Building Types
40x70 Grain Storage Building
- Width
- 40 ft
- Length
- 70 ft
- Floor area
- 2,800 sq ft
- Perimeter
- 220 ft

Use
How a 40×70 Grain Storage Building May Be Used
Equipment shelter
Machinery clearance height and door width are usually the limiting factors, not floor area.
Commodity and forage
Bulk storage depth against the sidewalls affects how the building is loaded and unloaded.
Drive-through access
End-to-end access lets equipment pass through without reversing.
Seasonal working space
Open floor is commonly kept for repairs and staging between seasons.
Example
Example Configuration

Quick dimensions
At a Glance
Width
40 ft across the gable end.
Length
70 ft along the sidewall.
Floor area
2,800 sq ft of clear floor.
Eave height
14 ft at the sidewall on the stored profile.
Configuration
How This Building Is Configured
Configuration summary
| Building type | Grain Storage Building |
|---|---|
| Footprint | 40 ft × 70 ft |
| Floor area | 2,800 sq ft |
| Eave height | 14 ft |
Planning
Footprint & Space Planning
Footprint
Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.
Height
Eave height affects door options, storage height and how open the interior feels.
Access
Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.
Doors and openings
Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.
Site
Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.
Expansion
Extending along the length is usually simpler than changing the width later, which is worth deciding up front.
Access
Doors & Access Considerations
Opening width
Across a 40 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.
Opening height
A 14 ft eave sets the ceiling on door height before any frame change.
Drive-through
Matching openings at both ends avoid reversing, at the cost of usable wall.
Similar sizes
Other Sizes for a Grain Storage Building
40′ × 50′
2,000 sq ft
40′ × 90′
3,600 sq ft
30′ × 70′
2,100 sq ft
Related
Related Building Types
Example configuration — for planning purposes only.
FAQ
Common Questions
40 ft × 70 ft is 2,800 square feet of floor area before any interior partitions.
Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.
Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.
Compare nearby sizes
Related footprints for this building type
Each page works through one footprint for one building type.
Overview
A 40x70 grain storage building planned as a support building serving bulk storage held elsewhere on the site
This page is ordered around height and clearance, because at 40x70 the 14-foot eave limits a grain storage building sooner than the plan does.
The footprint holds 4 handling zones — 2 across by 2 deep — and leaves 18 feet of depth for a covered stand for the conveying and cleaning equipment that would otherwise sit in the open between seasons.
Commitment first: 46% of the 2,800 square feet goes to handling zones at 320 square feet each, and 1,280 square feet survives as edge strip. A footprint is worth its own decision when that split lands where the work does. Fire separation, egress and occupancy are determined for the specific building and can reshape this plan entirely.
A 40 by 70 footprint is a clearly directional plan: 2,800 sq ft enclosed by 220 ft of wall, at a 1.8:1 length-to-width proportion. Along its 70 ft dimension it takes 3 runs of handling zones at 20 ft, leaving 10 ft over — the 10 ft is where the argument about this size actually happens. Where bulk product sits in bins or flat storage elsewhere, this building is the part of the operation that keeps working when the bins are full: covered handling, equipment shelter, and somewhere for the tasks that cannot be done in the weather. Planning it as a store misreads its job entirely. A building shared between an operation and a customer's material needs separation that can be pointed at, not assumed.
At 40x70 the operating question is a specific one: what does the building have to do when the product itself is stored in structures outside it? That is a different question from the one a grain storage building of another shape has to answer, and it is why this footprint is planned as a support building serving bulk storage held elsewhere on the site rather than as generic covered area.
Areas, perimeter, roof area, ridge height, slab volume and the handling zone counts on this page are computed from the stored 40x70 record and this platform's planning module for the grain storage building category.
Height
Interior height for a 40x70 grain storage building
Across a 40-foot span the 3:12 pitch adds 5 feet between eave and ridge. The centreline measures 19 feet; anything parked or stacked near a wall lives with the 14-foot eave. Circulation width is the first thing surrendered under pressure and the first thing missed afterwards.
Height on a 40 ft span is a separate decision from the 70 ft length, and it is the span that sets the frame's behavior. Raising the eave over 2,800 sq ft affects every bay along the 70 ft dimension, so the test is whether commodity support building planning genuinely needs the extra clear height or only the floor area.
