Skip to content
Find Steel Buildings

Building Types

40x70 Fleet Maintenance Garage

Width
40 ft
Length
70 ft
Floor area
2,800 sq ft
Perimeter
220 ft
Concept visualization of a fleet maintenance garage at a representative 70 by 130 foot size; not a real project.
Example Configuration
fleet maintenance garage concept visualization at a representative 70x130 size.Example configuration — for planning purposes only
Last updated Aug 27, 2026Reviewed under the Find Steel Buildings editorial standards

Get Quotes for a 40×70 Fleet Garage

Fleet Garage ✓40′ × 70′ ✓
Continue

Configuration

How This Building Is Configured

70′ length40′ width2,800 sq ft
Footprint drawn to the stated dimensions.Platform calculation

Configuration summary

Building typeFleet Garage
Footprint40 ft × 70 ft
Floor area2,800 sq ft
Eave height14 ft

Example

Example Configuration

Example configuration of a 40 by 70 foot fleet garage
Fleet Garage shown as an example configuration — for planning purposes only. Doors, colors and openings are specified for the actual project.

Quick dimensions

At a Glance

  • Width

    40 ft across the gable end.

  • Length

    70 ft along the sidewall.

  • Floor area

    2,800 sq ft of clear floor.

  • Eave height

    14 ft at the sidewall on the stored profile.

Access

Doors & Access Considerations

  • Opening width

    Across a 40 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.

  • Opening height

    A 14 ft eave sets the ceiling on door height before any frame change.

  • Drive-through

    Matching openings at both ends avoid reversing, at the cost of usable wall.

Use

How a 40×70 Fleet Garage May Be Used

  • Fleet maintenance

    Bay width and door placement determine how many vehicles park comfortably and how they circulate.

  • Municipal

    A wall of bench space is commonly kept clear of door swings and vehicle doors.

  • Trucking

    Shelving depth along a side wall reduces the usable parking width, so it is planned early.

Planning

Footprint & Space Planning

  • Footprint

    Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.

  • Height

    Eave height affects door options, storage height and how open the interior feels.

  • Access

    Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.

  • Doors and openings

    Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.

  • Site

    Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.

  • Expansion

    Extending along the length is usually simpler than changing the width later, which is worth deciding up front.

Similar sizes

Other Sizes for a Fleet Garage

Related

Related Building Types

Example configuration — for planning purposes only.

FAQ

Common Questions

40 ft × 70 ft is 2,800 square feet of floor area before any interior partitions.

Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.

Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.

Compare nearby sizes

Related footprints for this building type

Each page works through one footprint for one building type.

Overview

A 40x70 fleet garage planned as a small service fleet base where vehicles are loaded as well as parked

This page is ordered around height and clearance, because at 40x70 the 14-foot eave limits a fleet garage sooner than the plan does.

The footprint holds 6 loaded stands — 3 across by 2 deep — and leaves 13 feet of depth for a stock wall where the materials that go into the vans each morning are picked without opening a vehicle door.

What distinguishes 40x70 is depth behaviour: 2 rows along 70 feet after 13 feet of circulation, with 13 feet unaccounted for at the end of the run. Security and after-hours access are easier to design in the door layout than to bolt on later.

A fleet garage is an operational vehicle facility: it is planned around getting a group of vehicles out on schedule and back again, not around storing them. As for work on the assets themselves, routine checks, tire and fluid work and defect rectification happen in-house on dedicated bays. A 40 by 70 footprint is a clearly directional plan: 2,800 sq ft enclosed by 220 ft of wall, at a 1.8:1 length-to-width proportion. Along its 70 ft dimension it takes 3 runs of loaded stands at 22 ft, leaving 4 ft over — the 4 ft is where the argument about this size actually happens. A service fleet carries its work with it, so the building is a stock room with parking attached rather than a garage. The distance between the stock and the vehicle door is the number this plan is judged on. Pedestrian movement peaks at exactly the moment vehicle movement does, which is the safety question the plan has to answer.

At 40x70 the operating question is a specific one: where does the material that goes into the vehicles live, and how far is it from the stand? That is a different question from the one a fleet garage of another shape has to answer, and it is why this footprint is planned as a small service fleet base where vehicles are loaded as well as parked rather than as generic covered area.

Planning assumptionPlatform calculation

Areas, perimeter, roof area, ridge height, slab volume and the loaded stand counts on this page are computed from the stored 40x70 record and this platform's planning module for the fleet garage category.

Height

Interior height for a 40x70 fleet garage

The stored configuration carries a 14-foot eave and computes to 19 feet at the ridge on a 3:12 pitch — a 5-foot rise across 40 feet. Height is therefore not uniform, and the sidewall is the constraint. Two operations of the same size can want opposite plans, so the arithmetic below is a starting point rather than a recommendation.

