Skip to content
Find Steel Buildings

Building Types

80x150 Steel Aircraft Hangar

Width
80 ft
Length
150 ft
Floor area
12,000 sq ft
Perimeter
460 ft
80x150 Steel Aircraft Hangar example configuration
Example configuration — for planning purposes only.
Last updated Aug 26, 2026Reviewed under the Find Steel Buildings editorial standards

Get Quotes for a 80×150 Aircraft Hangar

Aircraft Hangar ✓80′ × 150′ ✓
Continue

Use

How a 80×150 Aircraft Hangar May Be Used

  • Door span

    The clear door opening, not the footprint, is usually the governing dimension.

  • Tail height

    Required clearance is set by the aircraft, and it drives eave and door height.

  • Maintenance area

    Working space around the aircraft is planned separately from the parking envelope.

  • Apron access

    Approach and taxi access affect where the opening is placed.

Example

Example Configuration

Example configuration of a 80 by 150 foot aircraft hangar
Aircraft Hangar shown as an example configuration — for planning purposes only. Doors, colors and openings are specified for the actual project.

Quick dimensions

At a Glance

  • Width

    80 ft across the gable end.

  • Length

    150 ft along the sidewall.

  • Floor area

    12,000 sq ft of clear floor.

  • Eave height

    24 ft at the sidewall on the stored profile.

Configuration

How This Building Is Configured

150′ length80′ width12,000 sq ft
Footprint drawn to the stated dimensions.Platform calculation

Configuration summary

Building typeAircraft Hangar
Footprint80 ft × 150 ft
Floor area12,000 sq ft
Eave height24 ft

Planning

Footprint & Space Planning

  • Footprint

    Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.

  • Height

    Eave height is commonly the governing dimension here, because clearance for the tallest item sets the door and the wall.

  • Access

    Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.

  • Doors and openings

    Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.

  • Site

    Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.

  • Expansion

    Extending along the length is usually simpler than changing the width later, which is worth deciding up front.

Access

Doors & Access Considerations

  • Opening width

    Across a 80 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.

  • Opening height

    A 24 ft eave sets the ceiling on door height before any frame change.

  • Drive-through

    Matching openings at both ends avoid reversing, at the cost of usable wall.

Similar sizes

Other Sizes for a Aircraft Hangar

  • 130′ length80′ width10,400 sq ft

    80′ × 130′

    10,400 sq ft

  • 170′ length80′ width13,600 sq ft

    80′ × 170′

    13,600 sq ft

  • 150′ length70′ width10,500 sq ft

    70′ × 150′

    10,500 sq ft

Related

Related Building Types

FAQ

Common Questions

80 ft × 150 ft is 12,000 square feet of floor area before any interior partitions.

Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.

Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.

Compare nearby sizes

Related footprints for this building type

Each page works through one footprint for one building type.

Overview

A 80x150 aircraft hangar planned as a based-operations hangar combining aircraft floor with office and crew functions

This page is ordered around vehicle bay, because that is the decision this footprint settles first and every later choice follows from it.

The footprint holds 2 functional zones — 1 across by 2 deep — and leaves 24 feet of depth for an enclosed office and crew wing along one wall, keeping the clear aircraft floor rectangular and undivided.

Read this footprint through its span. 80 feet across is the fixed constraint; 150 feet of length is the negotiable one, and at 1.88 to 1 the building is long for its width, so movement runs front to back. Plan the exit as carefully as the entrance; buildings are emptied under more time pressure than they are filled.

A 80 by 150 footprint is a clearly directional plan: 12,000 sq ft enclosed by 460 ft of wall, at a 1.9:1 length-to-width proportion. Along its 150 ft dimension it takes 2 runs of functional zones at 54 ft, leaving 42 ft over — the 42 ft is where the argument about this size actually happens. Taken purely as arithmetic, 80 by 150 gives 1 functional zones across the 80 ft dimension once 18 ft is reserved for movement, and 2 deep along the 150 ft dimension. Run as a a based-operations hangar combining aircraft floor with office and crew functions, 14 ft across is below the 16 ft this use needs to be worth planning, so there is no enclosed wing, so office and crew functions occupy corners of the clear floor and reduce it to less than a full rectangle Office, crew or administrative functions attached to a hangar are best consolidated into one enclosed wing rather than distributed across corners of the clear floor.

