120x150 Clear-Span Steel Building

Width
120 ft
Length
150 ft
Floor area
18,000 sq ft
Perimeter
540 ft
Concept visualization of a clear-span steel building at a representative 85 by 155 foot size; not a real project.
Example Configuration
clear-span steel building concept visualization at a representative 85x155 size.Example configuration — for planning purposes only
Last updated Aug 27, 2026Reviewed under the Find Steel Buildings editorial standards

Quick dimensions

At a Glance

  • Width

    120 ft across the gable end.

  • Length

    150 ft along the sidewall.

  • Floor area

    18,000 sq ft of clear floor.

  • Eave height

    14 ft at the sidewall on the stored profile.

Get Quotes for a 120×150 Clear-Span Steel Building

Clear-Span Steel Building ✓120′ × 150′ ✓
Continue

Configuration

How This Building Is Configured

150′ length120′ width18,000 sq ft
Footprint drawn to the stated dimensions.Platform calculation

Configuration summary

Building typeClear-Span Steel Building
Footprint120 ft × 150 ft
Floor area18,000 sq ft
Eave height14 ft

Planning

Footprint & Space Planning

  • Footprint

    Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.

  • Height

    Eave height affects door options, storage height and how open the interior feels.

  • Access

    Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.

  • Doors and openings

    Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.

  • Site

    Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.

  • Expansion

    Extending along the length is usually simpler than changing the width later, which is worth deciding up front.

Use

How a 120×150 Clear-Span Steel Building May Be Used

  • Warehouse

    Clear-span width determines how the main space can be arranged and seated.

  • Arena

    Ancillary rooms are commonly placed along one side or at one end.

  • Manufacturing

    Entrance and exit placement follows the occupancy requirements for the use.

Example

Example Configuration

Example configuration of a 120 by 150 foot clear-span steel building
Clear-Span Steel Building shown as an example configuration — for planning purposes only. Doors, colors and openings are specified for the actual project.

Access

Doors & Access Considerations

  • Opening width

    Across a 120 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.

  • Opening height

    A 14 ft eave sets the ceiling on door height before any frame change.

  • Drive-through

    Matching openings at both ends avoid reversing, at the cost of usable wall.

Similar sizes

Other Sizes for a Clear-Span Steel Building

  • 130′ length120′ width15,600 sq ft

    120′ × 130′

    15,600 sq ft

  • 170′ length120′ width20,400 sq ft

    120′ × 170′

    20,400 sq ft

  • 150′ length110′ width16,500 sq ft

    110′ × 150′

    16,500 sq ft

Related

Related Building Types

FAQ

Common Questions

120 ft × 150 ft is 18,000 square feet of floor area before any interior partitions.

Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.

Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.

Compare nearby sizes

Related footprints for this building type

Each page works through one footprint for one building type.

Overview

A 120x150 clear-span steel building planned as a clear-span volume shaped by an overhead lifting path rather than by floor area

This page is ordered around turn, because that is the decision this footprint settles first and every later choice follows from it.

6 lift bays fit across the 120-foot width with only 0 feet left over, which is a tight fit: the width is fully committed and nothing can be widened later without moving a wall.

Read this footprint through its span. 120 feet across is the fixed constraint; 150 feet of length is the negotiable one, and at 1.25 to 1 the building is close to square, so movement runs in both directions. Ground conditions and drainage decide the floor before the frame does.

A 120 by 150 footprint is a mildly directional plan: 18,000 sq ft enclosed by 540 ft of wall, at a 1.3:1 length-to-width proportion. Along its 150 ft dimension it takes 5 runs of lift bays at 30 ft, leaving 0 ft over — the 0 ft is where the argument about this size actually happens. Here the clear span exists to keep columns out of a lifting path, so the building is planned from the crane down rather than from the floor up. The runway's reach, not the floor's area, is what determines whether a heavy or awkward load can be moved from receiving to its final position without an intermediate handling step. Door width and placement usually govern a clear-span building's usefulness more than its floor area does, because the door decides what can enter in the first place.

At 120x150 the operating question is a specific one: does the crane's runway actually reach every position a load needs to be set down, or only the middle of the floor? That is a different question from the one a clear-span steel building of another shape has to answer, and it is why this footprint is planned as a clear-span volume shaped by an overhead lifting path rather than by floor area rather than as generic covered area.

Planning assumptionPlatform calculation

Areas, perimeter, roof area, ridge height, slab volume and the lift bay counts on this page are computed from the stored 120x150 record and this platform's planning module for the clear-span steel building category.

Configurations

Configuring 24 lift bays at 120x150

At 25-foot nominal bays the structure works with the layout instead of against it: one lift bay per bay line, walls free of awkward half-positions. A leftover strip earns its place only when something is deliberately put in it; otherwise it is circulation with a nicer name.

Depth here creates a hierarchy: 4 rows means front positions get used and rear positions get filled. Deciding which is which up front is what keeps 120x150 workable. The corner nobody plans for is the one that fills first, which is an argument for planning it.

