100x200 Steel Aircraft Hangar

Width
100 ft
Length
200 ft
Floor area
20,000 sq ft
Perimeter
600 ft
100x200 Steel Aircraft Hangar example configuration
Example configuration — for planning purposes only.
Last updated Aug 26, 2026Reviewed under the Find Steel Buildings editorial standards

Get Quotes for a 100×200 Aircraft Hangar

Aircraft Hangar ✓100′ × 200′ ✓
Continue

Use

How a 100×200 Aircraft Hangar May Be Used

  • Door span

    The clear door opening, not the footprint, is usually the governing dimension.

  • Tail height

    Required clearance is set by the aircraft, and it drives eave and door height.

  • Maintenance area

    Working space around the aircraft is planned separately from the parking envelope.

  • Apron access

    Approach and taxi access affect where the opening is placed.

Example

Example Configuration

Example configuration of a 100 by 200 foot aircraft hangar
Aircraft Hangar shown as an example configuration — for planning purposes only. Doors, colors and openings are specified for the actual project.

Quick dimensions

At a Glance

  • Width

    100 ft across the gable end.

  • Length

    200 ft along the sidewall.

  • Floor area

    20,000 sq ft of clear floor.

  • Eave height

    26 ft at the sidewall on the stored profile.

Configuration

How This Building Is Configured

200′ length100′ width20,000 sq ft
Footprint drawn to the stated dimensions.Platform calculation

Configuration summary

Building typeAircraft Hangar
Footprint100 ft × 200 ft
Floor area20,000 sq ft
Eave height26 ft

Planning

Footprint & Space Planning

  • Footprint

    Width and length are chosen together: width is usually fixed by what has to fit side by side, length by how many bays are needed.

  • Height

    Eave height is commonly the governing dimension here, because clearance for the tallest item sets the door and the wall.

  • Access

    Where vehicles and people enter changes the whole interior layout, so access is settled before anything else.

  • Doors and openings

    Opening width, height and position are specified with the supplier; they affect the frame and the wall bracing.

  • Site

    Slope, drainage, access for delivery and erection, and the foundation are confirmed for the actual property.

  • Expansion

    Extending along the length is usually simpler than changing the width later, which is worth deciding up front.

Access

Doors & Access Considerations

  • Opening width

    Across a 100 ft gable end, the practical opening width is limited by the frame and confirmed with the supplier.

  • Opening height

    A 26 ft eave sets the ceiling on door height before any frame change.

  • Drive-through

    Matching openings at both ends avoid reversing, at the cost of usable wall.

Similar sizes

Other Sizes for a Aircraft Hangar

  • 180′ length100′ width18,000 sq ft

    100′ × 180′

    18,000 sq ft

  • 220′ length100′ width22,000 sq ft

    100′ × 220′

    22,000 sq ft

  • 200′ length90′ width18,000 sq ft

    90′ × 200′

    18,000 sq ft

Related

Related Building Types

FAQ

Common Questions

100 ft × 200 ft is 20,000 square feet of floor area before any interior partitions.

Length is usually adjusted in bay increments, and width is a larger design change. Both are confirmed with the supplier for the final design.

Site preparation, foundation and erection are commonly quoted separately from the building package. Confirm the scope of any quote you receive.

Compare nearby sizes

Related footprints for this building type

Each page works through one footprint for one building type.

Overview

A 100x200 aircraft hangar planned as a hangar built around maintenance and inspection work rather than overnight parking

This page is ordered around taxi line, because that is the decision this footprint settles first and every later choice follows from it.

The footprint holds 6 maintenance stations — 2 across by 3 deep — and leaves 34 feet of depth for a parts and documentation area set apart from the aircraft footprint, so removed components and paperwork have a fixed place during a long job.

Efficiency is the useful number here: 3,333 square feet of enclosed floor per maintenance station, against a 2200-square-foot module. That leaves working slack around each position. Long spans buy flexibility that is only worth paying for if the operation actually changes shape.

A 100 by 200 footprint is a clearly directional plan: 20,000 sq ft enclosed by 600 ft of wall, at a 2:1 length-to-width proportion. Along its 200 ft dimension it takes 4 runs of maintenance stations at 50 ft, leaving 0 ft over — the 0 ft is where the argument about this size actually happens. Maintenance changes the planning brief because the aircraft is present far longer and in a less complete state than in a storage hangar. The building has to hold a partially disassembled aircraft, its removed parts, and the paperwork tracking the work, all at once and for an extended stay. Occupancy, door engineering, and any operational clearance for a specific aircraft are determined by the design professional and the authority having jurisdiction.

This footprint is planned as a hangar built around maintenance and inspection work rather than overnight parking. Compared with a 100 by 150 of the same width, the extra depth here adds run rather than reach: it buys about 4 maintenance stations in line, and every position past the second is retrieved by moving what stands in front of it. Spent as a square 141 by 141 instead, the same 20,000 sq ft would stand 2 maintenance stations across rather than 1, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. At this scale the building is infrastructure rather than a shed; scheduling, traffic direction and separation of activities matter more than any single dimension. Work proceeds over an extended, sometimes interrupted timeline rather than in a single visit, so the plan needs to tolerate the aircraft being incomplete on the floor for long stretches without the building becoming disorganized. Clear height for a specific aircraft is confirmed with its manufacturer rather than assumed from the footprint alone.

Planning assumptionPlatform calculation

Areas, perimeter, roof area, ridge height, slab volume and the maintenance station counts on this page are computed from the stored 100x200 record and this platform's planning module for the aircraft hangar category.