At 80x150 the operating question is a specific one: do office and crew functions live in a defined wing along one wall, or have they taken corners out of the aircraft floor one at a time? That is a different question from the one a aircraft hangar of another shape has to answer, and it is why this footprint is planned as a based-operations hangar combining aircraft floor with office and crew functions rather than as generic covered area.

Planning assumptionPlatform calculation

Areas, perimeter, roof area, ridge height, slab volume and the functional zone counts on this page are computed from the stored 80x150 record and this platform's planning module for the aircraft hangar category.

Height

Interior height for a 80x150 aircraft hangar

Across a 80-foot span the 4:12 pitch adds 13.3 feet between eave and ridge. The centreline measures 37.3 feet; anything parked or stacked near a wall lives with the 24-foot eave. Depth is bought cheaply and width expensively, which is why this proportion tends to be argued about before anything else.

Height on a 80 ft span is a separate decision from the 150 ft length, and it is the span that sets the frame's behavior. Raising the eave over 12,000 sq ft affects every bay along the 150 ft dimension, so the test is whether based aircraft operations layout genuinely needs the extra clear height or only the floor area.

Planning assumptionPlanning guidance

Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.

Configurations

Configuring 2 functional zones at 80x150

The columns win at this footprint: 25-foot nominal bays against a 48-foot module means every layout decision starts from where the frames fall. Insulating later is possible; framing for insulation later is much harder.

Two-plus rows change the access question entirely. Every rear position at 80x150 needs either its own opening or an aisle, and 32 feet of spare width is what that aisle has to come from. Long spans buy flexibility that is only worth paying for if the operation actually changes shape.

The office and crew wing is the natural place to add capacity, since the aircraft floor is normally sized with margin and staff functions are what tend to outgrow their space first.

Configured as a based-operations hangar combining aircraft floor with office and crew functions, 80x150 is judged on whether the 2 functional zones it holds match the operation, and on whether the 32 feet of spare width leaves the route this mode depends on.

  • Does the work need racking or work zones on both sides with a full vehicle lane down the middle, or does it need a second lane that this 80-foot span cannot give?
  • Is the 150-foot length being bought for depth, or for the repeated bays — a long repeating bay sequence, so segment boundaries are set by bay lines rather than by walls?
  • Which aircraft dimension governs — wingspan at the opening or tail height?
  • Which door system suits the operation, and has the end frame been designed for it?
Planning assumptionTypical configuration

Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.

Openings

Openings for 1 functional zone across

Openings are the pinch point here. With 32 feet of spare width the gable cannot host 1 separate doors, so access is either shared or moved to the 150-foot sidewall. Height is the dimension people regret; it cannot be added later without rebuilding the frame line.

A dedicated personnel entrance into the office wing, distinct from the main aircraft door, keeps daily staff arrival from requiring the large door to be opened.

Planning assumptionEngineering-required

Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.

Usable area

How the 12,000 square feet divides at 80x150

Computed functional zone fit for a 80x150 aircraft hangar

MeasureComputed at this footprint
Functional zones across the 80-foot width1 at a 48-foot module
Leftover width32 ft (4,800 sq ft as a full-length strip)
Rows along the 150-foot length2 at a 54-foot module after 18 ft of circulation
Leftover depth24 ft (1,920 sq ft across the width)
Total functional zones2
Share of floor committed43%

Module footprint used here is 48 by 54 feet, this platform's planning module for a aircraft hangar. It is not a code minimum or an engineered clearance.

