Skip to content
Find Steel Buildings

Building Types

40x40 RV Garage

Width
40 ft
Length
40 ft
Floor area
1,600 sq ft
Perimeter
160 ft
Concept visualization of a enclosed RV garage at a representative 30 by 50 foot size; not a real project.
Example Configuration
enclosed RV garage concept visualization at a representative 30x50 size.Example configuration — for planning purposes only
Last updated Aug 27, 2026Reviewed under the Find Steel Buildings editorial standards

Get Quotes for a 40×40 RV Garage

RV Garage ✓40′ × 40′ ✓
Continue

Configuration

How This Building Is Configured

40′ length40′ width1,600 sq ft
Footprint drawn to the stated dimensions.Platform calculation

Configuration summary

Building typeRV Garage
Footprint40 ft × 40 ft
Floor area1,600 sq ft
Eave height14 ft

Example

Example Configuration

Example configuration of a 40 by 40 foot rv garage
RV Garage shown as an example configuration — for planning purposes only. Doors, colors and openings are specified for the actual project.

Quick dimensions

At a Glance

  • Width

    40 ft across the gable end.

  • Length

    40 ft along the sidewall.

  • Floor area

    1,600 sq ft of clear floor.

  • Eave height

    14 ft at the sidewall on the stored profile.

Access

Doors & Access Considerations

  • Opening width

    Across a 40 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.

  • Opening height

    A 14 ft eave sets the ceiling on door height before any frame change.

  • Drive-through

    Matching openings at both ends avoid reversing, at the cost of usable wall.

Use

How a 40×40 RV Garage May Be Used

  • Height clearance

    Interior height and door height are the deciding dimensions for tall vehicles.

  • Drive-through

    Doors at both ends avoid reversing a trailer or coach.

  • Service space

    Extra length beyond the vehicle allows for work and walk-around clearance.

  • Enclosed vs open

    Open covers and enclosed buildings suit different climates and contents.

Planning

Footprint & Space Planning

  • Footprint

    Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.

  • Height

    Eave height is commonly the governing dimension here, because clearance for the tallest item sets the door and the wall.

  • Access

    Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.

  • Doors and openings

    Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.

  • Site

    Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.

  • Expansion

    Extending along the length is usually simpler than changing the width later, which is worth deciding up front.

Similar sizes

Other Sizes for a RV Garage

Related

Related Building Types

Example configuration — for planning purposes only.

FAQ

Common Questions

40 ft × 40 ft is 1,600 square feet of floor area before any interior partitions.

Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.

Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.

Compare nearby sizes

Related footprints for this building type

Each page works through one footprint for one building type.

Overview

A 40x40 rv garage planned as shelter for one coach with nothing else expected to share the building

This page is ordered around clearance, because a recreational vehicle building is decided by the door opening and the height above the vehicle before anything else.

The 40-foot width takes 2 coach bays across, but the 40-foot length does not complete a full row once 4 feet of circulation is deducted — the depth is the binding dimension here.

Read this footprint through its span. 40 feet across is the fixed constraint; 40 feet of length is the negotiable one, and at 1 to 1 the building is close to square, so movement runs in both directions. Plan the exit as carefully as the entrance; buildings are emptied under more time pressure than they are filled.

A 40 by 40 footprint is a near-square plan: 1,600 sq ft enclosed by 160 ft of wall, at a 1:1 length-to-width proportion. Along its 40 ft dimension it takes 1 run of coach bays at 40 ft, leaving 0 ft over — the 0 ft is where the argument about this size actually happens. Taken purely as arithmetic, 40 by 40 gives 2 coach bays across the 40 ft dimension once 4 ft is reserved for movement, and 1 deep along the 40 ft dimension. Run as a shelter for one coach with nothing else expected to share the building, 8 ft across is enough to be worth planning: a walking strip down one side so the coach can be inspected without opening it up outdoors Slab thickness and any structural provision are engineered for the vehicle weights involved.

This footprint is planned as shelter for one coach with nothing else expected to share the building. At 1:1 the plan is close enough to square that neither width nor depth is doing the arguing; what decides the layout here is where the openings go, because no proportion is forcing a direction on the floor. Spent as a square 40 by 40 instead, the same 1,600 sq ft would stand 2 coach bays across rather than 2, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. At this scale the building is usually operated by one or two people who know where everything is, so the plan can be loose and the doors matter more than the divisions. The vehicle arrives, is parked, and is left. Visits are for checking and preparation rather than work, so a walkable side is the whole convenience of the building. Door hardware and track arrangement consume clearance that is easy to forget at design.

