Skip to content
Find Steel Buildings

Building Types

80x150 Steel Gymnasium Building

Width
80 ft
Length
150 ft
Floor area
12,000 sq ft
Perimeter
460 ft
Concept visualization of a steel gymnasium at a representative 90 by 150 foot size; not a real project.
Example Configuration
steel gymnasium concept visualization at a representative 90x150 size.Example configuration — for planning purposes only
Last updated Aug 27, 2026Reviewed under the Find Steel Buildings editorial standards

Quick dimensions

At a Glance

  • Width

    80 ft across the gable end.

  • Length

    150 ft along the sidewall.

  • Floor area

    12,000 sq ft of clear floor.

  • Eave height

    24 ft at the sidewall on the stored profile.

Get Quotes for a 80×150 Steel Gymnasium

Steel Gymnasium ✓80′ × 150′ ✓
Continue

Configuration

How This Building Is Configured

150′ length80′ width12,000 sq ft
Footprint drawn to the stated dimensions.Platform calculation

Configuration summary

Building typeSteel Gymnasium
Footprint80 ft × 150 ft
Floor area12,000 sq ft
Eave height24 ft

Planning

Footprint & Space Planning

  • Footprint

    Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.

  • Height

    Eave height affects door options, storage height and how open the interior feels.

  • Access

    Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.

  • Doors and openings

    Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.

  • Site

    Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.

  • Expansion

    Extending along the length is usually simpler than changing the width later, which is worth deciding up front.

Use

How a 80×150 Steel Gymnasium May Be Used

  • Assembly space

    Clear-span width determines how the main space can be arranged and seated.

  • Support rooms

    Ancillary rooms are commonly placed along one side or at one end.

  • Access and egress

    Entrance and exit placement follows the occupancy requirements for the use.

  • Acoustics and finish

    Interior treatment is specified with the intended activity in mind.

Example

Example Configuration

Example configuration of a 80 by 150 foot steel gymnasium
Steel Gymnasium shown as an example configuration — for planning purposes only. Doors, colors and openings are specified for the actual project.

Access

Doors & Access Considerations

  • Opening width

    Across a 80 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.

  • Opening height

    A 24 ft eave sets the ceiling on door height before any frame change.

  • Drive-through

    Matching openings at both ends avoid reversing, at the cost of usable wall.

Similar sizes

Other Sizes for a Steel Gymnasium

  • 130′ length80′ width10,400 sq ft

    80′ × 130′

    10,400 sq ft

  • 170′ length80′ width13,600 sq ft

    80′ × 170′

    13,600 sq ft

  • 150′ length70′ width10,500 sq ft

    70′ × 150′

    10,500 sq ft

Related

Related Building Types

FAQ

Common Questions

80 ft × 150 ft is 12,000 square feet of floor area before any interior partitions.

Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.

Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.

Compare nearby sizes

Related footprints for this building type

Each page works through one footprint for one building type.

Overview

A 80x150 steel gymnasium planned as a divisible floor carrying more than one activity at once

This page is ordered around the working arrangement, because the 150-foot depth at 80x150 is what gives a steel gymnasium its usable sequence of zones.

The footprint holds 6 divided bays — 2 across by 3 deep — and leaves 14 feet of depth for a cross-aisle at one end so a group can reach its own bay without crossing another one in use.

What distinguishes 80x150 is depth behaviour: 3 rows along 150 feet after 16 feet of circulation, with 14 feet unaccounted for at the end of the run. Service routes are cheap to plan now and expensive to retrofit through a finished shell.

A 80 by 150 footprint is a clearly directional plan: 12,000 sq ft enclosed by 460 ft of wall, at a 1.9:1 length-to-width proportion. Along its 150 ft dimension it takes 3 runs of divided bays at 40 ft, leaving 30 ft over — the 30 ft is where the argument about this size actually happens. Taken purely as arithmetic, 80 by 150 gives 2 divided bays across the 80 ft dimension once 16 ft is reserved for movement, and 3 deep along the 150 ft dimension. Run as a a divisible floor carrying more than one activity at once, 4 ft across is below the 12 ft this use needs to be worth planning, so there is no cross-aisle, so late arrivals walk through whichever activity is nearest the door Court and run-off dimensions for a given activity are set by the governing body concerned and confirmed for the specific building.

At 80x150 the operating question is a specific one: how are two or three simultaneous activities separated without any of them losing usable width? That is a different question from the one a steel gymnasium of another shape has to answer, and it is why this footprint is planned as a divisible floor carrying more than one activity at once rather than as generic covered area.

Planning assumptionPlatform calculation

Areas, perimeter, roof area, ridge height, slab volume and the divided bay counts on this page are computed from the stored 80x150 record and this platform's planning module for the steel gymnasium category.

Configurations

Configuring 6 divided bays at 80x150

The columns win at this footprint: 25-foot nominal bays against a 30-foot module means every layout decision starts from where the frames fall. A building that cannot be reversed out of is a building that gets used in one direction only.

