Skip to content
Find Steel Buildings

Building Types

80x100 Livestock Barn

Width
80 ft
Length
100 ft
Floor area
8,000 sq ft
Perimeter
360 ft
Concept visualization of a steel livestock barn at a representative 60 by 105 foot size; not a real project.
Example Configuration
steel livestock barn concept visualization at a representative 60x105 size.Example configuration — for planning purposes only
Last updated Aug 27, 2026Reviewed under the Find Steel Buildings editorial standards

Get Quotes for a 80×100 Livestock Barn

Livestock Barn ✓80′ × 100′ ✓
Continue

Use

How a 80×100 Livestock Barn May Be Used

  • Equipment shelter

    Machinery clearance height and door width are usually the limiting factors, not floor area.

  • Commodity and forage

    Bulk storage depth against the sidewalls affects how the building is loaded and unloaded.

  • Drive-through access

    End-to-end access lets equipment pass through without reversing.

  • Seasonal working space

    Open floor is commonly kept for repairs and staging between seasons.

Example

Example Configuration

Example configuration of a 80 by 100 foot livestock barn
Livestock Barn shown as an example configuration — for planning purposes only. Doors, colors and openings are specified for the actual project.

Quick dimensions

At a Glance

  • Width

    80 ft across the gable end.

  • Length

    100 ft along the sidewall.

  • Floor area

    8,000 sq ft of clear floor.

  • Eave height

    20 ft at the sidewall on the stored profile.

Configuration

How This Building Is Configured

100′ length80′ width8,000 sq ft
Footprint drawn to the stated dimensions.Platform calculation

Configuration summary

Building typeLivestock Barn
Footprint80 ft × 100 ft
Floor area8,000 sq ft
Eave height20 ft

Planning

Footprint & Space Planning

  • Footprint

    Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.

  • Height

    Eave height affects door options, storage height and how open the interior feels.

  • Access

    Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.

  • Doors and openings

    Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.

  • Site

    Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.

  • Expansion

    Extending along the length is usually simpler than changing the width later, which is worth deciding up front.

Access

Doors & Access Considerations

  • Opening width

    Across a 80 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.

  • Opening height

    A 20 ft eave sets the ceiling on door height before any frame change.

  • Drive-through

    Matching openings at both ends avoid reversing, at the cost of usable wall.

Similar sizes

Other Sizes for a Livestock Barn

Related

Related Building Types

FAQ

Common Questions

80 ft × 100 ft is 8,000 square feet of floor area before any interior partitions.

Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.

Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.

Compare nearby sizes

Related footprints for this building type

Each page works through one footprint for one building type.

Cost drivers

Quantities that move the estimate at 80x100

Quantities, not prices, are publishable here: roof cladding runs 8,433 square feet — 5% above the 8,000-square-foot floor at a 4:12 pitch — with 148.1 cubic yards of nominal slab beneath it. Interior divisions are the last decision that should be fixed, because they are the first one that usually changes.

Proportion drives cost here as much as size does: 360 ft of wall around 8,000 sq ft is 0.045 ft of wall per enclosed square foot, and a squarer plan of the same area would carry less. What moves the figure further on a a deep-bedded pack barn cleaned out in campaigns rather than daily is the fit-out deep bedded pack barn implies, along with framed openings and the height chosen for the 80 ft span.

  • ventilation provisions and sidewall openings
  • interior pens, gates and durable linings
  • the alley width the cleaning machine needs
  • drainage and washdown provisions
Why we don't quote thisWe do not state 80x100 livestock barn pricing here, because it varies too much to give an honest figure. Published only with a documented inclusion basis, a collection date and a named source.

Overview

A 80x100 livestock barn planned as a deep-bedded pack barn cleaned out in campaigns rather than daily

This page is ordered around the clean-out, because it is the one operation that touches every square foot and the only one that a fixed obstruction can ruin.