Planning assumptionPlatform calculation

Areas, perimeter, roof area, ridge height, slab volume and the coach bay counts on this page are computed from the stored 40x40 record and this platform's planning module for the rv garage category.

Height

Interior height for a 40x40 rv garage

Span drives headroom at 40x40: 40 feet of width on a 3:12 pitch puts 19 feet over the middle and 14 feet at the walls, so where a tall item stands matters as much as how tall it is. Depth is bought cheaply and width expensively, which is why this proportion tends to be argued about before anything else.

Height on a 40 ft span is a separate decision from the 40 ft length, and it is the span that sets the frame's behavior. Raising the eave over 1,600 sq ft affects every bay along the 40 ft dimension, so the test is whether single coach shelter genuinely needs the extra clear height or only the floor area.

Insulation matters if the building is worked in during cold weather, and it also affects condensation on a large stored vehicle.

Planning assumptionPlanning guidance

Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.

Footprint arithmetic

The 40x40 footprint measured for a rv garage

Computed dimensional profile of a 40x40 rv garage

MeasureComputed at this footprint
Floor area1,600 sq ft
Interior after a 2 ft wall strip36 × 36 ft (1,296 sq ft)
Proportion1 to 1
Perimeter160 ft (100 ft per 1,000 sq ft of floor)
Wall carried against a square of the same area0%
Enclosed volume26,400 cu ft at a 14 ft eave and 19 ft ridge
Roof plane against floor1,649 sq ft (+3%)
Coach bays planned2 across × 0 deep = 0
Circulation and margin100% of the footprint
Widest clear opening planned32 ft on the 40 ft gable, 6 ft in a sidewall bay
Bay division4 bays at 10 ft (exact)

Computed from the stored 40x40 record. The 2-foot wall strip, 4-foot corner margin and 4-foot pier allowance are this platform's planning conventions for reading a footprint; they are not code minimums or engineered clearances.

40 ft is under one full 40-ft rank with circulation. 1,600 sq ft plans well as two zones with the split on a frame line.

The 40-ft span holds 2 coach bays plus 12 ft — most of another position. Across only 0 ranks of depth that leaves nothing spare for racking or a bench; those go outside the coach bay positions or not at all.

40 ft divides exactly into 4 bays at 10 ft. On 1,600 sq ft that grid is what keeps racking, doors and lighting from being set out three times.

The 12 ft left across the width is most of another coach bay without being one. Given a purpose it becomes a walking strip down one side so the coach can be inspected without opening it up outdoors; left undefined it becomes the strip everything ends up in.

The 40-ft gable clears about 32 ft after corner framing — 2 module-width openings abreast. With one shallow rank the end wall is the whole access strategy.

How the 40-foot run can be divided

BaysSpacingDivisionWhat it means for the plan
410 ftExact40 divides exactly by 10, so the frame line, the sidewall openings and any interior division can all land on the same grid.
220 ftExact40 divides exactly by 20, so the frame line, the sidewall openings and any interior division can all land on the same grid.
313.3 ftNearest even division3 bays works out at 13.3 ft, because 40 does not divide by 12; the odd bay usually goes at the end that carries the door.

Bay divisions are arithmetic on the stored 40-foot length. Frame spacing for a specific building is set by the manufacturer's engineering, not by this table.

Openings

Openings for 2 coach bays across

One opening per position works on this gable: 2 across 40 feet, with 12 feet of wall to distribute as piers. Splitting that margin evenly is what keeps the elevation buildable. Height is the dimension people regret; it cannot be added later without rebuilding the frame line.

The 40 ft ends and the 40 ft sides offer very different opening budgets: 40 ft of end wall has room for one wide opening or two modest ones, while 40 ft of side wall can carry several without the openings competing. On this plan the deciding factor is whether single coach shelter or clear door opening should be the first thing reached from the door.

Planning assumptionEngineering-required

Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.

Usable area

How the 1,600 square feet divides at 40x40

Computed coach bay fit for a 40x40 rv garage

MeasureComputed at this footprint
Coach bays across the 40-foot width2 at a 14-foot module
Leftover width12 ft (480 sq ft as a full-length strip)
Rows along the 40-foot length0 at a 40-foot module after 4 ft of circulation
Leftover depth36 ft (1,440 sq ft across the width)
Total coach bays0
Share of floor committed0%

Module footprint used here is 14 by 40 feet, this platform's planning module for a rv garage. It is not a code minimum or an engineered clearance.