With 3 rows deep, the rear row is behind the front one. Without a route past it, those divided bays become storage positions rather than working ones — the real cost of depth at this width. Noise from this floor reaches the office, the neighbours and the yard, and separation is a plan decision.

Growth adds a bay in the direction of division. Extending in the other direction lengthens every bay instead of adding one, which is rarely what was wanted.

Configured as a divisible floor carrying more than one activity at once, 80x150 is judged on whether the 6 divided bays it holds match the operation, and on whether the 20 feet of spare width leaves the route this mode depends on.

  • Does the work need racking or work zones on both sides with a full vehicle lane down the middle, or does it need a second lane that this 80-foot span cannot give?
  • Is the 150-foot length being bought for depth, or for the repeated bays — a long repeating bay sequence, so segment boundaries are set by bay lines rather than by walls?
  • What clear height does the activity need, measured to the lowest obstruction?
  • Are the run-off margins protected from storage and seating?
Planning assumptionTypical configuration

Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.

Usable area

How the 12,000 square feet divides at 80x150

Computed divided bay fit for a 80x150 steel gymnasium

MeasureComputed at this footprint
Divided bays across the 80-foot width2 at a 30-foot module
Leftover width20 ft (3,000 sq ft as a full-length strip)
Rows along the 150-foot length3 at a 40-foot module after 16 ft of circulation
Leftover depth14 ft (1,120 sq ft across the width)
Total divided bays6
Share of floor committed60%

Module footprint used here is 30 by 40 feet, this platform's planning module for a steel gymnasium. It is not a code minimum or an engineered clearance.

Example allocation of the 150-foot length — planning model, not survey data

ZoneLength along the buildingComputed area
Main assembly area93 ft7,440 sq ft
Circulation and entry30 ft2,400 sq ft
Support rooms and utility27 ft2,160 sq ft

Shares applied to the stored 150-foot length; areas computed against the 80-foot width.

Planning assumptionPlanning guidance

Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.

Allocation

Dividing the floor for a divisible floor carrying more than one activity at once

The activity pattern this floor could equally be planned around is a practice floor kept clear for training rather than for fixtures: there is no perimeter strip, so bags and equipment sit on the playing surface and the usable floor shrinks by more than the strip would have cost. Dividing the 12,000 sq ft by the 30 by 40 ft divided bay gives roughly 6 positions before circulation is deducted a second time for cross movement. Whether the plan keeps 6 or drops to 3 comes back to the question this footprint is really answering: how are two or three simultaneous activities separated without any of them losing usable width?

The 14-foot leftover depth is 1,120 square feet across the full width — deep enough to plan deliberately, and at this footprint it goes to a cross-aisle at one end so a group can reach its own bay without crossing another one in use. Every foot of width added multiplies through the roof and the frame; every foot of length mostly adds skin.

The 20 feet of spare width runs the whole 150-foot length — 3,000 square feet of wall strip. It earns its keep as shelving, staging or a walking route, not as another divided bay. Cleaning, maintenance and inspection all need reach, and reach is planned in the gaps rather than in the modules.

Several timetables run in parallel and change over at different times, so movement into and out of the building is continuous rather than concentrated. Access to each bay from a shared edge is the whole design question. Heating a tall clear volume is an operating decision made at the envelope stage. That movement pattern, not the 12,000-square-foot total, is what decides whether the leftover 14 feet is useful here.

Main assembly area93 × 80 ft · 7,440 sq ftCirculation and entry30 × 80 ft · 2,400 sq ftSupport rooms and utility27 × 80 ft · 2,160 sq ft150 ft overall length
assembly and support allocation allocation across the 150-foot length

Height

Interior height for a 80x150 steel gymnasium

Span drives headroom at 80x150: 80 feet of width on a 4:12 pitch puts 37.3 feet over the middle and 24 feet at the walls, so where a tall item stands matters as much as how tall it is. Temperature swing on a steel shell drives condensation decisions that outrank most layout preferences.

Height on a 80 ft span is a separate decision from the 150 ft length, and it is the span that sets the frame's behavior. Raising the eave over 12,000 sq ft affects every bay along the 150 ft dimension, so the test is whether divisible sports floor planning genuinely needs the extra clear height or only the floor area.

Ventilation across 12,000 square feet at this height: an intensively occupied volume with high activity levels, where air handling is planned for the occupied peak.

Planning assumptionPlanning guidance

Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.

Openings

Openings for 2 divided bays across

The 80-foot gable can carry 2 openings, one per divided bay, with 20 feet of wall left for piers between and beside them — the arrangement that keeps each position independently reachable. The count of working positions, not the headline area, is the figure that survives contact with the operation.

Each bay wants reachable entry from the shared route, and one wide opening still handles equipment for all of them. Where every bay has its own external door, the perimeter loses the wall the activity needed.

Planning assumptionEngineering-required

Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.

Cost drivers

Quantities that move the estimate at 80x150

No price appears on this page. The quantities that scale an estimate at 80x150 are 12,000 square feet of slab, 222.2 cubic yards of nominal concrete, 11,040 square feet of wall cladding and 12,649 square feet of roof cladding. Access, not area, is what makes a plan feel small once it is in use.