Example allocation of the 150-foot length — planning model, not survey data

ZoneLength along the buildingComputed area
Aircraft parking area105 ft8,400 sq ft
Maintenance and equipment space30 ft2,400 sq ft
Office, parts and utility15 ft1,200 sq ft

Shares applied to the stored 150-foot length; areas computed against the 80-foot width.

Planning assumptionPlanning guidance

Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.

Allocation

Dividing the floor for a based-operations hangar combining aircraft floor with office and crew functions

The operation this hangar floor could equally be run as is a hangar built around maintenance and inspection work rather than overnight parking: there is no separate parts area, so removed components and paperwork spread across the same floor the aircraft occupies. Dividing the 12,000 sq ft by the 48 by 54 ft functional zone gives roughly 2 positions before circulation is deducted a second time for cross movement. Whether the plan keeps 2 or drops to 1 comes back to the question this footprint is really answering: do office and crew functions live in a defined wing along one wall, or have they taken corners out of the aircraft floor one at a time?

Depth arithmetic leaves a working end zone here. 1,920 square feet sits past the last row, which is why 80x150 tends to be planned with an enclosed office and crew wing along one wall, keeping the clear aircraft floor rectangular and undivided designed in rather than added later. Interior divisions are the last decision that should be fixed, because they are the first one that usually changes.

Spare width is the more valuable of the two leftovers here: a continuous 32-foot strip beats the same area stranded at the end of the run, because it touches every position along the way. Utilities entering on the wrong elevation quietly rewrite the interior layout.

Compared with a 80 by 110 of the same width, the extra depth here adds run rather than reach: it buys about 2 functional zones in line, and every position past the second is retrieved by moving what stands in front of it. Spent as a square 110 by 110 instead, the same 12,000 sq ft would stand 1 functional zones across rather than 1, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. A building of this size behaves like a small yard under a roof: zones need to be defined, signed and left alone, or they migrate. Two patterns run side by side — aircraft movement and staff presence throughout the working day — and separating their routes at the entry keeps foot traffic away from the aircraft's clear path. A hangar shared among several owners or uses works only if at least some positions can be vacated independently of the others. That movement pattern, not the 12,000-square-foot total, is what decides whether the leftover 24 feet is useful here.

Aircraft parking area105 × 80 ft · 8,400 sq ftMaintenance and equipment space30 × 80 ft · 2,400 sq ftOffice, parts and utility15 × 80 ft · 1,200 sq ft150 ft overall length
aircraft and maintenance allocation allocation across the 150-foot length

Cost drivers

Quantities that move the estimate at 80x150

No price appears on this page. The quantities that scale an estimate at 80x150 are 12,000 square feet of slab, 222.2 cubic yards of nominal concrete, 11,040 square feet of wall cladding and 12,649 square feet of roof cladding. A wider bay is a structural decision and a longer bay is a layout decision; the two are often confused.

Finished office space, crew amenities and any conditioning for those areas carry a disproportionate share of the project relative to the unfinished aircraft floor beside them.

  • the door system type, which drives the end-frame design
  • the clear opening width and height the aircraft requires
  • the eave height the door opening forces across the frame
  • the apron outside the opening
Why we don't quote thisWe do not state 80x150 aircraft hangar pricing here, because it varies too much to give an honest figure. Published only with a documented inclusion basis, a collection date and a named source.

Comparison

What changes at adjacent footprints

Computed comparison of nearby footprints for a aircraft hangar

FootprintFloor areaFunctional zones
60x804,800 sq ft1 (1 x 1)
40x1204,800 sq ft2 (1 x 2)
50x1005,000 sq ft2 (1 x 2)
60x1006,000 sq ft2 (1 x 2)
50x1206,000 sq ft2 (1 x 2)

Areas computed from each stored size record; functional zone counts computed with the same 48 by 54 foot planning module.