Height on a 40 ft span is a separate decision from the 70 ft length, and it is the span that sets the frame's behavior. Raising the eave over 2,800 sq ft affects every bay along the 70 ft dimension, so the test is whether service fleet stock planning genuinely needs the extra clear height or only the floor area.

Planning assumptionPlanning guidance

Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.

Usable area

How the 2,800 square feet divides at 40x70

Computed loaded stand fit for a 40x70 fleet garage

MeasureComputed at this footprint
Loaded stands across the 40-foot width3 at a 12-foot module
Leftover width4 ft (280 sq ft as a full-length strip)
Rows along the 70-foot length2 at a 22-foot module after 13 ft of circulation
Leftover depth13 ft (520 sq ft across the width)
Total loaded stands6
Share of floor committed57%

Module footprint used here is 12 by 22 feet, this platform's planning module for a fleet garage. It is not a code minimum or an engineered clearance.

Example allocation of the 70-foot length — planning model, not survey data

ZoneLength along the buildingComputed area
Work zone and benches31.5 ft1,260 sq ft
Machine and assembly floor24.5 ft980 sq ft
Material storage14 ft560 sq ft

Shares applied to the stored 70-foot length; areas computed against the 40-foot width.

Planning assumptionPlanning guidance

Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.

Allocation

Dividing the floor for a small service fleet base where vehicles are loaded as well as parked

Turnover here is daily: most of what is inside at night is outside by mid-morning and back again before dark. The operating pattern this base slips into when the roster changes is a base carrying its own light maintenance alongside parking: tools and parts have no wall of their own, so they occupy a bench that was meant to be clear working space. Dividing the 2,800 sq ft by the 12 by 22 ft loaded stand gives roughly 6 positions before circulation is deducted a second time for cross movement. Whether the plan keeps 6 or drops to 3 comes back to the question this footprint is really answering: where does the material that goes into the vehicles live, and how far is it from the stand?

Because 13 feet clears the 9 feet this platform treats as usable, the end of the run is a room rather than a gap: 520 square feet for a stock wall where the materials that go into the vans each morning are picked without opening a vehicle door. The span is the commitment; everything inside it is rearrangeable later, and the 40-foot dimension is not.

The 4 feet of spare width runs the whole 70-foot length — 280 square feet of wall strip. It earns its keep as shelving, staging or a walking route, not as another loaded stand. Doors and their approaches decide more about daily use here than the enclosed area does.

The morning is a picking operation before it is a driving one. Several people load at once, which is why the aisle here is a working space rather than only a route. Turnaround time, not floor area, is the number a fleet base is judged on. The perimeter is fully enclosed and secured, because keys, fuel cards, tooling and telematics live with the vehicles. That movement pattern, not the 2,800-square-foot total, is what decides whether the leftover 13 feet is useful here.

Work zone and benches31.5 × 40 ft · 1,260 sq ftMachine and assembly floor24.5 × 40 ft · 980 sq ftMaterial storage14 × 40 ft · 560 sq ft70 ft overall length
workflow allocation allocation across the 70-foot length

Openings

Openings for 3 loaded stands across

One opening per position works on this gable: 3 across 40 feet, with 4 feet of wall to distribute as piers. Splitting that margin evenly is what keeps the elevation buildable. An empty building looks generous and a working one rarely does; plan against the working state.

A vehicle opening and a separate material opening, because deliveries of stock and departures of vehicles peak at overlapping times. One shared door makes each wait for the other.

Planning assumptionEngineering-required

Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.

Configurations

Configuring 6 loaded stands at 40x70

At 23.3-foot nominal bays the structure works with the layout instead of against it: one loaded stand per bay line, walls free of awkward half-positions. The building is fixed for decades while the operation inside it changes every few years, and the plan has to survive that.

Depth here creates a hierarchy: 2 rows means front positions get used and rear positions get filled. Deciding which is which up front is what keeps 40x70 workable. The floor treatment is a use decision that outlasts most of the equipment standing on it.

Extension is cheapest along the 70 ft dimension, where each added bay repeats work already framed; widening past 40 ft is a different frame rather than a longer one. Growing to 40 by 92 adds a 4th run of loaded stands — useful if the constraint is loaded stands rather than the 4 ft already spare at the far end.

Configured as a small service fleet base where vehicles are loaded as well as parked, 40x70 is judged on whether the 6 loaded stands it holds match the operation, and on whether the 4 feet of spare width leaves the route this mode depends on.

  • Does the work need three parked lanes, or two lanes and a moving lane wide enough for equipment to pass, or does it need a second lane that this 40-foot span cannot give?
  • Is the 70-foot length being bought for depth, or for the repeated bays — six to eight repeated bays, and the bay line becomes the organising device for the whole plan?
  • How many vehicles have to leave within the same window, and does the lane order allow it?
  • Are service positions separate from the parking lanes?
Planning assumptionTypical configuration

Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.