Extension is cheapest along the 150 ft dimension, where each added bay repeats work already framed; widening past 120 ft is a different frame rather than a longer one. Growing to 120 by 180 adds a 6th run of lift bays — useful if the constraint is lift bays rather than the 0 ft already spare at the far end.

Configured as a clear-span volume shaped by an overhead lifting path rather than by floor area, 120x150 is judged on whether the 24 lift bays it holds match the operation, and on whether the 0 feet of spare width leaves the route this mode depends on.

  • Does the work need an interior street with independent zones on both sides and turning room at each end, or does it need a second lane that this 120-foot span cannot give?
  • Is the 150-foot length being bought for depth, or for the repeated bays — a long repeating bay sequence, so segment boundaries are set by bay lines rather than by walls?
  • What dimension genuinely has to be crossed without a column?
  • Is the clear height measured under the frame, or at the eave?
Planning assumptionTypical configuration

Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.

Height

Interior height for a 120x150 clear-span steel building

The stored configuration carries a 14-foot eave and computes to 29 feet at the ridge on a 3:12 pitch — a 15-foot rise across 120 feet. Height is therefore not uniform, and the sidewall is the constraint. What the building holds in its busiest week is the honest brief; the rest of the year is slack.

Under-hook clearance, not eave height, is the number that governs the building, and it has to account for the lifted load's height plus rigging, not just the empty hook.

Planning assumptionPlanning guidance

Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.

Openings

Openings for 6 lift bays across

Openings are the pinch point here. With 0 feet of spare width the gable cannot host 6 separate doors, so access is either shared or moved to the 150-foot sidewall. Plan the exit as carefully as the entrance; buildings are emptied under more time pressure than they are filled.

The 120 ft ends and the 150 ft sides offer very different opening budgets: 120 ft of end wall has room for one wide opening or two modest ones, while 150 ft of side wall can carry several without the openings competing. On this plan the deciding factor is whether overhead crane building layout or runway reach planning should be the first thing reached from the door.

Planning assumptionEngineering-required

Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.

Allocation

Dividing the floor for a clear-span volume shaped by an overhead lifting path rather than by floor area

The use this column-free floor could equally be bought for is a column-free floor sized around turning and parking wheeled equipment, not fixed workstations: there is no turning apron, so every reposition becomes a multi-point manoeuvre around parked equipment. Floor area under the runway is reserved for lift and set-down positions, and anything that does not need to be lifted is pushed to the side bays outside the runway's reach. Mixing fixed benches into the runway path is the most common way this mode's plan gets undermined.

The 18-foot leftover depth is 2,160 square feet across the full width — deep enough to plan deliberately, and at this footprint it goes to a staging strip along the runway line where a load can be set down mid-lift without leaving the crane's reach. Neighbouring buildings, setbacks and the approach road often decide the orientation before the plan does.

Only 0 feet of width is spare, so there is no wall strip: anything set along a sidewall comes out of a lift bay's clearance. The plan should survive the day the largest item the operation owns has to come inside.

Spent as a square 134 by 134 instead, the same 18,000 sq ft would stand 6 lift bays across rather than 5, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. Compared with a 120 by 110 of the same width, the extra depth here adds run rather than reach: it buys about 5 lift bays in line, and every position past the second is retrieved by moving what stands in front of it. At this scale the building is infrastructure rather than a shed; scheduling, traffic direction and separation of activities matter more than any single dimension. The longest internal travel on a 120 by 150 plan is about 192 ft corner to corner, and the shortest useful one is the 120 ft cross-run. For a a clear-span volume shaped by an overhead lifting path rather than by floor area that matters where overhead crane building layout sits, because shortening the 120 ft run to serve it lengthens every trip along the 150 ft dimension. A load-out lane, turning apron or service margin that is planned as permanent floor, not leftover space, is what keeps a wide floor usable years after it is filled. That movement pattern, not the 18,000-square-foot total, is what decides whether the leftover 18 feet is useful here.

Production floor82.5 × 120 ft · 9,900 sq ftMaterial handling and staging42 × 120 ft · 5,040 sq ftSupport, office and utility25.5 × 120 ft · 3,060 sq ft150 ft overall length
process and handling allocation allocation across the 150-foot length

Usable area

How the 18,000 square feet divides at 120x150

Computed lift bay fit for a 120x150 clear-span steel building

MeasureComputed at this footprint
Lift bays across the 120-foot width6 at a 20-foot module
Leftover width0 ft (0 sq ft as a full-length strip)
Rows along the 150-foot length4 at a 30-foot module after 12 ft of circulation
Leftover depth18 ft (2,160 sq ft across the width)
Total lift bays24
Share of floor committed80%

Module footprint used here is 20 by 30 feet, this platform's planning module for a clear-span steel building. It is not a code minimum or an engineered clearance.

Example allocation of the 150-foot length — planning model, not survey data

ZoneLength along the buildingComputed area
Production floor82.5 ft9,900 sq ft
Material handling and staging42 ft5,040 sq ft
Support, office and utility25.5 ft3,060 sq ft

Shares applied to the stored 150-foot length; areas computed against the 120-foot width.

Planning assumptionPlanning guidance

Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.

