Considerations
Opening width
Across a 80 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.
Opening height
A 20 ft eave sets the ceiling on door height before any frame change.
Drive-through
Matching openings at both ends avoid reversing, at the cost of usable wall.
Similar sizes
Other Sizes for a Aircraft Hangar
80′ × 80′
6,400 sq ft
80′ × 120′
9,600 sq ft
70′ × 100′
7,000 sq ft
Related
Related Building Types

Helicopter Hangar
Explore
Clear Span Building
Explore
Commercial Building
Explore
Industrial Building
Explore
Example configuration — for planning purposes only.
FAQ
Common Questions
80 ft × 100 ft is 8,000 square feet of floor area before any interior partitions.
Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.
Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.
Compare nearby sizes
Related footprints for this building type
Each page works through one footprint for one building type.
Cost drivers
Quantities that move the estimate at 80x100
The estimate at 80x100 moves with four computed quantities: 8,000 square feet of floor, 360 feet of perimeter, 7,200 square feet of wall and 8,433 square feet of roof. Everything else is site and specification. Access, not area, is what makes a plan feel small once it is in use.
Proportion drives cost here as much as size does: 360 ft of wall around 8,000 sq ft is 0.045 ft of wall per enclosed square foot, and a squarer plan of the same area would carry less. What moves the figure further on a a hangar built around maintenance and inspection work rather than overnight parking is the fit-out aircraft maintenance hangar planning implies, along with framed openings and the height chosen for the 80 ft span.
- the door system type, which drives the end-frame design
- the clear opening width and height the aircraft requires
- the eave height the door opening forces across the frame
- the apron outside the opening
Overview
A 80x100 aircraft hangar planned as a hangar built around maintenance and inspection work rather than overnight parking
This page is ordered around taxi line, because that is the decision this footprint settles first and every later choice follows from it.
The footprint holds 1 maintenance station — 1 across by 1 deep — and leaves 34 feet of depth for a parts and documentation area set apart from the aircraft footprint, so removed components and paperwork have a fixed place during a long job.
Efficiency is the useful number here: 8,000 square feet of enclosed floor per maintenance station, against a 2200-square-foot module. That is generous — the footprint is doing more than hold modules. Service routes are cheap to plan now and expensive to retrofit through a finished shell.
A 80 by 100 footprint is a mildly directional plan: 8,000 sq ft enclosed by 360 ft of wall, at a 1.3:1 length-to-width proportion. Along its 100 ft dimension it takes 2 runs of maintenance stations at 50 ft, leaving 0 ft over — the 0 ft is where the argument about this size actually happens. Maintenance changes the planning brief because the aircraft is present far longer and in a less complete state than in a storage hangar. The building has to hold a partially disassembled aircraft, its removed parts, and the paperwork tracking the work, all at once and for an extended stay. Occupancy, door engineering, and any operational clearance for a specific aircraft are determined by the design professional and the authority having jurisdiction.
This footprint is planned as a hangar built around maintenance and inspection work rather than overnight parking. Spent as a square 89 by 89 instead, the same 8,000 sq ft would stand 1 maintenance stations across rather than 1, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. Compared with a 80 by 80 of the same width, the extra depth here adds run rather than reach: it buys about 2 maintenance stations in line, and every position past the second is retrieved by moving what stands in front of it. A building of this size behaves like a small yard under a roof: zones need to be defined, signed and left alone, or they migrate. Work proceeds over an extended, sometimes interrupted timeline rather than in a single visit, so the plan needs to tolerate the aircraft being incomplete on the floor for long stretches without the building becoming disorganized. Ground vehicles and equipment sharing hangar floor with an aircraft need a fixed position outside its swept path, decided at the planning stage rather than negotiated daily.
Areas, perimeter, roof area, ridge height, slab volume and the maintenance station counts on this page are computed from the stored 80x100 record and this platform's planning module for the aircraft hangar category.
Usable area
How the 8,000 square feet divides at 80x100
Computed maintenance station fit for a 80x100 aircraft hangar
| Measure | Computed at this footprint |
|---|---|
| Maintenance stations across the 80-foot width | 1 at a 44-foot module |
| Leftover width | 36 ft (3,600 sq ft as a full-length strip) |
| Rows along the 100-foot length | 1 at a 50-foot module after 16 ft of circulation |
| Leftover depth | 34 ft (2,720 sq ft across the width) |
| Total maintenance stations | 1 |
| Share of floor committed | 28% |
Module footprint used here is 44 by 50 feet, this platform's planning module for a aircraft hangar. It is not a code minimum or an engineered clearance.
