Skip to content
Find Steel Buildings

Building Types

50x150 Steel Aircraft Hangar

Width
50 ft
Length
150 ft
Floor area
7,500 sq ft
Perimeter
400 ft
50x150 Steel Aircraft Hangar example configuration
Example configuration — for planning purposes only.
Last updated Aug 26, 2026Reviewed under the Find Steel Buildings editorial standards

Get Quotes for a 50×150 Aircraft Hangar

Aircraft Hangar ✓50′ × 150′ ✓
Continue

Use

How a 50×150 Aircraft Hangar May Be Used

  • Door span

    The clear door opening, not the footprint, is usually the governing dimension.

  • Tail height

    Required clearance is set by the aircraft, and it drives eave and door height.

  • Maintenance area

    Working space around the aircraft is planned separately from the parking envelope.

  • Apron access

    Approach and taxi access affect where the opening is placed.

Example

Example Configuration

Example configuration of a 50 by 150 foot aircraft hangar
Aircraft Hangar shown as an example configuration — for planning purposes only. Doors, colors and openings are specified for the actual project.

Quick dimensions

At a Glance

  • Width

    50 ft across the gable end.

  • Length

    150 ft along the sidewall.

  • Floor area

    7,500 sq ft of clear floor.

  • Eave height

    14 ft at the sidewall on the stored profile.

Configuration

How This Building Is Configured

150′ length50′ width7,500 sq ft
Footprint drawn to the stated dimensions.Platform calculation

Configuration summary

Building typeAircraft Hangar
Footprint50 ft × 150 ft
Floor area7,500 sq ft
Eave height14 ft

Planning

Footprint & Space Planning

  • Footprint

    Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.

  • Height

    Eave height is commonly the governing dimension here, because clearance for the tallest item sets the door and the wall.

  • Access

    Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.

  • Doors and openings

    Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.

  • Site

    Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.

  • Expansion

    Extending along the length is usually simpler than changing the width later, which is worth deciding up front.

Access

Doors & Access Considerations

  • Opening width

    Across a 50 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.

  • Opening height

    A 14 ft eave sets the ceiling on door height before any frame change.

  • Drive-through

    Matching openings at both ends avoid reversing, at the cost of usable wall.

Similar sizes

Other Sizes for a Aircraft Hangar

  • 130′ length50′ width6,500 sq ft

    50′ × 130′

    6,500 sq ft

  • 170′ length50′ width8,500 sq ft

    50′ × 170′

    8,500 sq ft

  • 150′ length40′ width6,000 sq ft

    40′ × 150′

    6,000 sq ft

Related

Related Building Types

FAQ

Common Questions

50 ft × 150 ft is 7,500 square feet of floor area before any interior partitions.

Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.

Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.

Compare nearby sizes

Related footprints for this building type

Each page works through one footprint for one building type.

Cost drivers

Quantities that move the estimate at 50x150

Quantities, not prices, are publishable here: roof cladding runs 7,731 square feet — 3% above the 7,500-square-foot floor at a 3:12 pitch — with 92.6 cubic yards of nominal slab beneath it. Circulation width is the first thing surrendered under pressure and the first thing missed afterwards.

Proportion drives cost here as much as size does: 400 ft of wall around 7,500 sq ft is 0.053 ft of wall per enclosed square foot, and a squarer plan of the same area would carry less. What moves the figure further on a a hangar built around maintenance and inspection work rather than overnight parking is the fit-out aircraft maintenance hangar planning implies, along with framed openings and the height chosen for the 50 ft span.

  • the door system type, which drives the end-frame design
  • the clear opening width and height the aircraft requires
  • the eave height the door opening forces across the frame
  • the apron outside the opening
Why we don't quote thisWe do not state 50x150 aircraft hangar pricing here, because it varies too much to give an honest figure. Published only with a documented inclusion basis, a collection date and a named source.

Overview

A 50x150 aircraft hangar planned as a hangar built around maintenance and inspection work rather than overnight parking

This page is ordered around taxi line, because that is the decision this footprint settles first and every later choice follows from it.