The footprint holds 4 bedded bays — 2 across by 2 deep — and the remaining 6 feet is marginal: there is no clean-out approach, so the pack is emptied through the same opening used daily and the building is out of use while it happens.

Efficiency is the useful number here: 2,000 square feet of enclosed floor per bedded bay, against a 1200-square-foot module. That is generous — the footprint is doing more than hold modules. Ground conditions and drainage decide the floor before the frame does.

A 80 by 100 footprint is a mildly directional plan: 8,000 sq ft enclosed by 360 ft of wall, at a 1.3:1 length-to-width proportion. Along its 100 ft dimension it takes 2 runs of bedded bays at 40 ft, leaving 20 ft over — the 20 ft is where the argument about this size actually happens. A deep-bedded plan accumulates through a season and is emptied in one operation, which makes the clean-out the event the building is designed around. Anything fixed in the machine's path — a post, a pen division, a water line — turns a day's work into a week's. A stock building is entered at night by somebody alone, and lighting and route legibility are part of the brief.

This footprint is planned as a deep-bedded pack barn cleaned out in campaigns rather than daily. Spent as a square 89 by 89 instead, the same 8,000 sq ft would stand 2 bedded bays across rather than 2, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. Compared with a 80 by 80 of the same width, the extra depth here adds run rather than reach: it buys about 2 bedded bays in line, and every position past the second is retrieved by moving what stands in front of it. A building of this size behaves like a small yard under a roof: zones need to be defined, signed and left alone, or they migrate. Daily work is bedding and feeding at the edges; the intensive work happens once or twice a year. The plan is judged on the intensive event because that is when its errors are expensive. Ventilation in a stock building follows the animals and the climate, and it is the system most often compromised by later additions.

Planning assumptionPlatform calculation

Areas, perimeter, roof area, ridge height, slab volume and the bedded bay counts on this page are computed from the stored 80x100 record and this platform's planning module for the livestock barn category.

Openings

Openings for 2 bedded bays across

One opening per position works on this gable: 2 across 80 feet, with 20 feet of wall to distribute as piers. Splitting that margin evenly is what keeps the elevation buildable. Plan the exit as carefully as the entrance; buildings are emptied under more time pressure than they are filled.

A full-width or end opening that the clean-out equipment can enter and turn in. This is the defining opening of the plan and it is set by the machine rather than by the stock.

Animals loaded through a handling route at one end; feed and bedding delivered to a different point entirely.

Planning assumptionEngineering-required

Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.

Usable area

How the 8,000 square feet divides at 80x100

Computed bedded bay fit for a 80x100 livestock barn

MeasureComputed at this footprint
Bedded bays across the 80-foot width2 at a 30-foot module
Leftover width20 ft (2,000 sq ft as a full-length strip)
Rows along the 100-foot length2 at a 40-foot module after 14 ft of circulation
Leftover depth6 ft (480 sq ft across the width)
Total bedded bays4
Share of floor committed60%

Module footprint used here is 30 by 40 feet, this platform's planning module for a livestock barn. It is not a code minimum or an engineered clearance.

Example allocation of the 100-foot length — planning model, not survey data

ZoneLength along the buildingComputed area
Stalls and animal housing45 ft3,600 sq ft
Aisle and handling space30 ft2,400 sq ft
Tack, feed and storage25 ft2,000 sq ft

Shares applied to the stored 100-foot length; areas computed against the 80-foot width.

Planning assumptionPlanning guidance

Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.

Height

Interior height for a 80x100 livestock barn

Span drives headroom at 80x100: 80 feet of width on a 4:12 pitch puts 33.3 feet over the middle and 20 feet at the walls, so where a tall item stands matters as much as how tall it is. What the building holds in its busiest week is the honest brief; the rest of the year is slack.

Height on a 80 ft span is a separate decision from the 100 ft length, and it is the span that sets the frame's behavior. Raising the eave over 8,000 sq ft affects every bay along the 100 ft dimension, so the test is whether deep bedded pack barn genuinely needs the extra clear height or only the floor area.

