Skip to content
Find Steel Buildings

Building Types

60x100 Grain Storage Building

Width
60 ft
Length
100 ft
Floor area
6,000 sq ft
Perimeter
320 ft
Concept visualization of a grain and commodity storage building at a representative 70 by 105 foot size; not a real project.
Example Configuration
grain and commodity storage building concept visualization at a representative 70x105 size.Example configuration — for planning purposes only
Last updated Aug 27, 2026Reviewed under the Find Steel Buildings editorial standards

Get Quotes for a 60×100 Grain Storage Building

Grain Storage Building ✓60′ × 100′ ✓
Continue

Use

How a 60×100 Grain Storage Building May Be Used

  • Equipment shelter

    Machinery clearance height and door width are usually the limiting factors, not floor area.

  • Commodity and forage

    Bulk storage depth against the sidewalls affects how the building is loaded and unloaded.

  • Drive-through access

    End-to-end access lets equipment pass through without reversing.

  • Seasonal working space

    Open floor is commonly kept for repairs and staging between seasons.

Example

Example Configuration

Example configuration of a 60 by 100 foot grain storage building
Grain Storage Building shown as an example configuration — for planning purposes only. Doors, colors and openings are specified for the actual project.

Quick dimensions

At a Glance

  • Width

    60 ft across the gable end.

  • Length

    100 ft along the sidewall.

  • Floor area

    6,000 sq ft of clear floor.

  • Eave height

    18 ft at the sidewall on the stored profile.

Configuration

How This Building Is Configured

100′ length60′ width6,000 sq ft
Footprint drawn to the stated dimensions.Platform calculation

Configuration summary

Building typeGrain Storage Building
Footprint60 ft × 100 ft
Floor area6,000 sq ft
Eave height18 ft

Planning

Footprint & Space Planning

  • Footprint

    Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.

  • Height

    Eave height affects door options, storage height and how open the interior feels.

  • Access

    Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.

  • Doors and openings

    Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.

  • Site

    Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.

  • Expansion

    Extending along the length is usually simpler than changing the width later, which is worth deciding up front.

Access

Doors & Access Considerations

  • Opening width

    Across a 60 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.

  • Opening height

    A 18 ft eave sets the ceiling on door height before any frame change.

  • Drive-through

    Matching openings at both ends avoid reversing, at the cost of usable wall.

Similar sizes

Other Sizes for a Grain Storage Building

Related

Related Building Types

FAQ

Common Questions

60 ft × 100 ft is 6,000 square feet of floor area before any interior partitions.

Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.

Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.

Compare nearby sizes

Related footprints for this building type

Each page works through one footprint for one building type.

Overview

A 60x100 grain storage building planned as a loading and handling building organised around vehicle movement

This page is ordered around height and clearance, because at 60x100 the 18-foot eave limits a grain storage building sooner than the plan does.

The footprint holds 6 loading positions — 3 across by 2 deep — and leaves 26 feet of depth for a waiting position clear of the loading lane so a second vehicle can stage without blocking the one being worked.

What distinguishes 60x100 is depth behaviour: 2 rows along 100 feet after 18 feet of circulation, with 26 feet unaccounted for at the end of the run. A building that cannot be reversed out of is a building that gets used in one direction only.

A 60 by 100 footprint is a clearly directional plan: 6,000 sq ft enclosed by 320 ft of wall, at a 1.7:1 length-to-width proportion. Along its 100 ft dimension it takes 3 runs of loading positions at 28 ft, leaving 16 ft over — the 16 ft is where the argument about this size actually happens. Taken purely as arithmetic, 60 by 100 gives 2 loading positions across the 60 ft dimension once 18 ft is reserved for movement, and 3 deep along the 100 ft dimension. Run as a a loading and handling building organised around vehicle movement, 8 ft across is below the 12 ft this use needs to be worth planning, so there is no waiting position, so a second vehicle waits in the yard or on the approach and the queue is external Material handling, not enclosed volume, is what decides whether a commodity building works in its busiest week.

At 60x100 the operating question is a specific one: how many vehicles can be worked at once before the yard rather than the building becomes the constraint? That is a different question from the one a grain storage building of another shape has to answer, and it is why this footprint is planned as a loading and handling building organised around vehicle movement rather than as generic covered area.

Planning assumptionPlatform calculation

Areas, perimeter, roof area, ridge height, slab volume and the loading position counts on this page are computed from the stored 60x100 record and this platform's planning module for the grain storage building category.

Height

Interior height for a 60x100 grain storage building

Span drives headroom at 60x100: 60 feet of width on a 3:12 pitch puts 25.5 feet over the middle and 18 feet at the walls, so where a tall item stands matters as much as how tall it is. Set the openings before the interior, because the openings cannot move and the interior can.

