Skip to content
Find Steel Buildings

Building Types

120x150 Steel Gymnasium Building

Width
120 ft
Length
150 ft
Floor area
18,000 sq ft
Perimeter
540 ft
Concept visualization of a steel gymnasium at a representative 90 by 150 foot size; not a real project.
Example Configuration
steel gymnasium concept visualization at a representative 90x150 size.Example configuration — for planning purposes only
Last updated Aug 27, 2026Reviewed under the Find Steel Buildings editorial standards

Quick dimensions

At a Glance

  • Width

    120 ft across the gable end.

  • Length

    150 ft along the sidewall.

  • Floor area

    18,000 sq ft of clear floor.

  • Eave height

    14 ft at the sidewall on the stored profile.

Get Quotes for a 120×150 Steel Gymnasium

Steel Gymnasium ✓120′ × 150′ ✓
Continue

Configuration

How This Building Is Configured

150′ length120′ width18,000 sq ft
Footprint drawn to the stated dimensions.Platform calculation

Configuration summary

Building typeSteel Gymnasium
Footprint120 ft × 150 ft
Floor area18,000 sq ft
Eave height14 ft

Planning

Footprint & Space Planning

  • Footprint

    Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.

  • Height

    Eave height affects door options, storage height and how open the interior feels.

  • Access

    Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.

  • Doors and openings

    Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.

  • Site

    Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.

  • Expansion

    Extending along the length is usually simpler than changing the width later, which is worth deciding up front.

Use

How a 120×150 Steel Gymnasium May Be Used

  • Assembly space

    Clear-span width determines how the main space can be arranged and seated.

  • Support rooms

    Ancillary rooms are commonly placed along one side or at one end.

  • Access and egress

    Entrance and exit placement follows the occupancy requirements for the use.

  • Acoustics and finish

    Interior treatment is specified with the intended activity in mind.

Example

Example Configuration

Example configuration of a 120 by 150 foot steel gymnasium
Steel Gymnasium shown as an example configuration — for planning purposes only. Doors, colors and openings are specified for the actual project.

Access

Doors & Access Considerations

  • Opening width

    Across a 120 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.

  • Opening height

    A 14 ft eave sets the ceiling on door height before any frame change.

  • Drive-through

    Matching openings at both ends avoid reversing, at the cost of usable wall.

Similar sizes

Other Sizes for a Steel Gymnasium

  • 130′ length120′ width15,600 sq ft

    120′ × 130′

    15,600 sq ft

  • 170′ length120′ width20,400 sq ft

    120′ × 170′

    20,400 sq ft

  • 150′ length110′ width16,500 sq ft

    110′ × 150′

    16,500 sq ft

Related

Related Building Types

FAQ

Common Questions

120 ft × 150 ft is 18,000 square feet of floor area before any interior partitions.

Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.

Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.

Compare nearby sizes

Related footprints for this building type

Each page works through one footprint for one building type.

Overview

A 120x150 steel gymnasium planned as an activity floor with a support wing of changing, storage and staff rooms

This page is ordered around the working arrangement, because the 150-foot depth at 120x150 is what gives a steel gymnasium its usable sequence of zones.

The footprint holds 20 support rooms — 5 across by 4 deep — and leaves 16 feet of depth for a wide equipment store opening directly onto the floor, which is what stops equipment living in the corners.

What distinguishes 120x150 is depth behaviour: 4 rows along 150 feet after 14 feet of circulation, with 16 feet unaccounted for at the end of the run. Service routes are cheap to plan now and expensive to retrofit through a finished shell.

A 120 by 150 footprint is a mildly directional plan: 18,000 sq ft enclosed by 540 ft of wall, at a 1.3:1 length-to-width proportion. Along its 150 ft dimension it takes 5 runs of support rooms at 30 ft, leaving 0 ft over — the 0 ft is where the argument about this size actually happens. A floor without changing rooms, staff space and real equipment storage is used at a fraction of its capacity. This mode treats the support wing as the subject, because the wing is what is cut first and missed most. Doors that swing into an activity area remove floor for the whole session.

At 120x150 the operating question is a specific one: how much of the footprint should be given to rooms that make the floor usable rather than to the floor itself? That is a different question from the one a steel gymnasium of another shape has to answer, and it is why this footprint is planned as an activity floor with a support wing of changing, storage and staff rooms rather than as generic covered area.

Planning assumptionPlatform calculation

Areas, perimeter, roof area, ridge height, slab volume and the support room counts on this page are computed from the stored 120x150 record and this platform's planning module for the steel gymnasium category.

Configurations

Configuring 20 support rooms at 120x150

Nominal bay division computes to 6 bays at about 25 feet, wider than the 22-foot module — so a position can sit inside a bay without a frame line splitting it. A building that cannot be reversed out of is a building that gets used in one direction only.

Depth here creates a hierarchy: 4 rows means front positions get used and rear positions get filled. Deciding which is which up front is what keeps 120x150 workable. Noise from this floor reaches the office, the neighbours and the yard, and separation is a plan decision.

