Building Types
80x150 Industrial Steel Building
- Width
- 80 ft
- Length
- 150 ft
- Floor area
- 12,000 sq ft
- Perimeter
- 460 ft

Quick dimensions
At a Glance
Width
80 ft across the gable end.
Length
150 ft along the sidewall.
Floor area
12,000 sq ft of clear floor.
Eave height
24 ft at the sidewall on the stored profile.
Configuration
How This Building Is Configured
Configuration summary
| Building type | Industrial Building |
|---|---|
| Footprint | 80 ft × 150 ft |
| Floor area | 12,000 sq ft |
| Eave height | 24 ft |
Planning
Footprint & Space Planning
Footprint
Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.
Height
Eave height is commonly the governing dimension here, because clearance for the tallest item sets the door and the wall.
Access
Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.
Doors and openings
Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.
Site
Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.
Expansion
Extending along the length is usually simpler than changing the width later, which is worth deciding up front.
Use
How a 80×150 Industrial Building May Be Used
Production or storage flow
Material entering one end and leaving the other is a common organising principle.
Loading access
Dock or grade-level door placement is usually decided before the frame layout.
Racking and clear height
Usable stacking height depends on eave height and any interior structure.
Equipment and services
Power, compressed air and lighting layouts follow the bay spacing.
Example
Example Configuration

Access
Doors & Access Considerations
Opening width
Across a 80 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.
Opening height
A 24 ft eave sets the ceiling on door height before any frame change.
Drive-through
Matching openings at both ends avoid reversing, at the cost of usable wall.
Similar sizes
Other Sizes for a Industrial Building
80′ × 130′
10,400 sq ft
80′ × 170′
13,600 sq ft
70′ × 150′
10,500 sq ft
Related
Related Building Types

Warehouse
Explore
Manufacturing Building
Explore
Distribution Center
Explore
Commercial Building
Explore
Example configuration — for planning purposes only.
FAQ
Common Questions
80 ft × 150 ft is 12,000 square feet of floor area before any interior partitions.
Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.
Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.
Compare nearby sizes
Related footprints for this building type
Each page works through one footprint for one building type.
Overview
A 80x150 industrial building planned as a single serviced work floor operated by one occupier
This page is ordered around division, because a shell of this size is as likely to hold two or three occupiers as one, and frontage rather than area is what makes that possible.
The footprint holds 9 serviced bays — 3 across by 3 deep — and leaves 16 feet of depth for a services and welfare strip along one wall, carrying the panel, compressed air, the tool store and the room people actually take breaks in.
Commitment first: 75% of the 12,000 square feet goes to serviced bays at 1000 square feet each, and 2,030 square feet survives as edge strip. A footprint is worth its own decision when that split lands where the work does. Ground conditions and drainage decide the floor before the frame does.
A 80 by 150 footprint is a clearly directional plan: 12,000 sq ft enclosed by 460 ft of wall, at a 1.9:1 length-to-width proportion. Along its 150 ft dimension it takes 3 runs of serviced bays at 40 ft, leaving 30 ft over — the 30 ft is where the argument about this size actually happens. Taken purely as arithmetic, 80 by 150 gives 2 serviced bays across the 80 ft dimension once 14 ft is reserved for movement, and 3 deep along the 150 ft dimension. Run as a a single serviced work floor operated by one occupier, 16 ft across is enough to be worth planning: a services and welfare strip along one wall, carrying the panel, compressed air, the tool store and the room people actually take breaks in Lighting layout follows work positions rather than the structural grid, and designing it to the grid produces shadowed benches.
At 80x150 the operating question is a specific one: does this footprint carry a serviced working floor with its utilities and welfare on the side, or a bare floor with both taken out of it? That is a different question from the one a industrial building of another shape has to answer, and it is why this footprint is planned as a single serviced work floor operated by one occupier rather than as generic covered area.
Areas, perimeter, roof area, ridge height, slab volume and the serviced bay counts on this page are computed from the stored 80x150 record and this platform's planning module for the industrial building category.
Configurations
Configuring 9 serviced bays at 80x150
At 25-foot nominal bays the structure works with the layout instead of against it: one serviced bay per bay line, walls free of awkward half-positions. A leftover strip earns its place only when something is deliberately put in it; otherwise it is circulation with a nicer name.
Two-plus rows change the access question entirely. Every rear position at 80x150 needs either its own opening or an aisle, and 5 feet of spare width is what that aisle has to come from. The corner nobody plans for is the one that fills first, which is an argument for planning it.
A single-occupier floor grows by extending away from the service wall, so the service wall should be the one that is never intended to move.