Ventilation across 8,000 square feet at this height: air quality above the animals is the defining requirement of the building, and it drives ridge, eave and sidewall decisions together.

Planning assumptionPlanning guidance

Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.

Allocation

Dividing the floor for a deep-bedded pack barn cleaned out in campaigns rather than daily

The housing pattern this barn could equally be planned around is a barn planned around handling, sorting and treating animals rather than housing them: there is no holding area, so gathering happens in the yard and the working position is fed one animal at a time. Dividing the 8,000 sq ft by the 30 by 40 ft bedded bay gives roughly 4 positions before circulation is deducted a second time for cross movement. Whether the plan keeps 4 or drops to 2 comes back to the question this footprint is really answering: how does the machine that empties this building get in, and what has to be moved before it can?

Treating the last 6 feet as a room is the recurring planning error at 80x100: there is no clean-out approach, so the pack is emptied through the same opening used daily and the building is out of use while it happens. Neighbouring buildings, setbacks and the approach road often decide the orientation before the plan does.

Spare width is the more valuable of the two leftovers here: a continuous 20-foot strip beats the same area stranded at the end of the run, because it touches every position along the way. The plan should survive the day the largest item the operation owns has to come inside.

Spent as a square 89 by 89 instead, the same 8,000 sq ft would stand 2 bedded bays across rather than 2, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. Compared with a 80 by 80 of the same width, the extra depth here adds run rather than reach: it buys about 2 bedded bays in line, and every position past the second is retrieved by moving what stands in front of it. A building of this size behaves like a small yard under a roof: zones need to be defined, signed and left alone, or they migrate. Daily work is bedding and feeding at the edges; the intensive work happens once or twice a year. The plan is judged on the intensive event because that is when its errors are expensive. Ventilation in a stock building follows the animals and the climate, and it is the system most often compromised by later additions. That movement pattern, not the 8,000-square-foot total, is what decides whether the leftover 6 feet is useful here.

Stalls and animal housing45 × 80 ft · 3,600 sq ftAisle and handling space30 × 80 ft · 2,400 sq ftTack, feed and storage25 × 80 ft · 2,000 sq ft100 ft overall length
stall, aisle and storage allocation allocation across the 100-foot length

Configurations

Configuring 4 bedded bays at 80x100

Nominal bay division computes to 4 bays at about 25 feet, narrower than the 30-foot module — so frame lines land inside positions and the interior has to be set out from the columns. A leftover strip earns its place only when something is deliberately put in it; otherwise it is circulation with a nicer name.

With 2 rows deep, the rear row is behind the front one. Without a route past it, those bedded bays become storage positions rather than working ones — the real cost of depth at this width. The corner nobody plans for is the one that fills first, which is an argument for planning it.

Bays are added in line, keeping every bay reachable from the same clean-out end.

Configured as a deep-bedded pack barn cleaned out in campaigns rather than daily, 80x100 is judged on whether the 4 bedded bays it holds match the operation, and on whether the 20 feet of spare width leaves the route this mode depends on.

  • Does the work need racking or work zones on both sides with a full vehicle lane down the middle, or does it need a second lane that this 80-foot span cannot give?
  • Is the 100-foot length being bought for depth, or for the repeated bays — eight to ten repeated bays, which makes the layout a scheduling problem as much as a spatial one?
  • How does air move through the barn on a still day?
  • Can the cleaning machine work the full alley without moving animals twice?
Planning assumptionTypical configuration

Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.

Comparison

What changes at adjacent footprints

Computed comparison of nearby footprints for a livestock barn

FootprintFloor areaBedded bays
40x803,200 sq ft4 (2 x 2)
60x603,600 sq ft2 (2 x 1)
50x804,000 sq ft4 (2 x 2)
40x1004,000 sq ft6 (2 x 3)
60x804,800 sq ft2 (2 x 1)

Areas computed from each stored size record; bedded bay counts computed with the same 30 by 40 foot planning module.