Example allocation of the 40-foot length — planning model, not survey data

ZoneLength along the buildingComputed area
Parking bays28.8 ft1,152 sq ft
Walk-around and door swing7.2 ft288 sq ft
Tools and seasonal storage4 ft160 sq ft

Shares applied to the stored 40-foot length; areas computed against the 40-foot width.

Planning assumptionPlanning guidance

Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.

Allocation

Dividing the floor for shelter for one coach with nothing else expected to share the building

The storage pattern this building could equally be arranged for is a coach bay with a working area kept for maintenance on the vehicle: the bench is only reachable when the coach is out, which is the same as not having one. The coach's footprint plus a walking side, with the front metres kept clear for the door and its approach.

Depth arithmetic leaves a working end zone here. 1,440 square feet sits past the last row, which is why 40x40 tends to be planned with a walking strip down one side so the coach can be inspected without opening it up outdoors designed in rather than added later. Interior divisions are the last decision that should be fixed, because they are the first one that usually changes.

Spare width is the more valuable of the two leftovers here: a continuous 12-foot strip beats the same area stranded at the end of the run, because it touches every position along the way. Utilities entering on the wrong elevation quietly rewrite the interior layout.

At 1:1 the plan is close enough to square that neither width nor depth is doing the arguing; what decides the layout here is where the openings go, because no proportion is forcing a direction on the floor. Spent as a square 40 by 40 instead, the same 1,600 sq ft would stand 2 coach bays across rather than 2, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. At this scale the building is usually operated by one or two people who know where everything is, so the plan can be loose and the doors matter more than the divisions. The vehicle arrives, is parked, and is left. Visits are for checking and preparation rather than work, so a walkable side is the whole convenience of the building. Door hardware and track arrangement consume clearance that is easy to forget at design. That movement pattern, not the 1,600-square-foot total, is what decides whether the leftover 36 feet is useful here.

Parking bays28.8 × 40 ft · 1,152 sq ftWalk-around and door swing7.2 × 40 ft · 288 sq ftTools and seasonal storage4 × 40 ft · 160 sq ft40 ft overall length
parking and circulation allocation allocation across the 40-foot length

Configurations

Configuring 1 coach bays at 40x40

Nominal bay division computes to 2 bays at about 20 feet, wider than the 14-foot module — so a position can sit inside a bay without a frame line splitting it. Insulating later is possible; framing for insulation later is much harder.

A single row means nothing is trapped: every position faces the opening directly, which is this footprint's advantage over a deeper building of the same width. Long spans buy flexibility that is only worth paying for if the operation actually changes shape.

Length first, because a coach that fits today usually has a longer successor.

Configured as shelter for one coach with nothing else expected to share the building, 40x40 is judged on whether the 0 coach bays it holds match the operation, and on whether the 12 feet of spare width leaves the route this mode depends on.

  • Does the work need three parked lanes, or two lanes and a moving lane wide enough for equipment to pass, or does it need a second lane that this 40-foot span cannot give?
  • Is the 40-foot length being bought for depth, or for the repeated bays — three or four repeated frame bays, which sets a clear grain for partitions and rack lines?
  • What is the vehicle's height with roof equipment, and what margin does the door include?
  • Does the length allow walking around the vehicle, or only parking it?
Planning assumptionTypical configuration

Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.

Cost drivers

Quantities that move the estimate at 40x40

The estimate at 40x40 moves with four computed quantities: 1,600 square feet of floor, 160 feet of perimeter, 2,240 square feet of wall and 1,649 square feet of roof. Everything else is site and specification. A wider bay is a structural decision and a longer bay is a layout decision; the two are often confused.

The tall door dominates and rises steeply with height. The frame follows the door rather than the other way round.

  • opening height and the eave height it forces
  • length including tow vehicle or towed unit
  • a hook-up point and interior power
  • the approach and apron for a long vehicle
Why we don't quote thisWe do not state 40x40 rv garage pricing here, because it varies too much to give an honest figure. Published only with a documented inclusion basis, a collection date and a named source.

Comparison

What changes at adjacent footprints

Computed comparison of nearby footprints for a rv garage

FootprintFloor areaCoach bays
20x20400 sq ft0 (1 x 0)
18x26468 sq ft0 (1 x 0)
20x24480 sq ft0 (1 x 0)
16x30480 sq ft0 (0 x 0)
23x22506 sq ft0 (1 x 0)

Areas computed from each stored size record; coach bay counts computed with the same 14 by 40 foot planning module.

  • 20x20 holds the same 0 coach bays but changes the leftover depth by -20 feet, which is where the difference is actually felt.
  • 18x26 holds the same 0 coach bays but changes the leftover depth by -22 feet, which is where the difference is actually felt.
  • 20x24 holds the same 0 coach bays but changes the leftover depth by -24 feet, which is where the difference is actually felt.