The footprint holds 2 maintenance stations — 1 across by 2 deep — and leaves 34 feet of depth for a parts and documentation area set apart from the aircraft footprint, so removed components and paperwork have a fixed place during a long job.

What distinguishes 50x150 is depth behaviour: 2 rows along 150 feet after 16 feet of circulation, with 34 feet unaccounted for at the end of the run. Where the building sits on the site changes how much of this floor is genuinely reachable.

A 50 by 150 footprint is a long corridor of a plan: 7,500 sq ft enclosed by 400 ft of wall, at a 3:1 length-to-width proportion. Along its 150 ft dimension it takes 3 runs of maintenance stations at 50 ft, leaving 0 ft over — the 0 ft is where the argument about this size actually happens. Maintenance changes the planning brief because the aircraft is present far longer and in a less complete state than in a storage hangar. The building has to hold a partially disassembled aircraft, its removed parts, and the paperwork tracking the work, all at once and for an extended stay. Occupancy, door engineering, and any operational clearance for a specific aircraft are determined by the design professional and the authority having jurisdiction.

This footprint is planned as a hangar built around maintenance and inspection work rather than overnight parking. Compared with a 50 by 110 of the same width, the extra depth here adds run rather than reach: it buys about 3 maintenance stations in line, and every position past the second is retrieved by moving what stands in front of it. Spent as a square 87 by 87 instead, the same 7,500 sq ft would stand 1 maintenance stations across rather than 1, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. At this size the building becomes a shared resource, and shared resources need a written rule for who parks where and which door is kept clear. Work proceeds over an extended, sometimes interrupted timeline rather than in a single visit, so the plan needs to tolerate the aircraft being incomplete on the floor for long stretches without the building becoming disorganized. Clear height for a specific aircraft is confirmed with its manufacturer rather than assumed from the footprint alone.

Planning assumptionPlatform calculation

Areas, perimeter, roof area, ridge height, slab volume and the maintenance station counts on this page are computed from the stored 50x150 record and this platform's planning module for the aircraft hangar category.

Usable area

How the 7,500 square feet divides at 50x150

Computed maintenance station fit for a 50x150 aircraft hangar

MeasureComputed at this footprint
Maintenance stations across the 50-foot width1 at a 44-foot module
Leftover width6 ft (900 sq ft as a full-length strip)
Rows along the 150-foot length2 at a 50-foot module after 16 ft of circulation
Leftover depth34 ft (1,700 sq ft across the width)
Total maintenance stations2
Share of floor committed59%

Module footprint used here is 44 by 50 feet, this platform's planning module for a aircraft hangar. It is not a code minimum or an engineered clearance.

Example allocation of the 150-foot length — planning model, not survey data

ZoneLength along the buildingComputed area
Aircraft parking area105 ft5,250 sq ft
Maintenance and equipment space30 ft1,500 sq ft
Office, parts and utility15 ft750 sq ft

Shares applied to the stored 150-foot length; areas computed against the 50-foot width.

Planning assumptionPlanning guidance

Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.

Openings

Openings for 1 maintenance station across

Openings are the pinch point here. With 6 feet of spare width the gable cannot host 1 separate doors, so access is either shared or moved to the 150-foot sidewall. Rows that cannot be entered independently end up used as one long space.

The 50 ft ends and the 150 ft sides offer very different opening budgets: 50 ft of end wall has room for one wide opening or two modest ones, while 150 ft of side wall can carry several without the openings competing. On this plan the deciding factor is whether aircraft maintenance hangar planning or parts and documentation area should be the first thing reached from the door.

Planning assumptionEngineering-required

Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.

Allocation

Dividing the floor for a hangar built around maintenance and inspection work rather than overnight parking

The operation this hangar floor could equally be run as is a based-operations hangar combining aircraft floor with office and crew functions: there is no enclosed wing, so office and crew functions occupy corners of the clear floor and reduce it to less than a full rectangle. Dividing the 7,500 sq ft by the 44 by 50 ft maintenance station gives roughly 3 positions before circulation is deducted a second time for cross movement. Whether the plan keeps 3 or drops to 1 comes back to the question this footprint is really answering: when an aircraft sits for days or weeks rather than overnight, is there somewhere for what comes off it that is not the floor around it?