Extension is cheapest along the 150 ft dimension, where each added bay repeats work already framed; widening past 120 ft is a different frame rather than a longer one. Growing to 120 by 180 adds a 6th run of support rooms — useful if the constraint is support rooms rather than the 0 ft already spare at the far end.

Configured as an activity floor with a support wing of changing, storage and staff rooms, 120x150 is judged on whether the 20 support rooms it holds match the operation, and on whether the 10 feet of spare width leaves the route this mode depends on.

  • Does the work need an interior street with independent zones on both sides and turning room at each end, or does it need a second lane that this 120-foot span cannot give?
  • Is the 150-foot length being bought for depth, or for the repeated bays — a long repeating bay sequence, so segment boundaries are set by bay lines rather than by walls?
  • What clear height does the activity need, measured to the lowest obstruction?
  • Are the run-off margins protected from storage and seating?
Planning assumptionTypical configuration

Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.

Usable area

How the 18,000 square feet divides at 120x150

Computed support room fit for a 120x150 steel gymnasium

MeasureComputed at this footprint
Support rooms across the 120-foot width5 at a 22-foot module
Leftover width10 ft (1,500 sq ft as a full-length strip)
Rows along the 150-foot length4 at a 30-foot module after 14 ft of circulation
Leftover depth16 ft (1,920 sq ft across the width)
Total support rooms20
Share of floor committed73%

Module footprint used here is 22 by 30 feet, this platform's planning module for a steel gymnasium. It is not a code minimum or an engineered clearance.

Example allocation of the 150-foot length — planning model, not survey data

ZoneLength along the buildingComputed area
Main assembly area93 ft11,160 sq ft
Circulation and entry30 ft3,600 sq ft
Support rooms and utility27 ft3,240 sq ft

Shares applied to the stored 150-foot length; areas computed against the 120-foot width.

Planning assumptionPlanning guidance

Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.

Allocation

Dividing the floor for an activity floor with a support wing of changing, storage and staff rooms

The activity pattern this floor could equally be planned around is a practice floor kept clear for training rather than for fixtures: there is no perimeter strip, so bags and equipment sit on the playing surface and the usable floor shrinks by more than the strip would have cost. The wing takes one end and the floor takes the rest, with the store placed where equipment is used rather than where the plan had space left. Support rooms distributed around the perimeter cost more wall than they are worth.

The 16-foot leftover depth is 1,920 square feet across the full width — deep enough to plan deliberately, and at this footprint it goes to a wide equipment store opening directly onto the floor, which is what stops equipment living in the corners. Every foot of width added multiplies through the roof and the frame; every foot of length mostly adds skin.

The 10 feet of spare width runs the whole 150-foot length — 1,500 square feet of wall strip. It earns its keep as shelving, staging or a walking route, not as another support room. Cleaning, maintenance and inspection all need reach, and reach is planned in the gaps rather than in the modules.

The longest internal travel on a 120 by 150 plan is about 192 ft corner to corner, and the shortest useful one is the 120 ft cross-run. For a an activity floor with a support wing of changing, storage and staff rooms that matters where support wing planning sits, because shortening the 120 ft run to serve it lengthens every trip along the 150 ft dimension. Changing and sanitary provision is where the per-square-foot cost of this building type concentrates. That movement pattern, not the 18,000-square-foot total, is what decides whether the leftover 16 feet is useful here.

Main assembly area93 × 120 ft · 11,160 sq ftCirculation and entry30 × 120 ft · 3,600 sq ftSupport rooms and utility27 × 120 ft · 3,240 sq ft150 ft overall length
assembly and support allocation allocation across the 150-foot length

Height

Interior height for a 120x150 steel gymnasium

The stored configuration carries a 14-foot eave and computes to 29 feet at the ridge on a 3:12 pitch — a 15-foot rise across 120 feet. Height is therefore not uniform, and the sidewall is the constraint. Temperature swing on a steel shell drives condensation decisions that outrank most layout preferences.

The wing does not need the floor's height and shares the frame, so planning a flat ceiling over the rooms gives somewhere for services and keeps them from feeling like partitions in a hall.

Ventilation across 18,000 square feet at this height: an intensively occupied volume with high activity levels, where air handling is planned for the occupied peak.

Planning assumptionPlanning guidance

Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.

Openings

Openings for 5 support rooms across

The 120-foot gable can carry 5 openings, one per support room, with 10 feet of wall left for piers between and beside them — the arrangement that keeps each position independently reachable. The count of working positions, not the headline area, is the figure that survives contact with the operation.

The 120 ft ends and the 150 ft sides offer very different opening budgets: 120 ft of end wall has room for one wide opening or two modest ones, while 150 ft of side wall can carry several without the openings competing. On this plan the deciding factor is whether support wing planning or equipment store sizing should be the first thing reached from the door.

Planning assumptionEngineering-required

Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.