  • 60x80 moves the count from 2 to 1 functional zones (1 across by 1 deep), which is the reason to choose between them.
  • 40x120 holds the same 2 functional zones but changes the leftover depth by -4 feet, which is where the difference is actually felt.
  • 50x100 holds the same 2 functional zones but changes the leftover depth by -24 feet, which is where the difference is actually felt.

Nearby footprints read for a aircraft hangar: exact change in area and in planning functional zones

FootprintArea Δ% ΔFunctional zones at that footprintWhat changes for this use
100x100−2,000 sq ft−16.7%2 (2 x 1)Same functional zone count on this planning module; the difference is circulation and stored depth, not capacity.
80x120−2,400 sq ft−20%4 (2 x 2)+2 functional zones on the same planning module.
100x150+3,000 sq ft+25%4 (2 x 2)+2 functional zones on the same planning module.
60x150−3,000 sq ft−25%3 (1 x 3)+1 functional zone on the same planning module.

Areas are arithmetic on two stored size records; functional zone counts use this platform's 48 by 54 foot planning module and are not a capacity statement.

Because this footprint is planned as a based-operations hangar combining aircraft floor with office and crew functions, the useful next reads are different from the ones a differently shaped aircraft hangar suggests: based aircraft operations layout, hangar office and crew wing, functional zone planning for hangars.

Visualization

Reading the 80x150 footprint as a aircraft hangar

150′ length80′ width12,000 sq ft
80x150 footprint plan, drawn from the stored dimensional record
24′ eave37.3′ ridge4:12 pitch · 80′ clear span
Gable cross section at a 24-foot eave and 4:12 pitch, computing to a 37.3-foot ridge

FAQ

Questions about 80x150 aircraft hangar projects

It depends on the aircraft's tail height and wingspan taken together, since clearing one but not the other is useless. The stored configuration computes to 37.3 feet at the ridge, but the eave is the number that governs anything standing near a wall.

Reserving 18 ft across the 80 ft dimension for movement leaves 62 ft of working width, which takes 1 functional zones at 48 ft. Along 150 ft it takes 2 runs at 54 ft. That is 2 positions out of 12,000 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on do office and crew functions live in a defined wing along one wall, or have they taken corners out of the aircraft floor one at a time. These are planning figures computed from the footprint, not a quoted layout.

The footprint holds 2 functional zones — 1 across by 2 deep — and leaves 24 feet of depth for an enclosed office and crew wing along one wall, keeping the clear aircraft floor rectangular and undivided. Those counts use a 48 by 54 foot planning module with 18 feet allowed for circulation, so a different module changes the answer.

Office and planning space, crew rest or waiting area, and light administrative functions; anything beyond that is a separate building program decision for the specific operation.

A 6-inch slab across 12,000 square feet computes to 222.2 cubic yards before thickened edges, piers or waste. The final design comes from the foundation engineer.

Methodology

How this page was produced

Sources and methodology

Verified sourceExternal factual sources
  • Find Steel Buildings dimensional records

    Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.

  • International Building Code and International Residential Code

    International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.

Platform calculationComputed on this platform
  • Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
  • Functional zone fit: Counts, leftover strips and per-module areas are computed from the stored 80x150 record against this platform's 48 by 54 foot planning module for the aircraft hangar category, with 18 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
  • Allocation model: Zone shares come from this platform's use typology for aircraft storage and maintenance and are applied arithmetically to the stored 150-foot length.
Planning assumptionPlanning assumptions
  • Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
  • Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.

Methodology notes

  • Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.

Drawn to scale

Plans and dimensions

Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.

Front third4,000 sq ftCenter third4,000 sq ftRear third4,000 sq ft80′ × 150′ floor plate
Computed from stored dimensions
Floor plate divided into equal thirds along the length; each area is computed from the stored footprint.Platform calculation

Continue your research

Related planning topics

Background reading on the questions this page raises. None of these pages sells anything.

Compare 80x150 aircraft hangar configurations

Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.

Get a Quote