Because 34 feet clears the 14 feet this platform treats as usable, the end of the run is a room rather than a gap: 1,700 square feet for a parts and documentation area set apart from the aircraft footprint, so removed components and paperwork have a fixed place during a long job. Snow, wind and site exposure change what this shape costs to build long before the interior plan does.

Spare width is the more valuable of the two leftovers here: a continuous 6-foot strip beats the same area stranded at the end of the run, because it touches every position along the way. Fire separation, egress and occupancy are determined for the specific building and can reshape this plan entirely.

Compared with a 50 by 110 of the same width, the extra depth here adds run rather than reach: it buys about 3 maintenance stations in line, and every position past the second is retrieved by moving what stands in front of it. Spent as a square 87 by 87 instead, the same 7,500 sq ft would stand 1 maintenance stations across rather than 1, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. At this size the building becomes a shared resource, and shared resources need a written rule for who parks where and which door is kept clear. Work proceeds over an extended, sometimes interrupted timeline rather than in a single visit, so the plan needs to tolerate the aircraft being incomplete on the floor for long stretches without the building becoming disorganized. Clear height for a specific aircraft is confirmed with its manufacturer rather than assumed from the footprint alone. That movement pattern, not the 7,500-square-foot total, is what decides whether the leftover 34 feet is useful here.

Aircraft parking area105 × 50 ft · 5,250 sq ftMaintenance and equipment space30 × 50 ft · 1,500 sq ftOffice, parts and utility15 × 50 ft · 750 sq ft150 ft overall length
aircraft and maintenance allocation allocation across the 150-foot length

Configurations

Configuring 2 maintenance stations at 50x150

Nominal bay division computes to 6 bays at about 25 feet, narrower than the 44-foot module — so frame lines land inside positions and the interior has to be set out from the columns. The mezzanine that is added afterwards is the change order that reprices the frame.

Depth here creates a hierarchy: 2 rows means front positions get used and rear positions get filled. Deciding which is which up front is what keeps 50x150 workable. Storage expands until it meets a wall, so give it a wall on purpose.

Growth is usually answered in the parts and support area first, since the aircraft zone is already sized with margin and rarely becomes the limiting factor before support space does.

Configured as a hangar built around maintenance and inspection work rather than overnight parking, 50x150 is judged on whether the 2 maintenance stations it holds match the operation, and on whether the 6 feet of spare width leaves the route this mode depends on.

  • Does the work need three lanes and a working lane, or two lanes with an interior work hall between them, or does it need a second lane that this 50-foot span cannot give?
  • Is the 150-foot length being bought for depth, or for the repeated bays — a long repeating bay sequence, so segment boundaries are set by bay lines rather than by walls?
  • Which aircraft dimension governs — wingspan at the opening or tail height?
  • Which door system suits the operation, and has the end frame been designed for it?
Planning assumptionTypical configuration

Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.

Height

Interior height for a 50x150 aircraft hangar

Span drives headroom at 50x150: 50 feet of width on a 3:12 pitch puts 20.3 feet over the middle and 14 feet at the walls, so where a tall item stands matters as much as how tall it is. Judge the plan by what has to happen on the worst day of the year, not on an average one.

Overhead clearance for any lifting or access equipment used during inspection is a specific determination for the equipment and aircraft involved, made with the design professional rather than assumed from the shell.

Planning assumptionPlanning guidance

Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.

Comparison

What changes at adjacent footprints

Computed comparison of nearby footprints for a aircraft hangar

FootprintFloor areaMaintenance stations
30x1003,000 sq ft0 (0 x 2)
50x603,000 sq ft1 (1 x 1)
40x803,200 sq ft1 (1 x 1)
60x603,600 sq ft1 (1 x 1)
50x804,000 sq ft1 (1 x 1)

Areas computed from each stored size record; maintenance station counts computed with the same 44 by 50 foot planning module.