  • 40x80 holds the same 4 bedded bays but changes the leftover depth by +6 feet, which is where the difference is actually felt.
  • 60x60 moves the count from 4 to 2 bedded bays (2 across by 1 deep), which is the reason to choose between them.
  • 50x80 holds the same 4 bedded bays but changes the leftover depth by +2 feet, which is where the difference is actually felt.

Nearby footprints read for a livestock barn: exact change in area and in planning bedded bays

FootprintArea Δ% ΔBedded bays at that footprintWhat changes for this use
50x150−500 sq ft−6.2%10 (2 x 5)+6 bedded bays on the same planning module.
60x150+1,000 sq ft+12.5%15 (3 x 5)+11 bedded bays on the same planning module.
80x120+1,600 sq ft+20%4 (2 x 2)Same bedded bay count on this planning module; the difference is circulation and stored depth, not capacity.
80x80−1,600 sq ft−20%6 (3 x 2)+2 bedded bays on the same planning module.

Areas are arithmetic on two stored size records; bedded bay counts use this platform's 30 by 40 foot planning module and are not a capacity statement.

Because this footprint is planned as a deep-bedded pack barn cleaned out in campaigns rather than daily, the useful next reads are different from the ones a differently shaped livestock barn suggests: deep bedded pack barn, clean out access, seasonal bedding accumulation.

Visualization

Reading the 80x100 footprint as a livestock barn

100′ length80′ width8,000 sq ft
80x100 footprint plan, drawn from the stored dimensional record
20′ eave33.3′ ridge4:12 pitch · 80′ clear span
Gable cross section at a 20-foot eave and 4:12 pitch, computing to a 33.3-foot ridge

FAQ

Questions about 80x100 livestock barn projects

7,200 square feet of wall and 8,433 square feet of roof at a 4:12 pitch — the roof exceeding the floor by 5%.

Reserving 14 ft across the 80 ft dimension for movement leaves 66 ft of working width, which takes 2 bedded bays at 30 ft. Along 100 ft it takes 2 runs at 40 ft. That is 4 positions out of 8,000 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on how does the machine that empties this building get in, and what has to be moved before it can. These are planning figures computed from the footprint, not a quoted layout.

The width leaves 20 feet spare after 2 bedded bays. That margin absorbs wall storage and passing room. Width is the dimension that cannot be extended later.

Because the bedding pack builds up through the season and the air space above the animals reduces as it does. The allowance is specific to the operation and the climate.

Length here buys 2 rows and 4 nominal bays; width buys 2 positions side by side. At this aspect ratio both dimensions are still adding usable positions.

Methodology

How this page was produced

Sources and methodology

Verified sourceExternal factual sources
  • Find Steel Buildings dimensional records

    Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.

  • International Building Code and International Residential Code

    International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.

Platform calculationComputed on this platform
  • Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
  • Bedded bay fit: Counts, leftover strips and per-module areas are computed from the stored 80x100 record against this platform's 30 by 40 foot planning module for the livestock barn category, with 14 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
  • Allocation model: Zone shares come from this platform's use typology for equine housing and riding space and are applied arithmetically to the stored 100-foot length.
Planning assumptionPlanning assumptions
  • Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
  • Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.

Methodology notes

  • Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.

Drawn to scale

Plans and dimensions

Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.

100′ length80′ width8,000 sq ft
Computed from stored dimensions
Footprint plan — 80′ × 100′, drawn to the stored dimensions.Platform calculation
Front third2,667 sq ftCenter third2,667 sq ftRear third2,667 sq ft80′ × 100′ floor plate
Computed from stored dimensions
Floor plate divided into equal thirds along the length; each area is computed from the stored footprint.Platform calculation

Continue your research

Related planning topics

Background reading on the questions this page raises. None of these pages sells anything.

Compare 80x100 livestock barn configurations

Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.

Get a Quote