Ventilation across 2,800 square feet at this height: stored product needs air movement and monitoring, which makes ventilation a stored-quality question rather than a comfort one.
Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.
Usable area
How the 2,800 square feet divides at 40x70
Computed handling zone fit for a 40x70 grain storage building
| Measure | Computed at this footprint |
|---|---|
| Handling zones across the 40-foot width | 2 at a 16-foot module |
| Leftover width | 8 ft (560 sq ft as a full-length strip) |
| Rows along the 70-foot length | 2 at a 20-foot module after 12 ft of circulation |
| Leftover depth | 18 ft (720 sq ft across the width) |
| Total handling zones | 4 |
| Share of floor committed | 46% |
Module footprint used here is 16 by 20 feet, this platform's planning module for a grain storage building. It is not a code minimum or an engineered clearance.
Example allocation of the 70-foot length — planning model, not survey data
| Zone | Length along the building | Computed area |
|---|---|---|
| Equipment bays | 42 ft | 1,680 sq ft |
| Material and input storage | 17.5 ft | 700 sq ft |
| Working and turning space | 10.5 ft | 420 sq ft |
Shares applied to the stored 70-foot length; areas computed against the 40-foot width.
Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.
Allocation
Dividing the floor for a support building serving bulk storage held elsewhere on the site
The handling pattern this building slips into when the season peaks is a loading and handling building organised around vehicle movement: there is no waiting position, so a second vehicle waits in the yard or on the approach and the queue is external. Dividing the 2,800 sq ft by the 16 by 20 ft handling zone gives roughly 3 positions before circulation is deducted a second time for cross movement. Whether the plan keeps 3 or drops to 1 comes back to the question this footprint is really answering: what does the building have to do when the product itself is stored in structures outside it?
The 18-foot leftover depth is 720 square feet across the full width — deep enough to plan deliberately, and at this footprint it goes to a covered stand for the conveying and cleaning equipment that would otherwise sit in the open between seasons. The mezzanine that is added afterwards is the change order that reprices the frame.
The 8 feet of spare width runs the whole 70-foot length — 560 square feet of wall strip. It earns its keep as shelving, staging or a walking route, not as another handling zone. Storage expands until it meets a wall, so give it a wall on purpose.
Movement is through rather than into. Product passes across this floor between the yard and the storage structures, so the plan is judged on how little it obstructs a route that already exists. Seasonal peaks mean the building is congested for weeks and quiet for months, and the congested weeks are the brief. That movement pattern, not the 2,800-square-foot total, is what decides whether the leftover 18 feet is useful here.
Openings
Openings for 2 handling zones across
One opening per position works on this gable: 2 across 40 feet, with 8 feet of wall to distribute as piers. Splitting that margin evenly is what keeps the elevation buildable. Two feet of spare width reads as nothing on a plan and as a great deal when a machine is being turned.
Openings are sized for equipment and trailers rather than for product. Aligning them with the existing yard route matters more than their width, because a building that forces a detour will be driven around instead of through.
Machine handling at one end with a clear path to the pile, and product moved rather than carried.
Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.
Configurations
Configuring 4 handling zones at 40x70
At 23.3-foot nominal bays the structure works with the layout instead of against it: one handling zone per bay line, walls free of awkward half-positions. Judge the plan by what has to happen on the worst day of the year, not on an average one.
With 2 rows deep, the rear row is behind the front one. Without a route past it, those handling zones become storage positions rather than working ones — the real cost of depth at this width. Rows that cannot be entered independently end up used as one long space.
Extension is cheapest along the 70 ft dimension, where each added bay repeats work already framed; widening past 40 ft is a different frame rather than a longer one. Growing to 40 by 90 adds a 4th run of handling zones — useful if the constraint is handling zones rather than the 10 ft already spare at the far end.
Configured as a support building serving bulk storage held elsewhere on the site, 40x70 is judged on whether the 4 handling zones it holds match the operation, and on whether the 8 feet of spare width leaves the route this mode depends on.
- Does the work need three parked lanes, or two lanes and a moving lane wide enough for equipment to pass, or does it need a second lane that this 40-foot span cannot give?
- Is the 70-foot length being bought for depth, or for the repeated bays — six to eight repeated bays, and the bay line becomes the organising device for the whole plan?
- How is product moved in and out, and does the opening suit that equipment?