Dividing equipment, its structural support and the controls for it are the cost distinguishing this from an open floor, and they are frame-dependent rather than a later addition.

  • clear height above the playing surface
  • the clear span across the court and its run-off
  • the support wing with changing rooms
  • impact-resistant lighting and interior surfaces
Why we don't quote thisWe do not state 80x150 steel gymnasium pricing here, because it varies too much to give an honest figure. Published only with a documented inclusion basis, a collection date and a named source.

Comparison

What changes at adjacent footprints

Computed comparison of nearby footprints for a steel gymnasium

FootprintFloor areaDivided bays
60x804,800 sq ft4 (2 x 2)
40x1204,800 sq ft3 (1 x 3)
50x1005,000 sq ft2 (1 x 2)
60x1006,000 sq ft4 (2 x 2)
50x1206,000 sq ft6 (2 x 3)

Areas computed from each stored size record; divided bay counts computed with the same 30 by 40 foot planning module.

  • 60x80 moves the count from 6 to 4 divided bays (2 across by 2 deep), which is the reason to choose between them.
  • 40x120 moves the count from 6 to 3 divided bays (1 across by 3 deep), which is the reason to choose between them.
  • 50x100 moves the count from 6 to 2 divided bays (1 across by 2 deep), which is the reason to choose between them.

Nearby footprints read for a steel gymnasium: exact change in area and in planning divided bays

FootprintArea Δ% ΔDivided bays at that footprintWhat changes for this use
100x100−2,000 sq ft−16.7%3 (3 x 1)−3 divided bays on the same planning module.
80x120−2,400 sq ft−20%4 (2 x 2)−2 divided bays on the same planning module.
100x150+3,000 sq ft+25%4 (2 x 2)−2 divided bays on the same planning module.
60x150−3,000 sq ft−25%3 (1 x 3)−3 divided bays on the same planning module.

Areas are arithmetic on two stored size records; divided bay counts use this platform's 30 by 40 foot planning module and are not a capacity statement.

Because this footprint is planned as a divisible floor carrying more than one activity at once, the useful next reads are different from the ones a differently shaped steel gymnasium suggests: divisible sports floor planning, activity bay separation, shared access routes.

Visualization

Reading the 80x150 footprint as a steel gymnasium

150′ length80′ width12,000 sq ft
80x150 footprint plan, drawn from the stored dimensional record
24′ eave37.3′ ridge4:12 pitch · 80′ clear span
Gable cross section at a 24-foot eave and 4:12 pitch, computing to a 37.3-foot ridge

FAQ

Questions about 80x150 steel gymnasium projects

It depends on the height required above the playing surface for the activity, which is the type's defining dimension. The stored configuration computes to 37.3 feet at the ridge, but the eave is the number that governs anything standing near a wall.

Reserving 16 ft across the 80 ft dimension for movement leaves 64 ft of working width, which takes 2 divided bays at 30 ft. Along 150 ft it takes 3 runs at 40 ft. That is 6 positions out of 12,000 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on how are two or three simultaneous activities separated without any of them losing usable width. These are planning figures computed from the footprint, not a quoted layout.

The footprint holds 6 divided bays — 2 across by 3 deep — and leaves 14 feet of depth for a cross-aisle at one end so a group can reach its own bay without crossing another one in use. Those counts use a 30 by 40 foot planning module with 16 feet allowed for circulation, so a different module changes the answer.

Visual separation, mostly. Sound carries between bays, and where genuine separation is needed the answer is walls and a different building plan.

A 6-inch slab across 12,000 square feet computes to 222.2 cubic yards before thickened edges, piers or waste. The final design comes from the foundation engineer.

Methodology

How this page was produced

Sources and methodology

Verified sourceExternal factual sources
  • Find Steel Buildings dimensional records

    Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.

  • International Building Code and International Residential Code

    International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.

Platform calculationComputed on this platform
  • Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
  • Divided bay fit: Counts, leftover strips and per-module areas are computed from the stored 80x150 record against this platform's 30 by 40 foot planning module for the steel gymnasium category, with 16 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
  • Allocation model: Zone shares come from this platform's use typology for assembly and gathering space and are applied arithmetically to the stored 150-foot length.
Planning assumptionPlanning assumptions
  • Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
  • Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.

Methodology notes

  • Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.

Drawn to scale

Plans and dimensions

Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.

150′ length80′ width12,000 sq ft
Computed from stored dimensions
Footprint plan — 80′ × 150′, drawn to the stored dimensions.Platform calculation
Front third4,000 sq ftCenter third4,000 sq ftRear third4,000 sq ft80′ × 150′ floor plate
Computed from stored dimensions
Floor plate divided into equal thirds along the length; each area is computed from the stored footprint.Platform calculation

Continue your research

Related planning topics

Background reading on the questions this page raises. None of these pages sells anything.

Compare 80x150 steel gymnasium configurations

Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.

Get a Quote