Comparison

What changes at adjacent footprints

Computed comparison of nearby footprints for a clear-span steel building

FootprintFloor areaLift bays
60x1207,200 sq ft6 (2 x 3)
50x1507,500 sq ft10 (2 x 5)
80x1008,000 sq ft9 (3 x 3)
60x1509,000 sq ft6 (2 x 3)
80x1209,600 sq ft4 (2 x 2)

Areas computed from each stored size record; lift bay counts computed with the same 20 by 30 foot planning module.

  • 60x120 moves the count from 24 to 6 lift bays (2 across by 3 deep), which is the reason to choose between them.
  • 50x150 moves the count from 24 to 10 lift bays (2 across by 5 deep), which is the reason to choose between them.
  • 80x100 moves the count from 24 to 9 lift bays (3 across by 3 deep), which is the reason to choose between them.

Nearby footprints read for a clear-span steel building: exact change in area and in planning lift bays

FootprintArea Δ% ΔLift bays at that footprintWhat changes for this use
100x200+2,000 sq ft+11.1%30 (5 x 6)+6 lift bays on the same planning module.
80x200−2,000 sq ft−11.1%8 (2 x 4)−16 lift bays on the same planning module.
100x150−3,000 sq ft−16.7%20 (4 x 5)−4 lift bays on the same planning module.
120x200+6,000 sq ft+33.3%16 (4 x 4)−8 lift bays on the same planning module.

Areas are arithmetic on two stored size records; lift bay counts use this platform's 20 by 30 foot planning module and are not a capacity statement.

Because this footprint is planned as a clear-span volume shaped by an overhead lifting path rather than by floor area, the useful next reads are different from the ones a differently shaped clear-span steel building suggests: overhead crane building layout, runway reach planning, under-hook clearance.

Visualization

Reading the 120x150 footprint as a clear-span steel building

150′ length120′ width18,000 sq ft
120x150 footprint plan, drawn from the stored dimensional record
12′ eave27′ ridge3:12 pitch · 120′ clear span
Gable cross section at a 14-foot eave and 3:12 pitch, computing to a 29-foot ridge

FAQ

Questions about 120x150 clear-span steel building projects

It depends on the width the operation must cross without a column, which is the defining requirement of the type. The stored configuration computes to 29 feet at the ridge, but the eave is the number that governs anything standing near a wall.

Reserving 12 ft across the 120 ft dimension for movement leaves 108 ft of working width, which takes 5 lift bays at 20 ft. Along 150 ft it takes 5 runs at 30 ft. That is 25 positions out of 18,000 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on does the crane's runway actually reach every position a load needs to be set down, or only the middle of the floor. These are planning figures computed from the footprint, not a quoted layout.

6 lift bays fit across the 120-foot width with only 0 feet left over, which is a tight fit: the width is fully committed and nothing can be widened later without moving a wall. Those counts use a 20 by 30 foot planning module with 12 feet allowed for circulation, so a different module changes the answer.

No — only the positions where a lift actually needs to start or end. Areas outside the runway's reach can be used for fixed storage or work that never needs to move by crane.

A 4-inch slab across 18,000 square feet computes to 222.2 cubic yards before thickened edges, piers or waste. The final design comes from the foundation engineer.

Methodology

How this page was produced

Sources and methodology

Verified sourceExternal factual sources
  • Find Steel Buildings dimensional records

    Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.

  • International Building Code and International Residential Code

    International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.

Platform calculationComputed on this platform
  • Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
  • Lift bay fit: Counts, leftover strips and per-module areas are computed from the stored 120x150 record against this platform's 20 by 30 foot planning module for the clear-span steel building category, with 12 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
  • Allocation model: Zone shares come from this platform's use typology for production and industrial operations and are applied arithmetically to the stored 150-foot length.
Planning assumptionPlanning assumptions
  • Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
  • Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.

Methodology notes

  • Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.

Cost drivers

Quantities that move the estimate at 120x150

No price appears on this page. The quantities that scale an estimate at 120x150 are 18,000 square feet of slab, 222.2 cubic yards of nominal concrete, 7,560 square feet of wall cladding and 18,554 square feet of roof cladding. Interior divisions are the last decision that should be fixed, because they are the first one that usually changes.

Runway support and the crane system itself dominate the budget conversation far more than wall or door finishes, since the building's entire value proposition is the lifting envelope.

  • the span itself, which sets the primary frame
  • clear height maintained under a deeper frame
  • bracing strategy in the walls and roof
  • opening positions the span makes possible
Why we don't quote thisWe do not state 120x150 clear-span steel building pricing here, because it varies too much to give an honest figure. Published only with a documented inclusion basis, a collection date and a named source.

Drawn to scale

Plans and dimensions

Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.

150′ length120′ width18,000 sq ft
Computed from stored dimensions
Footprint plan — 120′ × 150′, drawn to the stored dimensions.Platform calculation
Front third6,000 sq ftCenter third6,000 sq ftRear third6,000 sq ft120′ × 150′ floor plate
Computed from stored dimensions
Floor plate divided into equal thirds along the length; each area is computed from the stored footprint.Platform calculation