Height on a 60 ft span is a separate decision from the 100 ft length, and it is the span that sets the frame's behavior. Raising the eave over 6,000 sq ft affects every bay along the 100 ft dimension, so the test is whether loading building planning genuinely needs the extra clear height or only the floor area.

Ventilation across 6,000 square feet at this height: stored product needs air movement and monitoring, which makes ventilation a stored-quality question rather than a comfort one.

Planning assumptionPlanning guidance

Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.

Usable area

How the 6,000 square feet divides at 60x100

Computed loading position fit for a 60x100 grain storage building

MeasureComputed at this footprint
Loading positions across the 60-foot width3 at a 17-foot module
Leftover width9 ft (900 sq ft as a full-length strip)
Rows along the 100-foot length2 at a 28-foot module after 18 ft of circulation
Leftover depth26 ft (1,560 sq ft across the width)
Total loading positions6
Share of floor committed48%

Module footprint used here is 17 by 28 feet, this platform's planning module for a grain storage building. It is not a code minimum or an engineered clearance.

Example allocation of the 100-foot length — planning model, not survey data

ZoneLength along the buildingComputed area
Equipment bays60 ft3,600 sq ft
Material and input storage25 ft1,500 sq ft
Working and turning space15 ft900 sq ft

Shares applied to the stored 100-foot length; areas computed against the 60-foot width.

Planning assumptionPlanning guidance

Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.

Allocation

Dividing the floor for a loading and handling building organised around vehicle movement

The handling pattern this building slips into when the season peaks is a support building serving bulk storage held elsewhere on the site: equipment is left outside between seasons, which shortens its life and puts set-up time into every use. Positions are laid out against the approach direction rather than against the walls, and everything not directly serving a position — sampling, records, tools — sits outside the movement envelope.

Depth arithmetic leaves a working end zone here. 1,560 square feet sits past the last row, which is why 60x100 tends to be planned with a waiting position clear of the loading lane so a second vehicle can stage without blocking the one being worked designed in rather than added later. Noise from this floor reaches the office, the neighbours and the yard, and separation is a plan decision.

The 9 feet of spare width runs the whole 100-foot length — 900 square feet of wall strip. It earns its keep as shelving, staging or a walking route, not as another loading position. Temperature swing on a steel shell drives condensation decisions that outrank most layout preferences.

One-way movement wherever the site allows it. Every reversing manoeuvre inside a working building is time, risk and a blocked position, and the layout either designs them out or lives with them. Contamination risk is highest where storage and machinery share an opening. That movement pattern, not the 6,000-square-foot total, is what decides whether the leftover 26 feet is useful here.

Equipment bays60 × 60 ft · 3,600 sq ftMaterial and input storage25 × 60 ft · 1,500 sq ftWorking and turning space15 × 60 ft · 900 sq ft100 ft overall length
equipment and storage allocation allocation across the 100-foot length

Openings

Openings for 3 loading positions across

One opening per position works on this gable: 3 across 60 feet, with 9 feet of wall to distribute as piers. Splitting that margin evenly is what keeps the elevation buildable. Where the building sits on the site changes how much of this floor is genuinely reachable.

The 60 ft ends and the 100 ft sides offer very different opening budgets: 60 ft of end wall has room for one wide opening or two modest ones, while 100 ft of side wall can carry several without the openings competing. On this plan the deciding factor is whether loading building planning or vehicle turnaround should be the first thing reached from the door.

Machine handling at one end with a clear path to the pile, and product moved rather than carried.

Planning assumptionEngineering-required

Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.

Configurations

Configuring 6 loading positions at 60x100

At 25-foot nominal bays the structure works with the layout instead of against it: one loading position per bay line, walls free of awkward half-positions. The count of working positions, not the headline area, is the figure that survives contact with the operation.

With 2 rows deep, the rear row is behind the front one. Without a route past it, those loading positions become storage positions rather than working ones — the real cost of depth at this width. Access, not area, is what makes a plan feel small once it is in use.

Handling buildings extend by adding a parallel lane rather than by lengthening one. A longer lane adds travel, not throughput.

Configured as a loading and handling building organised around vehicle movement, 60x100 is judged on whether the 6 loading positions it holds match the operation, and on whether the 9 feet of spare width leaves the route this mode depends on.

  • Does the work need four lanes across, or two lanes flanking an interior work hall, or does it need a second lane that this 60-foot span cannot give?
  • Is the 100-foot length being bought for depth, or for the repeated bays — eight to ten repeated bays, which makes the layout a scheduling problem as much as a spatial one?
  • How is product moved in and out, and does the opening suit that equipment?
  • Has wall loading from stored product been raised with the manufacturer as an engineering item?
Planning assumptionTypical configuration

Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.

Comparison

What changes at adjacent footprints

Computed comparison of nearby footprints for a grain storage building

FootprintFloor areaLoading positions
30x802,400 sq ft8 (2 x 4)
40x602,400 sq ft9 (3 x 3)
50x502,500 sq ft3 (3 x 1)
40x702,800 sq ft4 (2 x 2)
30x1003,000 sq ft12 (2 x 6)

Areas computed from each stored size record; loading position counts computed with the same 17 by 28 foot planning module.

