Skip to content
Find Steel Buildings

Building Types

40x70 Farm Equipment Shed

Width
40 ft
Length
70 ft
Floor area
2,800 sq ft
Perimeter
220 ft
Concept visualization of a open-front equipment shed at a representative 60 by 85 foot size; not a real project.
Example Configuration
open-front equipment shed concept visualization at a representative 60x85 size.Example configuration — for planning purposes only
Last updated Aug 27, 2026Reviewed under the Find Steel Buildings editorial standards

Get Quotes for a 40×70 Equipment Shed

Equipment Shed ✓40′ × 70′ ✓
Continue

Use

How a 40×70 Equipment Shed May Be Used

  • Equipment shelter

    Machinery clearance height and door width are usually the limiting factors, not floor area.

  • Commodity and forage

    Bulk storage depth against the sidewalls affects how the building is loaded and unloaded.

  • Drive-through access

    End-to-end access lets equipment pass through without reversing.

  • Seasonal working space

    Open floor is commonly kept for repairs and staging between seasons.

Example

Example Configuration

Example configuration of a 40 by 70 foot equipment shed
Equipment Shed shown as an example configuration — for planning purposes only. Doors, colors and openings are specified for the actual project.

Quick dimensions

At a Glance

  • Width

    40 ft across the gable end.

  • Length

    70 ft along the sidewall.

  • Floor area

    2,800 sq ft of clear floor.

  • Eave height

    14 ft at the sidewall on the stored profile.

Configuration

How This Building Is Configured

70′ length40′ width2,800 sq ft
Footprint drawn to the stated dimensions.Platform calculation

Configuration summary

Building typeEquipment Shed
Footprint40 ft × 70 ft
Floor area2,800 sq ft
Eave height14 ft

Planning

Footprint & Space Planning

  • Footprint

    Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.

  • Height

    Eave height affects door options, storage height and how open the interior feels.

  • Access

    Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.

  • Doors and openings

    Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.

  • Site

    Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.

  • Expansion

    Extending along the length is usually simpler than changing the width later, which is worth deciding up front.

Access

Doors & Access Considerations

  • Opening width

    Across a 40 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.

  • Opening height

    A 14 ft eave sets the ceiling on door height before any frame change.

  • Drive-through

    Matching openings at both ends avoid reversing, at the cost of usable wall.

Similar sizes

Other Sizes for a Equipment Shed

Related

Related Building Types

FAQ

Common Questions

40 ft × 70 ft is 2,800 square feet of floor area before any interior partitions.

Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.

Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.

Compare nearby sizes

Related footprints for this building type

Each page works through one footprint for one building type.

Overview

A 40x70 equipment shed planned as a three-sided shelter that breaks weather on the exposed flanks

This page is ordered around height and clearance, because at 40x70 the 14-foot eave limits a equipment shed sooner than the plan does.

The footprint holds 6 shelter bays — 2 across by 3 deep — and the remaining 4 feet is marginal: there is no walled corner, so anything small enough to blow about is stored elsewhere or lost.

Read this footprint through its span. 40 feet across is the fixed constraint; 70 feet of length is the negotiable one, and at 1.75 to 1 the building is long for its width, so movement runs front to back. Depth is bought cheaply and width expensively, which is why this proportion tends to be argued about before anything else.

An equipment shed is a light shelter rather than an enclosure: it is planned around getting a machine under a roof and back out again with nothing in the way. As for work on the assets themselves, none scheduled; the shelter keeps rain off a machine that will be serviced elsewhere. A 40 by 70 footprint is a clearly directional plan: 2,800 sq ft enclosed by 220 ft of wall, at a 1.8:1 length-to-width proportion. Along its 70 ft dimension it takes 3 runs of shelter bays at 22 ft, leaving 4 ft over — the 4 ft is where the argument about this size actually happens. Three sides is the compromise most working shelters arrive at: enough wall to stop driven rain crossing the floor, and still no door to open. The judgement is about how far the walls return along the open face — every extra foot improves the shelter and narrows the entry. Open structures are treated differently by different local authorities, and the requirements for a specific site are determined by the authority having jurisdiction.

At 40x70 the operating question is a specific one: how much wall does this shelter need before it stops being quick to use? That is a different question from the one a equipment shed of another shape has to answer, and it is why this footprint is planned as a three-sided shelter that breaks weather on the exposed flanks rather than as generic covered area.

Planning assumptionPlatform calculation

Areas, perimeter, roof area, ridge height, slab volume and the shelter bay counts on this page are computed from the stored 40x70 record and this platform's planning module for the equipment shed category.

Height

Interior height for a 40x70 equipment shed

Span drives headroom at 40x70: 40 feet of width on a 3:12 pitch puts 19 feet over the middle and 14 feet at the walls, so where a tall item stands matters as much as how tall it is. Cleaning, maintenance and inspection all need reach, and reach is planned in the gaps rather than in the modules.

Height on a 40 ft span is a separate decision from the 70 ft length, and it is the span that sets the frame's behavior. Raising the eave over 2,800 sq ft affects every bay along the 70 ft dimension, so the test is whether three-sided shelter planning genuinely needs the extra clear height or only the floor area.