- Has wall loading from stored product been raised with the manufacturer as an engineering item?
Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.
Cost drivers
Quantities that move the estimate at 40x70
The estimate at 40x70 moves with four computed quantities: 2,800 square feet of floor, 220 feet of perimeter, 3,080 square feet of wall and 2,886 square feet of roof. Everything else is site and specification. The plan is only as good as the route into it, which is a site question rather than a building one.
The building is simple and the services are not. Power capacity, dust management and equipment fixings are what separate this estimate from an equivalent empty shed.
- wall design for product pressure, which is an engineering output
- the opening size the handling equipment needs
- ventilation and monitoring provisions
- the truck apron and turning area
Comparison
What changes at adjacent footprints
Computed comparison of nearby footprints for a grain storage building
| Footprint | Floor area | Handling zones |
|---|---|---|
| 30x40 | 1,200 sq ft | 1 (1 x 1) |
| 24x50 | 1,200 sq ft | 1 (1 x 1) |
| 32x40 | 1,280 sq ft | 2 (2 x 1) |
| 36x40 | 1,440 sq ft | 6 (3 x 2) |
| 24x60 | 1,440 sq ft | 2 (1 x 2) |
Areas computed from each stored size record; handling zone counts computed with the same 16 by 20 foot planning module.
- 30x40 moves the count from 4 to 1 handling zones (1 across by 1 deep), which is the reason to choose between them.
- 24x50 moves the count from 4 to 1 handling zones (1 across by 1 deep), which is the reason to choose between them.
- 32x40 moves the count from 4 to 2 handling zones (2 across by 1 deep), which is the reason to choose between them.
Nearby footprints read for a grain storage building: exact change in area and in planning handling zones
| Footprint | Area Δ | % Δ | Handling zones at that footprint | What changes for this use |
|---|---|---|---|---|
| 30x100 | +200 sq ft | +7.1% | 12 (2 x 6) | +8 handling zones on the same planning module. |
| 50x50 | −300 sq ft | −10.7% | 3 (3 x 1) | −1 handling zone on the same planning module. |
| 40x80 | +400 sq ft | +14.3% | 6 (2 x 3) | +2 handling zones on the same planning module. |
| 40x60 | −400 sq ft | −14.3% | 9 (3 x 3) | +5 handling zones on the same planning module. |
Areas are arithmetic on two stored size records; handling zone counts use this platform's 16 by 20 foot planning module and are not a capacity statement.
Because this footprint is planned as a support building serving bulk storage held elsewhere on the site, the useful next reads are different from the ones a differently shaped grain storage building suggests: commodity support building planning, handling equipment shelter, site route planning.
Visualization
Reading the 40x70 footprint as a grain storage building
FAQ
Questions about 40x70 grain storage building projects
Length here buys 2 rows and 3 nominal bays; width buys 2 positions side by side. At this aspect ratio the building is already long for its span, so extra length adds depth rather than capacity.
Reserving 12 ft across the 40 ft dimension for movement leaves 28 ft of working width, which takes 1 handling zones at 16 ft. Along 70 ft it takes 3 runs at 20 ft. That is 3 positions out of 2,800 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on what does the building have to do when the product itself is stored in structures outside it. These are planning figures computed from the footprint, not a quoted layout.
Capacity grows in length or in separate buildings rather than by piling higher, because pile height is an engineering constraint Practically, the 70-foot dimension is the one that extends; the 40-foot span is fixed once the frames are set.
It usually ends up doing so temporarily. Planning a defined temporary-hold position is better than pretending it will not happen, because unplanned holding blocks the route.
About 720 square feet across the width — enough for a covered stand for the conveying and cleaning equipment that would otherwise sit in the open between seasons.
Methodology
How this page was produced
Sources and methodology
Find Steel Buildings dimensional records
Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering
Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.
International Building Code and International Residential Code
International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering
Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.
- Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
- Handling zone fit: Counts, leftover strips and per-module areas are computed from the stored 40x70 record against this platform's 16 by 20 foot planning module for the grain storage building category, with 12 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
- Allocation model: Zone shares come from this platform's use typology for agricultural equipment and crop shelter and are applied arithmetically to the stored 70-foot length.
- Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
- Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.
Methodology notes
- Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.
Drawn to scale
Plans and dimensions
Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.
Compare 40x70 grain storage building configurations
Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.