  • 30x80 moves the count from 6 to 8 loading positions (2 across by 4 deep), which is the reason to choose between them.
  • 40x60 moves the count from 6 to 9 loading positions (3 across by 3 deep), which is the reason to choose between them.
  • 50x50 moves the count from 6 to 3 loading positions (3 across by 1 deep), which is the reason to choose between them.

Nearby footprints read for a grain storage building: exact change in area and in planning loading positions

FootprintArea Δ% ΔLoading positions at that footprintWhat changes for this use
80x80+400 sq ft+6.7%8 (4 x 2)+2 loading positions on the same planning module.
50x100−1,000 sq ft−16.7%4 (2 x 2)−2 loading positions on the same planning module.
60x120+1,200 sq ft+20%9 (3 x 3)+3 loading positions on the same planning module.
60x80−1,200 sq ft−20%12 (4 x 3)+6 loading positions on the same planning module.

Areas are arithmetic on two stored size records; loading position counts use this platform's 17 by 28 foot planning module and are not a capacity statement.

Because this footprint is planned as a loading and handling building organised around vehicle movement, the useful next reads are different from the ones a differently shaped grain storage building suggests: loading building planning, vehicle turnaround, aligned opening planning.

Visualization

Reading the 60x100 footprint as a grain storage building

100′ length60′ width6,000 sq ft
60x100 footprint plan, drawn from the stored dimensional record
18′ eave25.5′ ridge3:12 pitch · 60′ clear span
Gable cross section at a 18-foot eave and 3:12 pitch, computing to a 25.5-foot ridge

FAQ

Questions about 60x100 grain storage building projects

It depends on the loader working at full lift inside the building, not the pile height. The stored configuration computes to 25.5 feet at the ridge, but the eave is the number that governs anything standing near a wall.

Reserving 18 ft across the 60 ft dimension for movement leaves 42 ft of working width, which takes 2 loading positions at 17 ft. Along 100 ft it takes 3 runs at 28 ft. That is 6 positions out of 6,000 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on how many vehicles can be worked at once before the yard rather than the building becomes the constraint. These are planning figures computed from the footprint, not a quoted layout.

The footprint holds 6 loading positions — 3 across by 2 deep — and leaves 26 feet of depth for a waiting position clear of the loading lane so a second vehicle can stage without blocking the one being worked. Those counts use a 17 by 28 foot planning module with 18 feet allowed for circulation, so a different module changes the answer.

Inside loading protects material and staff from weather and costs clear height and floor area. Whether it is required at all depends on the material and the operation.

A 6-inch slab across 6,000 square feet computes to 111.1 cubic yards before thickened edges, piers or waste. The final design comes from the foundation engineer.

Methodology

How this page was produced

Sources and methodology

Verified sourceExternal factual sources
  • Find Steel Buildings dimensional records

    Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.

  • International Building Code and International Residential Code

    International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.

Platform calculationComputed on this platform
  • Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
  • Loading position fit: Counts, leftover strips and per-module areas are computed from the stored 60x100 record against this platform's 17 by 28 foot planning module for the grain storage building category, with 18 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
  • Allocation model: Zone shares come from this platform's use typology for agricultural equipment and crop shelter and are applied arithmetically to the stored 100-foot length.
Planning assumptionPlanning assumptions
  • Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
  • Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.

Methodology notes

  • Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.

Cost drivers

Quantities that move the estimate at 60x100

Quantities, not prices, are publishable here: roof cladding runs 6,185 square feet — 3% above the 6,000-square-foot floor at a 3:12 pitch — with 111.1 cubic yards of nominal slab beneath it. Snow, wind and site exposure change what this shape costs to build long before the interior plan does.

The apron, the approach and the slab under repeated axle loading are where the money goes. The enclosure itself is usually the cheaper half of a handling building.

  • wall design for product pressure, which is an engineering output
  • the opening size the handling equipment needs
  • ventilation and monitoring provisions
  • the truck apron and turning area
Why we don't quote thisWe do not state 60x100 grain storage building pricing here, because it varies too much to give an honest figure. Published only with a documented inclusion basis, a collection date and a named source.

Drawn to scale

Plans and dimensions

Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.

100′ length60′ width6,000 sq ft
Computed from stored dimensions
Footprint plan — 60′ × 100′, drawn to the stored dimensions.Platform calculation
Front third2,000 sq ftCenter third2,000 sq ftRear third2,000 sq ft60′ × 100′ floor plate
Computed from stored dimensions
Floor plate divided into equal thirds along the length; each area is computed from the stored footprint.Platform calculation

Compare 60x100 grain storage building configurations

Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.

Get a Quote