Ventilation across 2,800 square feet at this height: an open-sided structure is naturally ventilated, which is part of why it suits machinery that arrives wet or hot.

Planning assumptionPlanning guidance

Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.

Usable area

How the 2,800 square feet divides at 40x70

Computed shelter bay fit for a 40x70 equipment shed

MeasureComputed at this footprint
Shelter bays across the 40-foot width2 at a 15-foot module
Leftover width10 ft (700 sq ft as a full-length strip)
Rows along the 70-foot length3 at a 22-foot module after 0 ft of circulation
Leftover depth4 ft (160 sq ft across the width)
Total shelter bays6
Share of floor committed71%

Module footprint used here is 15 by 22 feet, this platform's planning module for a equipment shed. It is not a code minimum or an engineered clearance.

Example allocation of the 70-foot length — planning model, not survey data

ZoneLength along the buildingComputed area
Equipment bays42 ft1,680 sq ft
Material and input storage17.5 ft700 sq ft
Working and turning space10.5 ft420 sq ft

Shares applied to the stored 70-foot length; areas computed against the 40-foot width.

Planning assumptionPlanning guidance

Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.

Allocation

Dividing the floor for a three-sided shelter that breaks weather on the exposed flanks

Turnover here is seasonal and weather-driven: heavy use for weeks, then long quiet spells. The shelter arrangement this footprint could equally be run as is a wide-span shelter with an uninterrupted floor under the roof: there is no clear margin, so any repositioning happens outside in whatever weather is falling. Dividing the 2,800 sq ft by the 15 by 22 ft shelter bay gives roughly 6 positions before circulation is deducted a second time for cross movement. Whether the plan keeps 6 or drops to 3 comes back to the question this footprint is really answering: how much wall does this shelter need before it stops being quick to use?

Treating the last 4 feet as a room is the recurring planning error at 40x70: there is no walled corner, so anything small enough to blow about is stored elsewhere or lost. Height is the dimension people regret; it cannot be added later without rebuilding the frame line.

Spare width is the more valuable of the two leftovers here: a continuous 10-foot strip beats the same area stranded at the end of the run, because it touches every position along the way. A wider bay is a structural decision and a longer bay is a layout decision; the two are often confused.

Access stays direct, which is the point, but the walls introduce a swept-path constraint at the entry that an open front does not have. A machine entering at an angle needs more front width than the same machine entering square. The value of a shelter is measured in the steps it removes, not the area it covers. The perimeter is partly open — an open front or three sides, so the roof does the work and the walls only break weather. That movement pattern, not the 2,800-square-foot total, is what decides whether the leftover 4 feet is useful here.

Equipment bays42 × 40 ft · 1,680 sq ftMaterial and input storage17.5 × 40 ft · 700 sq ftWorking and turning space10.5 × 40 ft · 420 sq ft70 ft overall length
equipment and storage allocation allocation across the 70-foot length

Openings

Openings for 2 shelter bays across

One opening per position works on this gable: 2 across 40 feet, with 10 feet of wall to distribute as piers. Splitting that margin evenly is what keeps the elevation buildable. A building that cannot be reversed out of is a building that gets used in one direction only.

The open face is the only opening, and it competes with the walls for the same frontage. Deciding its clear width by the largest machine's entry angle, rather than its body width, is what keeps the shelter usable in a hurry.

Planning assumptionEngineering-required

Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.

Configurations

Configuring 6 shelter bays at 40x70

At 23.3-foot nominal bays the structure works with the layout instead of against it: one shelter bay per bay line, walls free of awkward half-positions. Service routes are cheap to plan now and expensive to retrofit through a finished shell.

Depth here creates a hierarchy: 3 rows means front positions get used and rear positions get filled. Deciding which is which up front is what keeps 40x70 workable. Every foot of width added multiplies through the roof and the frame; every foot of length mostly adds skin.

Extension is cheapest along the 70 ft dimension, where each added bay repeats work already framed; widening past 40 ft is a different frame rather than a longer one. Growing to 40 by 92 adds a 4th run of shelter bays — useful if the constraint is shelter bays rather than the 4 ft already spare at the far end.

Configured as a three-sided shelter that breaks weather on the exposed flanks, 40x70 is judged on whether the 6 shelter bays it holds match the operation, and on whether the 10 feet of spare width leaves the route this mode depends on.

  • Does the work need three parked lanes, or two lanes and a moving lane wide enough for equipment to pass, or does it need a second lane that this 40-foot span cannot give?
  • Is the 70-foot length being bought for depth, or for the repeated bays — six to eight repeated bays, and the bay line becomes the organising device for the whole plan?
  • Which side needs to stay open, and which side faces the weather?
  • Does the bay width suit the widest implement, folded or unfolded?
Planning assumptionTypical configuration

Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.

Cost drivers

Quantities that move the estimate at 40x70

The estimate at 40x70 moves with four computed quantities: 2,800 square feet of floor, 220 feet of perimeter, 3,080 square feet of wall and 2,886 square feet of roof. Everything else is site and specification. Noise from this floor reaches the office, the neighbours and the yard, and separation is a plan decision.