  • 30x100 moves the count from 2 to 0 maintenance stations (0 across by 2 deep), which is the reason to choose between them.
  • 50x60 moves the count from 2 to 1 maintenance stations (1 across by 1 deep), which is the reason to choose between them.
  • 40x80 moves the count from 2 to 1 maintenance stations (1 across by 1 deep), which is the reason to choose between them.

Nearby footprints read for a aircraft hangar: exact change in area and in planning maintenance stations

FootprintArea Δ% ΔMaintenance stations at that footprintWhat changes for this use
60x120−300 sq ft−4%2 (1 x 2)Same maintenance station count on this planning module; the difference is circulation and stored depth, not capacity.
80x100+500 sq ft+6.7%1 (1 x 1)−1 maintenance station on the same planning module.
50x120−1,500 sq ft−20%2 (1 x 2)Same maintenance station count on this planning module; the difference is circulation and stored depth, not capacity.
60x150+1,500 sq ft+20%3 (1 x 3)+1 maintenance station on the same planning module.

Areas are arithmetic on two stored size records; maintenance station counts use this platform's 44 by 50 foot planning module and are not a capacity statement.

Because this footprint is planned as a hangar built around maintenance and inspection work rather than overnight parking, the useful next reads are different from the ones a differently shaped aircraft hangar suggests: aircraft maintenance hangar planning, parts and documentation area, extended-stay hangar layout.

Visualization

Reading the 50x150 footprint as a aircraft hangar

150′ length50′ width7,500 sq ft
50x150 footprint plan, drawn from the stored dimensional record
12′ eave18.3′ ridge3:12 pitch · 50′ clear span
Gable cross section at a 14-foot eave and 3:12 pitch, computing to a 20.3-foot ridge

FAQ

Questions about 50x150 aircraft hangar projects

Depth can grow for shop and storage space, but the opening dimension is fixed by the aircraft and cannot be traded away Practically, the 150-foot dimension is the one that extends; the 50-foot span is fixed once the frames are set.

Reserving 16 ft across the 50 ft dimension for movement leaves 34 ft of working width, which takes 1 maintenance stations at 44 ft. Along 150 ft it takes 3 runs at 50 ft. That is 3 positions out of 7,500 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on when an aircraft sits for days or weeks rather than overnight, is there somewhere for what comes off it that is not the floor around it. These are planning figures computed from the footprint, not a quoted layout.

About 1,700 square feet across the width — enough for a parts and documentation area set apart from the aircraft footprint, so removed components and paperwork have a fixed place during a long job.

Enclosure keeps small components and paperwork from migrating across the floor, at some cost to flexibility; the specific arrangement is a planning choice for the operation involved.

It depends on the aircraft's tail height and wingspan taken together, since clearing one but not the other is useless. The stored configuration computes to 20.3 feet at the ridge, but the eave is the number that governs anything standing near a wall.

Methodology

How this page was produced

Sources and methodology

Verified sourceExternal factual sources
  • Find Steel Buildings dimensional records

    Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.

  • International Building Code and International Residential Code

    International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.

Platform calculationComputed on this platform
  • Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
  • Maintenance station fit: Counts, leftover strips and per-module areas are computed from the stored 50x150 record against this platform's 44 by 50 foot planning module for the aircraft hangar category, with 16 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
  • Allocation model: Zone shares come from this platform's use typology for aircraft storage and maintenance and are applied arithmetically to the stored 150-foot length.
Planning assumptionPlanning assumptions
  • Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
  • Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.

Methodology notes

  • Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.

Drawn to scale

Plans and dimensions

Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.

Front third2,500 sq ftCenter third2,500 sq ftRear third2,500 sq ft50′ × 150′ floor plate
Computed from stored dimensions
Floor plate divided into equal thirds along the length; each area is computed from the stored footprint.Platform calculation

Continue your research

Related planning topics

Background reading on the questions this page raises. None of these pages sells anything.

Compare 50x150 aircraft hangar configurations

Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.

Get a Quote