Example allocation of the 100-foot length — planning model, not survey data
| Zone | Length along the building | Computed area |
|---|---|---|
| Aircraft parking area | 70 ft | 5,600 sq ft |
| Maintenance and equipment space | 20 ft | 1,600 sq ft |
| Office, parts and utility | 10 ft | 800 sq ft |
Shares applied to the stored 100-foot length; areas computed against the 80-foot width.
Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.
Openings
Openings for 1 maintenance station across
At 80 feet the gable will not comfortably take one opening per maintenance station: 1 position with 36 feet spare leaves too little wall for piers. A single wider opening, or a sidewall opening, is the workable route. The count of working positions, not the headline area, is the figure that survives contact with the operation.
The main door is used infrequently relative to a storage hangar, while a smaller parts or personnel door sees far more regular traffic and should not require operating the main door.
Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.
Allocation
Dividing the floor for a hangar built around maintenance and inspection work rather than overnight parking
The operation this hangar floor could equally be run as is a private hangar built around one owner's aircraft and personal storage: there is no side bay, so personal storage lines the same walls the aircraft has to clear on its way in and out. Dividing the 8,000 sq ft by the 44 by 50 ft maintenance station gives roughly 2 positions before circulation is deducted a second time for cross movement. Whether the plan keeps 2 or drops to 1 comes back to the question this footprint is really answering: when an aircraft sits for days or weeks rather than overnight, is there somewhere for what comes off it that is not the floor around it?
Depth arithmetic leaves a working end zone here. 2,720 square feet sits past the last row, which is why 80x100 tends to be planned with a parts and documentation area set apart from the aircraft footprint, so removed components and paperwork have a fixed place during a long job designed in rather than added later. Every foot of width added multiplies through the roof and the frame; every foot of length mostly adds skin.
The 36 feet of spare width runs the whole 100-foot length — 3,600 square feet of wall strip. It earns its keep as shelving, staging or a walking route, not as another maintenance station. Cleaning, maintenance and inspection all need reach, and reach is planned in the gaps rather than in the modules.
Spent as a square 89 by 89 instead, the same 8,000 sq ft would stand 1 maintenance stations across rather than 1, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. Compared with a 80 by 80 of the same width, the extra depth here adds run rather than reach: it buys about 2 maintenance stations in line, and every position past the second is retrieved by moving what stands in front of it. A building of this size behaves like a small yard under a roof: zones need to be defined, signed and left alone, or they migrate. Work proceeds over an extended, sometimes interrupted timeline rather than in a single visit, so the plan needs to tolerate the aircraft being incomplete on the floor for long stretches without the building becoming disorganized. Ground vehicles and equipment sharing hangar floor with an aircraft need a fixed position outside its swept path, decided at the planning stage rather than negotiated daily. That movement pattern, not the 8,000-square-foot total, is what decides whether the leftover 34 feet is useful here.
Configurations
Configuring 1 maintenance station at 80x100
Nominal bay division computes to 4 bays at about 25 feet, narrower than the 44-foot module — so frame lines land inside positions and the interior has to be set out from the columns. A building that cannot be reversed out of is a building that gets used in one direction only.
A single row means nothing is trapped: every position faces the opening directly, which is this footprint's advantage over a deeper building of the same width. Noise from this floor reaches the office, the neighbours and the yard, and separation is a plan decision.
Growth is usually answered in the parts and support area first, since the aircraft zone is already sized with margin and rarely becomes the limiting factor before support space does.
Configured as a hangar built around maintenance and inspection work rather than overnight parking, 80x100 is judged on whether the 1 maintenance station it holds match the operation, and on whether the 36 feet of spare width leaves the route this mode depends on.
- Does the work need racking or work zones on both sides with a full vehicle lane down the middle, or does it need a second lane that this 80-foot span cannot give?
- Is the 100-foot length being bought for depth, or for the repeated bays — eight to ten repeated bays, which makes the layout a scheduling problem as much as a spatial one?
- Which aircraft dimension governs — wingspan at the opening or tail height?
- Which door system suits the operation, and has the end frame been designed for it?
Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.