Wall panel on three sides is a modest addition against the frame and roof, and it buys most of the weather protection an enclosed building would. It does not buy security, which is a separate decision entirely.

  • how many sides are enclosed
  • bay width set by the widest implement
  • drive-in height across the open face
  • the surface machinery drives on at the bay line
Why we don't quote thisWe do not state 40x70 equipment shed pricing here, because it varies too much to give an honest figure. Published only with a documented inclusion basis, a collection date and a named source.

Comparison

What changes at adjacent footprints

Computed comparison of nearby footprints for a equipment shed

FootprintFloor areaShelter bays
30x401,200 sq ft4 (2 x 2)
24x501,200 sq ft2 (1 x 2)
32x401,280 sq ft4 (2 x 2)
36x401,440 sq ft4 (2 x 2)
24x601,440 sq ft3 (1 x 3)

Areas computed from each stored size record; shelter bay counts computed with the same 15 by 22 foot planning module.

  • 30x40 moves the count from 6 to 4 shelter bays (2 across by 2 deep), which is the reason to choose between them.
  • 24x50 moves the count from 6 to 2 shelter bays (1 across by 2 deep), which is the reason to choose between them.
  • 32x40 moves the count from 6 to 4 shelter bays (2 across by 2 deep), which is the reason to choose between them.

Nearby footprints read for a equipment shed: exact change in area and in planning shelter bays

FootprintArea Δ% ΔShelter bays at that footprintWhat changes for this use
30x100+200 sq ft+7.1%4 (1 x 4)−2 shelter bays on the same planning module.
50x50−300 sq ft−10.7%6 (3 x 2)Same shelter bay count on this planning module; the difference is circulation and stored depth, not capacity.
40x80+400 sq ft+14.3%6 (2 x 3)Same shelter bay count on this planning module; the difference is circulation and stored depth, not capacity.
40x60−400 sq ft−14.3%6 (2 x 3)Same shelter bay count on this planning module; the difference is circulation and stored depth, not capacity.

Areas are arithmetic on two stored size records; shelter bay counts use this platform's 15 by 22 foot planning module and are not a capacity statement.

Because this footprint is planned as a three-sided shelter that breaks weather on the exposed flanks, the useful next reads are different from the ones a differently shaped equipment shed suggests: three-sided shelter planning, wall return and entry width, weather-side orientation.

Visualization

Reading the 40x70 footprint as a equipment shed

70′ length40′ width2,800 sq ft
40x70 footprint plan, drawn from the stored dimensional record
12′ eave17′ ridge3:12 pitch · 40′ clear span
Gable cross section at a 14-foot eave and 3:12 pitch, computing to a 19-foot ridge

FAQ

Questions about 40x70 equipment shed projects

Not enough for a planned room at this footprint: there is no walled corner, so anything small enough to blow about is stored elsewhere or lost.

Reserving 0 ft across the 40 ft dimension for movement leaves 40 ft of working width, which takes 2 shelter bays at 15 ft. Along 70 ft it takes 3 runs at 22 ft. That is 6 positions out of 2,800 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on how much wall does this shelter need before it stops being quick to use. These are planning figures computed from the footprint, not a quoted layout.

It depends on the tallest machine with its implement or loader raised on the way in. The stored configuration computes to 19 feet at the ridge, but the eave is the number that governs anything standing near a wall.

For weather, usually yes when the open face is oriented sensibly. For anything that needs to be locked away, a shelter of this kind is the wrong building and an enclosed store is the right one.

The footprint holds 6 shelter bays — 2 across by 3 deep — and the remaining 4 feet is marginal: there is no walled corner, so anything small enough to blow about is stored elsewhere or lost. Those counts use a 15 by 22 foot planning module with 0 feet allowed for circulation, so a different module changes the answer.

Methodology

How this page was produced

Sources and methodology

Verified sourceExternal factual sources
  • Find Steel Buildings dimensional records

    Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.

  • International Building Code and International Residential Code

    International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.

Platform calculationComputed on this platform
  • Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
  • Shelter bay fit: Counts, leftover strips and per-module areas are computed from the stored 40x70 record against this platform's 15 by 22 foot planning module for the equipment shed category, with 0 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
  • Allocation model: Zone shares come from this platform's use typology for agricultural equipment and crop shelter and are applied arithmetically to the stored 70-foot length.
Planning assumptionPlanning assumptions
  • Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
  • Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.

Methodology notes

  • Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.

Drawn to scale

Plans and dimensions

Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.

70′ length40′ width2,800 sq ft
Computed from stored dimensions
Footprint plan — 40′ × 70′, drawn to the stored dimensions.Platform calculation
Front third933 sq ftCenter third933 sq ftRear third933 sq ft40′ × 70′ floor plate
Computed from stored dimensions
Floor plate divided into equal thirds along the length; each area is computed from the stored footprint.Platform calculation

Continue your research

Related planning topics

Background reading on the questions this page raises. None of these pages sells anything.

Compare 40x70 equipment shed configurations

Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.

Get a Quote