Comparison

What changes at adjacent footprints

Computed comparison of nearby footprints for a steel gymnasium

FootprintFloor areaSupport rooms
60x1207,200 sq ft2 (1 x 2)
50x1507,500 sq ft4 (1 x 4)
80x1008,000 sq ft2 (2 x 1)
60x1509,000 sq ft3 (1 x 3)
80x1209,600 sq ft4 (2 x 2)

Areas computed from each stored size record; support room counts computed with the same 22 by 30 foot planning module.

  • 60x120 moves the count from 20 to 2 support rooms (1 across by 2 deep), which is the reason to choose between them.
  • 50x150 moves the count from 20 to 4 support rooms (1 across by 4 deep), which is the reason to choose between them.
  • 80x100 moves the count from 20 to 2 support rooms (2 across by 1 deep), which is the reason to choose between them.

Nearby footprints read for a steel gymnasium: exact change in area and in planning support rooms

FootprintArea Δ% ΔSupport rooms at that footprintWhat changes for this use
100x200+2,000 sq ft+11.1%12 (3 x 4)−8 support rooms on the same planning module.
80x200−2,000 sq ft−11.1%6 (2 x 3)−14 support rooms on the same planning module.
100x150−3,000 sq ft−16.7%4 (2 x 2)−16 support rooms on the same planning module.
120x200+6,000 sq ft+33.3%9 (3 x 3)−11 support rooms on the same planning module.

Areas are arithmetic on two stored size records; support room counts use this platform's 22 by 30 foot planning module and are not a capacity statement.

Because this footprint is planned as an activity floor with a support wing of changing, storage and staff rooms, the useful next reads are different from the ones a differently shaped steel gymnasium suggests: support wing planning, equipment store sizing, changing room planning.

Visualization

Reading the 120x150 footprint as a steel gymnasium

150′ length120′ width18,000 sq ft
120x150 footprint plan, drawn from the stored dimensional record
12′ eave27′ ridge3:12 pitch · 120′ clear span
Gable cross section at a 14-foot eave and 3:12 pitch, computing to a 29-foot ridge

FAQ

Questions about 120x150 steel gymnasium projects

A 4-inch slab across 18,000 square feet computes to 222.2 cubic yards before thickened edges, piers or waste. The final design comes from the foundation engineer.

Reserving 14 ft across the 120 ft dimension for movement leaves 106 ft of working width, which takes 4 support rooms at 22 ft. Along 150 ft it takes 5 runs at 30 ft. That is 20 positions out of 18,000 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on how much of the footprint should be given to rooms that make the floor usable rather than to the floor itself. These are planning figures computed from the footprint, not a quoted layout.

7,560 square feet of wall and 18,554 square feet of roof at a 3:12 pitch — the roof exceeding the floor by 3%.

More than is usually drawn, and with a wide opening. The test is whether every item used on the floor can be put away without dismantling it.

The width leaves 10 feet spare after 5 support rooms. That margin absorbs wall storage and passing room. Width is the dimension that cannot be extended later.

Methodology

How this page was produced

Sources and methodology

Verified sourceExternal factual sources
  • Find Steel Buildings dimensional records

    Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.

  • International Building Code and International Residential Code

    International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.

Platform calculationComputed on this platform
  • Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
  • Support room fit: Counts, leftover strips and per-module areas are computed from the stored 120x150 record against this platform's 22 by 30 foot planning module for the steel gymnasium category, with 14 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
  • Allocation model: Zone shares come from this platform's use typology for assembly and gathering space and are applied arithmetically to the stored 150-foot length.
Planning assumptionPlanning assumptions
  • Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
  • Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.

Methodology notes

  • Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.

Cost drivers

Quantities that move the estimate at 120x150

No price appears on this page. The quantities that scale an estimate at 120x150 are 18,000 square feet of slab, 222.2 cubic yards of nominal concrete, 7,560 square feet of wall cladding and 18,554 square feet of roof cladding. Access, not area, is what makes a plan feel small once it is in use.

Changing rooms carry plumbing, drainage, ventilation and finishes, and per square foot they are the most expensive part of the building by a wide margin.

  • clear height above the playing surface
  • the clear span across the court and its run-off
  • the support wing with changing rooms
  • impact-resistant lighting and interior surfaces
Why we don't quote thisWe do not state 120x150 steel gymnasium pricing here, because it varies too much to give an honest figure. Published only with a documented inclusion basis, a collection date and a named source.

Drawn to scale

Plans and dimensions

Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.

150′ length120′ width18,000 sq ft
Computed from stored dimensions
Footprint plan — 120′ × 150′, drawn to the stored dimensions.Platform calculation
Front third6,000 sq ftCenter third6,000 sq ftRear third6,000 sq ft120′ × 150′ floor plate
Computed from stored dimensions
Floor plate divided into equal thirds along the length; each area is computed from the stored footprint.Platform calculation

Continue your research

Related planning topics

Background reading on the questions this page raises. None of these pages sells anything.

Compare 120x150 steel gymnasium configurations

Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.

Get a Quote