Configured as a single serviced work floor operated by one occupier, 80x150 is judged on whether the 9 serviced bays it holds match the operation, and on whether the 5 feet of spare width leaves the route this mode depends on.
- Does the work need racking or work zones on both sides with a full vehicle lane down the middle, or does it need a second lane that this 80-foot span cannot give?
- Is the 150-foot length being bought for depth, or for the repeated bays — a long repeating bay sequence, so segment boundaries are set by bay lines rather than by walls?
- What direction does material flow, and are the openings at the right ends?
- Is overhead handling planned, and has that been raised as an engineering requirement?
Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.
Openings
Openings for 3 serviced bays across
The 80-foot gable can carry 3 openings, one per serviced bay, with 5 feet of wall left for piers between and beside them — the arrangement that keeps each position independently reachable. Plan the exit as carefully as the entrance; buildings are emptied under more time pressure than they are filled.
The 80 ft ends and the 150 ft sides offer very different opening budgets: 80 ft of end wall has room for one wide opening or two modest ones, while 150 ft of side wall can carry several without the openings competing. On this plan the deciding factor is whether serviced industrial floor or service wall planning should be the first thing reached from the door.
Handling at fixed points matched to the flow, so a door in the wrong place turns into a permanent double handling cost.
Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.
Allocation
Dividing the floor for a single serviced work floor operated by one occupier
The servicing pattern this shell could equally be operated under is a building whose operation is governed by the yard that serves it: there is no staging depth, so loads are handled twice — once off the vehicle and once out of the way of the next one. Dividing the 12,000 sq ft by the 25 by 40 ft serviced bay gives roughly 6 positions before circulation is deducted a second time for cross movement. Whether the plan keeps 6 or drops to 3 comes back to the question this footprint is really answering: does this footprint carry a serviced working floor with its utilities and welfare on the side, or a bare floor with both taken out of it?
Depth arithmetic leaves a working end zone here. 1,280 square feet sits past the last row, which is why 80x150 tends to be planned with a services and welfare strip along one wall, carrying the panel, compressed air, the tool store and the room people actually take breaks in designed in rather than added later. Neighbouring buildings, setbacks and the approach road often decide the orientation before the plan does.
Spare width is the more valuable of the two leftovers here: a continuous 5-foot strip beats the same area stranded at the end of the run, because it touches every position along the way. The plan should survive the day the largest item the operation owns has to come inside.
Compared with a 80 by 110 of the same width, the extra depth here adds run rather than reach: it buys about 3 serviced bays in line, and every position past the second is retrieved by moving what stands in front of it. Spent as a square 110 by 110 instead, the same 12,000 sq ft would stand 3 serviced bays across rather than 2, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. A building of this size behaves like a small yard under a roof: zones need to be defined, signed and left alone, or they migrate. Material arrives at the yard door, is worked somewhere in the middle and leaves the way it came. That single-route pattern is efficient at this scale and becomes the constraint the moment a second activity needs the same door. The yard usually decides more about an industrial building's performance than the interior layout does. That movement pattern, not the 12,000-square-foot total, is what decides whether the leftover 16 feet is useful here.
Usable area
How the 12,000 square feet divides at 80x150
Computed serviced bay fit for a 80x150 industrial building
| Measure | Computed at this footprint |
|---|---|
| Serviced bays across the 80-foot width | 3 at a 25-foot module |
| Leftover width | 5 ft (750 sq ft as a full-length strip) |
| Rows along the 150-foot length | 3 at a 40-foot module after 14 ft of circulation |
| Leftover depth | 16 ft (1,280 sq ft across the width) |
| Total serviced bays | 9 |
| Share of floor committed | 75% |
Module footprint used here is 25 by 40 feet, this platform's planning module for a industrial building. It is not a code minimum or an engineered clearance.
Example allocation of the 150-foot length — planning model, not survey data
| Zone | Length along the building | Computed area |
|---|---|---|
| Production floor | 82.5 ft | 6,600 sq ft |
| Material handling and staging | 42 ft | 3,360 sq ft |
| Support, office and utility | 25.5 ft | 2,040 sq ft |
Shares applied to the stored 150-foot length; areas computed against the 80-foot width.
Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.
Cost drivers
Quantities that move the estimate at 80x150
Quantities, not prices, are publishable here: roof cladding runs 12,649 square feet — 5% above the 12,000-square-foot floor at a 4:12 pitch — with 222.2 cubic yards of nominal slab beneath it. Interior divisions are the last decision that should be fixed, because they are the first one that usually changes.
The shell dominates the estimate at this scale, but the fit-out items that make the floor usable — distribution, lighting, the slab specification, the apron outside the door — are what separate two otherwise identical buildings.