Height
Interior height for a 80x100 aircraft hangar
Span drives headroom at 80x100: 80 feet of width on a 4:12 pitch puts 33.3 feet over the middle and 20 feet at the walls, so where a tall item stands matters as much as how tall it is. Temperature swing on a steel shell drives condensation decisions that outrank most layout preferences.
Height on a 80 ft span is a separate decision from the 100 ft length, and it is the span that sets the frame's behavior. Raising the eave over 8,000 sq ft affects every bay along the 100 ft dimension, so the test is whether aircraft maintenance hangar planning genuinely needs the extra clear height or only the floor area.
Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.
Comparison
What changes at adjacent footprints
Computed comparison of nearby footprints for a aircraft hangar
| Footprint | Floor area | Maintenance stations |
|---|---|---|
| 40x80 | 3,200 sq ft | 1 (1 x 1) |
| 60x60 | 3,600 sq ft | 1 (1 x 1) |
| 50x80 | 4,000 sq ft | 1 (1 x 1) |
| 40x100 | 4,000 sq ft | 2 (1 x 2) |
| 60x80 | 4,800 sq ft | 1 (1 x 1) |
Areas computed from each stored size record; maintenance station counts computed with the same 44 by 50 foot planning module.
- 40x80 holds the same 1 maintenance stations but changes the leftover depth by -8 feet, which is where the difference is actually felt.
- 60x60 holds the same 1 maintenance stations but changes the leftover depth by -29 feet, which is where the difference is actually felt.
- 50x80 holds the same 1 maintenance stations but changes the leftover depth by -8 feet, which is where the difference is actually felt.
Nearby footprints read for a aircraft hangar: exact change in area and in planning maintenance stations
| Footprint | Area Δ | % Δ | Maintenance stations at that footprint | What changes for this use |
|---|---|---|---|---|
| 50x150 | −500 sq ft | −6.2% | 2 (1 x 2) | +1 maintenance station on the same planning module. |
| 60x150 | +1,000 sq ft | +12.5% | 3 (1 x 3) | +2 maintenance stations on the same planning module. |
| 80x120 | +1,600 sq ft | +20% | 4 (2 x 2) | +3 maintenance stations on the same planning module. |
| 80x80 | −1,600 sq ft | −20% | 2 (2 x 1) | +1 maintenance station on the same planning module. |
Areas are arithmetic on two stored size records; maintenance station counts use this platform's 44 by 50 foot planning module and are not a capacity statement.
Because this footprint is planned as a hangar built around maintenance and inspection work rather than overnight parking, the useful next reads are different from the ones a differently shaped aircraft hangar suggests: aircraft maintenance hangar planning, parts and documentation area, extended-stay hangar layout.
Visualization
Reading the 80x100 footprint as a aircraft hangar
FAQ
Questions about 80x100 aircraft hangar projects
7,200 square feet of wall and 8,433 square feet of roof at a 4:12 pitch — the roof exceeding the floor by 5%.
Reserving 16 ft across the 80 ft dimension for movement leaves 64 ft of working width, which takes 1 maintenance stations at 44 ft. Along 100 ft it takes 2 runs at 50 ft. That is 2 positions out of 8,000 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on when an aircraft sits for days or weeks rather than overnight, is there somewhere for what comes off it that is not the floor around it. These are planning figures computed from the footprint, not a quoted layout.
The width leaves 36 feet spare after 1 maintenance station. That margin absorbs wall storage and passing room. Width is the dimension that cannot be extended later.
Enclosure keeps small components and paperwork from migrating across the floor, at some cost to flexibility; the specific arrangement is a planning choice for the operation involved.
Length here buys 1 row and 4 nominal bays; width buys 1 position side by side. At this aspect ratio both dimensions are still adding usable positions.
Methodology
How this page was produced
Sources and methodology
Find Steel Buildings dimensional records
Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering
Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.
International Building Code and International Residential Code
International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering
Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.
- Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
- Maintenance station fit: Counts, leftover strips and per-module areas are computed from the stored 80x100 record against this platform's 44 by 50 foot planning module for the aircraft hangar category, with 16 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
- Allocation model: Zone shares come from this platform's use typology for aircraft storage and maintenance and are applied arithmetically to the stored 100-foot length.
- Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
- Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.
Methodology notes
- Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.
Drawn to scale
Plans and dimensions
Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.
Continue your research
Related planning topics
Background reading on the questions this page raises. None of these pages sells anything.
Compare 80x100 aircraft hangar configurations
Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.