Nearby footprints read for a rv garage: exact change in area and in planning coach bays

FootprintArea Δ% ΔCoach bays at that footprintWhat changes for this use
30x50−100 sq ft−6.2%0 (2 x 0)Same coach bay count on this planning module; the difference is circulation and stored depth, not capacity.
36x48+128 sq ft+8%2 (2 x 1)+2 coach bays on the same planning module.
36x40−160 sq ft−10%0 (2 x 0)Same coach bay count on this planning module; the difference is circulation and stored depth, not capacity.
40x50+400 sq ft+25%0 (2 x 0)Same coach bay count on this planning module; the difference is circulation and stored depth, not capacity.

Areas are arithmetic on two stored size records; coach bay counts use this platform's 14 by 40 foot planning module and are not a capacity statement.

Because this footprint is planned as shelter for one coach with nothing else expected to share the building, the useful next reads are different from the ones a differently shaped rv garage suggests: single coach shelter, clear door opening, walkable side.

Visualization

Reading the 40x40 footprint as a rv garage

40′ length40′ width1,600 sq ft
40x40 footprint plan, drawn from the stored dimensional record
14′ eave19′ ridge3:12 pitch · 40′ clear span
Gable cross section at a 14-foot eave and 3:12 pitch, computing to a 19-foot ridge

FAQ

Questions about 40x40 rv garage projects

Take 2 ft off each wall as a working strip and the plan area drops from 1,600 to about 1,296 sq ft across 36 by 36 ft. Against that, 2 by 0 coach bays occupy 0 sq ft and roughly 100% of the footprint stays as movement and margin. That circulation share is the number worth arguing about; the headline area is not.

The 40-ft gable takes an opening of about 32 ft clear after corner framing — 2 module-width openings. The 40-ft sidewall takes up to 2 spaced with piers, and those piers sit naturally on the 4-bay grid at 10 ft. Openings are planning geometry here; the sizes a specific building can actually carry come from the manufacturer's engineering for that frame.

One more bay at 10 ft adds 400 sq ft, 25% more floor, and keeps the clean division. It buys depth, not span: if the constraint is fitting things side by side, extra length does not solve it.

About 1,440 square feet across the width — enough for a walking strip down one side so the coach can be inspected without opening it up outdoors.

Reserving 4 ft across the 40 ft dimension for movement leaves 36 ft of working width, which takes 2 coach bays at 14 ft. Along 40 ft it takes 1 runs at 40 ft. That is 2 positions out of 1,600 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on can somebody walk the full length of the coach inside the building, or only look at the end of it. These are planning figures computed from the footprint, not a quoted layout.

It depends on the RV height with roof-mounted equipment, plus the margin needed to drive in without watching a mirror all the way. The stored configuration computes to 19 feet at the ridge, but the eave is the number that governs anything standing near a wall.

From the vehicle's total height including air conditioners and antennas, checked against the door's clear opening rather than its nominal size, with the door hardware's own take-up allowed for.

The 40-foot width takes 2 coach bays across, but the 40-foot length does not complete a full row once 4 feet of circulation is deducted — the depth is the binding dimension here. Those counts use a 14 by 40 foot planning module with 4 feet allowed for circulation, so a different module changes the answer.

Methodology

How this page was produced

Sources and methodology

Verified sourceExternal factual sources
  • Find Steel Buildings dimensional records

    Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.

  • International Building Code and International Residential Code

    International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.

Platform calculationComputed on this platform
  • Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
  • Coach bay fit: Counts, leftover strips and per-module areas are computed from the stored 40x40 record against this platform's 14 by 40 foot planning module for the rv garage category, with 4 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
  • Allocation model: Zone shares come from this platform's use typology for vehicle shelter and parking and are applied arithmetically to the stored 40-foot length.
Planning assumptionPlanning assumptions
  • Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
  • Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.

Methodology notes

  • Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.

Drawn to scale

Plans and dimensions

Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.

40′ length40′ width1,600 sq ft
Computed from stored dimensions
Footprint plan — 40′ × 40′, drawn to the stored dimensions.Platform calculation
Front third533 sq ftCenter third533 sq ftRear third533 sq ft40′ × 40′ floor plate
Computed from stored dimensions
Floor plate divided into equal thirds along the length; each area is computed from the stored footprint.Platform calculation

Continue your research

Related planning topics

Background reading on the questions this page raises. None of these pages sells anything.

Compare 40x40 rv garage configurations

Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.

Get a Quote