Cost drivers

Quantities that move the estimate at 40x70

No price appears on this page. The quantities that scale an estimate at 40x70 are 2,800 square feet of slab, 34.6 cubic yards of nominal concrete, 3,080 square feet of wall cladding and 2,886 square feet of roof cladding. Ground conditions and drainage decide the floor before the frame does.

Racking, lighting at the pick face and the power for tool charging distinguish this from a plain parking shell.

  • the number of lanes and openings the dispatch window needs
  • charging or fuelling infrastructure positions
  • opening height set by the tallest fleet vehicle
  • yard staging area outside the building
Why we don't quote thisWe do not state 40x70 fleet garage pricing here, because it varies too much to give an honest figure. Published only with a documented inclusion basis, a collection date and a named source.

Comparison

What changes at adjacent footprints

Computed comparison of nearby footprints for a fleet garage

FootprintFloor areaLoaded stands
30x401,200 sq ft3 (3 x 1)
24x501,200 sq ft2 (2 x 1)
32x401,280 sq ft3 (3 x 1)
36x401,440 sq ft3 (3 x 1)
24x601,440 sq ft4 (2 x 2)

Areas computed from each stored size record; loaded stand counts computed with the same 12 by 22 foot planning module.

  • 30x40 moves the count from 6 to 3 loaded stands (3 across by 1 deep), which is the reason to choose between them.
  • 24x50 moves the count from 6 to 2 loaded stands (2 across by 1 deep), which is the reason to choose between them.
  • 32x40 moves the count from 6 to 3 loaded stands (3 across by 1 deep), which is the reason to choose between them.

Nearby footprints read for a fleet garage: exact change in area and in planning loaded stands

FootprintArea Δ% ΔLoaded stands at that footprintWhat changes for this use
30x100+200 sq ft+7.1%6 (2 x 3)Same loaded stand count on this planning module; the difference is circulation and stored depth, not capacity.
50x50−300 sq ft−10.7%4 (4 x 1)−2 loaded stands on the same planning module.
40x80+400 sq ft+14.3%6 (3 x 2)Same loaded stand count on this planning module; the difference is circulation and stored depth, not capacity.
40x60−400 sq ft−14.3%6 (3 x 2)Same loaded stand count on this planning module; the difference is circulation and stored depth, not capacity.

Areas are arithmetic on two stored size records; loaded stand counts use this platform's 12 by 22 foot planning module and are not a capacity statement.

Because this footprint is planned as a small service fleet base where vehicles are loaded as well as parked, the useful next reads are different from the ones a differently shaped fleet garage suggests: service fleet stock planning, pick face layout, loading aisle width.

Visualization

Reading the 40x70 footprint as a fleet garage

70′ length40′ width2,800 sq ft
40x70 footprint plan, drawn from the stored dimensional record
12′ eave17′ ridge3:12 pitch · 40′ clear span
Gable cross section at a 14-foot eave and 3:12 pitch, computing to a 19-foot ridge

FAQ

Questions about 40x70 fleet garage projects

3,080 square feet of wall and 2,886 square feet of roof at a 3:12 pitch — the roof exceeding the floor by 3%.

Reserving 13 ft across the 40 ft dimension for movement leaves 27 ft of working width, which takes 2 loaded stands at 12 ft. Along 70 ft it takes 3 runs at 22 ft. That is 6 positions out of 2,800 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on where does the material that goes into the vehicles live, and how far is it from the stand. These are planning figures computed from the footprint, not a quoted layout.

The width leaves 4 feet spare after 3 loaded stands. That margin absorbs wall storage and passing room. Width is the dimension that cannot be extended later.

For a service fleet it usually saves the most time, provided the stock is on a separate flank with its own access. Mixing them in one undivided space is what causes both to be searched through.

Length here buys 2 rows and 3 nominal bays; width buys 3 positions side by side. At this aspect ratio the building is already long for its span, so extra length adds depth rather than capacity.

Methodology

How this page was produced

Sources and methodology

Verified sourceExternal factual sources
  • Find Steel Buildings dimensional records

    Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.

  • International Building Code and International Residential Code

    International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.

Platform calculationComputed on this platform
  • Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
  • Loaded stand fit: Counts, leftover strips and per-module areas are computed from the stored 40x70 record against this platform's 12 by 22 foot planning module for the fleet garage category, with 13 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
  • Allocation model: Zone shares come from this platform's use typology for workshop and hobby space and are applied arithmetically to the stored 70-foot length.
Planning assumptionPlanning assumptions
  • Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
  • Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.

Methodology notes

  • Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.

Drawn to scale

Plans and dimensions

Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.

70′ length40′ width2,800 sq ft
Computed from stored dimensions
Footprint plan — 40′ × 70′, drawn to the stored dimensions.Platform calculation
Front third933 sq ftCenter third933 sq ftRear third933 sq ft40′ × 70′ floor plate
Computed from stored dimensions
Floor plate divided into equal thirds along the length; each area is computed from the stored footprint.Platform calculation

Compare 40x70 fleet garage configurations

Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.

Get a Quote