- clear height for plant and handling
- power capacity and distribution to plant positions
- slab requirements under fixed equipment, which are an engineering item
- opening positions at the flow ends
Height
Interior height for a 80x150 industrial building
Span drives headroom at 80x150: 80 feet of width on a 4:12 pitch puts 37.3 feet over the middle and 24 feet at the walls, so where a tall item stands matters as much as how tall it is. What the building holds in its busiest week is the honest brief; the rest of the year is slack.
Height on a 80 ft span is a separate decision from the 150 ft length, and it is the span that sets the frame's behavior. Raising the eave over 12,000 sq ft affects every bay along the 150 ft dimension, so the test is whether serviced industrial floor genuinely needs the extra clear height or only the floor area.
Ventilation across 12,000 square feet at this height: process air is a design requirement rather than general comfort ventilation.
Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.
Comparison
What changes at adjacent footprints
Computed comparison of nearby footprints for a industrial building
| Footprint | Floor area | Serviced bays |
|---|---|---|
| 60x80 | 4,800 sq ft | 2 (2 x 1) |
| 40x120 | 4,800 sq ft | 1 (1 x 1) |
| 50x100 | 5,000 sq ft | 4 (2 x 2) |
| 60x100 | 6,000 sq ft | 2 (2 x 1) |
| 50x120 | 6,000 sq ft | 2 (2 x 1) |
Areas computed from each stored size record; serviced bay counts computed with the same 25 by 40 foot planning module.
- 60x80 moves the count from 9 to 2 serviced bays (2 across by 1 deep), which is the reason to choose between them.
- 40x120 moves the count from 9 to 1 serviced bays (1 across by 1 deep), which is the reason to choose between them.
- 50x100 moves the count from 9 to 4 serviced bays (2 across by 2 deep), which is the reason to choose between them.
Nearby footprints read for a industrial building: exact change in area and in planning serviced bays
| Footprint | Area Δ | % Δ | Serviced bays at that footprint | What changes for this use |
|---|---|---|---|---|
| 100x100 | −2,000 sq ft | −16.7% | 3 (3 x 1) | −6 serviced bays on the same planning module. |
| 80x120 | −2,400 sq ft | −20% | 4 (2 x 2) | −5 serviced bays on the same planning module. |
| 100x150 | +3,000 sq ft | +25% | 12 (4 x 3) | +3 serviced bays on the same planning module. |
| 60x150 | −3,000 sq ft | −25% | 4 (2 x 2) | −5 serviced bays on the same planning module. |
Areas are arithmetic on two stored size records; serviced bay counts use this platform's 25 by 40 foot planning module and are not a capacity statement.
Because this footprint is planned as a single serviced work floor operated by one occupier, the useful next reads are different from the ones a differently shaped industrial building suggests: serviced industrial floor, service wall planning, single-occupier industrial layout.
Visualization
Reading the 80x150 footprint as a industrial building
FAQ
Questions about 80x150 industrial building projects
The footprint holds 9 serviced bays — 3 across by 3 deep — and leaves 16 feet of depth for a services and welfare strip along one wall, carrying the panel, compressed air, the tool store and the room people actually take breaks in. Those counts use a 25 by 40 foot planning module with 14 feet allowed for circulation, so a different module changes the answer.
Reserving 14 ft across the 80 ft dimension for movement leaves 66 ft of working width, which takes 2 serviced bays at 25 ft. Along 150 ft it takes 3 runs at 40 ft. That is 6 positions out of 12,000 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on does this footprint carry a serviced working floor with its utilities and welfare on the side, or a bare floor with both taken out of it. These are planning figures computed from the footprint, not a quoted layout.
A 6-inch slab across 12,000 square feet computes to 222.2 cubic yards before thickened edges, piers or waste. The final design comes from the foundation engineer.
Inside the shell it takes working floor; attached it costs envelope. The judgement is usually settled by whether the floor is at a premium, and any occupancy or separation provision is determined for the specific building.
11,040 square feet of wall and 12,649 square feet of roof at a 4:12 pitch — the roof exceeding the floor by 5%.
Methodology
How this page was produced
Sources and methodology
Find Steel Buildings dimensional records
Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering
Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.
International Building Code and International Residential Code
International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering
Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.
- Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
- Serviced bay fit: Counts, leftover strips and per-module areas are computed from the stored 80x150 record against this platform's 25 by 40 foot planning module for the industrial building category, with 14 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
- Allocation model: Zone shares come from this platform's use typology for production and industrial operations and are applied arithmetically to the stored 150-foot length.
- Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
- Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.
Methodology notes
- Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.
Drawn to scale
Plans and dimensions
Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.
Compare 80x150 industrial building configurations
Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.