Usable area

How the 20,000 square feet divides at 100x200

Computed maintenance station fit for a 100x200 aircraft hangar

MeasureComputed at this footprint
Maintenance stations across the 100-foot width2 at a 44-foot module
Leftover width12 ft (2,400 sq ft as a full-length strip)
Rows along the 200-foot length3 at a 50-foot module after 16 ft of circulation
Leftover depth34 ft (3,400 sq ft across the width)
Total maintenance stations6
Share of floor committed66%

Module footprint used here is 44 by 50 feet, this platform's planning module for a aircraft hangar. It is not a code minimum or an engineered clearance.

Example allocation of the 200-foot length — planning model, not survey data

ZoneLength along the buildingComputed area
Aircraft parking area140 ft14,000 sq ft
Maintenance and equipment space40 ft4,000 sq ft
Office, parts and utility20 ft2,000 sq ft

Shares applied to the stored 200-foot length; areas computed against the 100-foot width.

Planning assumptionPlanning guidance

Module footprints and allocation shares come from this platform's use typology and are published as example planning models. They are not recommendations and do not describe a majority of projects.

Openings

Openings for 2 maintenance stations across

The 100-foot gable can carry 2 openings, one per maintenance station, with 12 feet of wall left for piers between and beside them — the arrangement that keeps each position independently reachable. Cleaning, maintenance and inspection all need reach, and reach is planned in the gaps rather than in the modules.

The 100 ft ends and the 200 ft sides offer very different opening budgets: 100 ft of end wall has room for one wide opening or two modest ones, while 200 ft of side wall can carry several without the openings competing. On this plan the deciding factor is whether aircraft maintenance hangar planning or parts and documentation area should be the first thing reached from the door.

Planning assumptionEngineering-required

Framed-opening sizes, headers and the structure around them are engineered for the specific building. Confirm every opening with the door supplier and the building manufacturer before ordering.

Allocation

Dividing the floor for a hangar built around maintenance and inspection work rather than overnight parking

The operation this hangar floor could equally be run as is a private hangar built around one owner's aircraft and personal storage: there is no side bay, so personal storage lines the same walls the aircraft has to clear on its way in and out. Dividing the 20,000 sq ft by the 44 by 50 ft maintenance station gives roughly 4 positions before circulation is deducted a second time for cross movement. Whether the plan keeps 4 or drops to 1 comes back to the question this footprint is really answering: when an aircraft sits for days or weeks rather than overnight, is there somewhere for what comes off it that is not the floor around it?

The 34-foot leftover depth is 3,400 square feet across the full width — deep enough to plan deliberately, and at this footprint it goes to a parts and documentation area set apart from the aircraft footprint, so removed components and paperwork have a fixed place during a long job. Depth is bought cheaply and width expensively, which is why this proportion tends to be argued about before anything else.

Spare width is the more valuable of the two leftovers here: a continuous 12-foot strip beats the same area stranded at the end of the run, because it touches every position along the way. Height is the dimension people regret; it cannot be added later without rebuilding the frame line.

Compared with a 100 by 150 of the same width, the extra depth here adds run rather than reach: it buys about 4 maintenance stations in line, and every position past the second is retrieved by moving what stands in front of it. Spent as a square 141 by 141 instead, the same 20,000 sq ft would stand 2 maintenance stations across rather than 1, and would trade this plan's length for parallel access. That is the width-against-depth decision this footprint has already made. At this scale the building is infrastructure rather than a shed; scheduling, traffic direction and separation of activities matter more than any single dimension. Work proceeds over an extended, sometimes interrupted timeline rather than in a single visit, so the plan needs to tolerate the aircraft being incomplete on the floor for long stretches without the building becoming disorganized. Clear height for a specific aircraft is confirmed with its manufacturer rather than assumed from the footprint alone. That movement pattern, not the 20,000-square-foot total, is what decides whether the leftover 34 feet is useful here.

Aircraft parking area140 × 100 ft · 14,000 sq ftMaintenance and equipment space40 × 100 ft · 4,000 sq ftOffice, parts and utility20 × 100 ft · 2,000 sq ft200 ft overall length
aircraft and maintenance allocation allocation across the 200-foot length

Configurations

Configuring 6 maintenance stations at 100x200

Nominal bay division computes to 8 bays at about 25 feet, narrower than the 44-foot module — so frame lines land inside positions and the interior has to be set out from the columns. A wider bay is a structural decision and a longer bay is a layout decision; the two are often confused.

Two-plus rows change the access question entirely. Every rear position at 100x200 needs either its own opening or an aisle, and 12 feet of spare width is what that aisle has to come from. Service routes are cheap to plan now and expensive to retrofit through a finished shell.

Extension is cheapest along the 200 ft dimension, where each added bay repeats work already framed; widening past 100 ft is a different frame rather than a longer one. Growing to 100 by 250 adds a 5th run of maintenance stations — useful if the constraint is maintenance stations rather than the 0 ft already spare at the far end.

Configured as a hangar built around maintenance and inspection work rather than overnight parking, 100x200 is judged on whether the 6 maintenance stations it holds match the operation, and on whether the 12 feet of spare width leaves the route this mode depends on.

  • Does the work need an interior street with independent zones on both sides and turning room at each end, or does it need a second lane that this 100-foot span cannot give?
  • Is the 200-foot length being bought for depth, or for the repeated bays — a long uninterrupted bay sequence that suits repetitive layouts and continuous processes?
  • Which aircraft dimension governs — wingspan at the opening or tail height?
  • Which door system suits the operation, and has the end frame been designed for it?
Planning assumptionTypical configuration

Bay division shown here is a planning module computed from the stored length. Actual bay spacing is set by the manufacturer's frame design for the building.

Height

Interior height for a 100x200 aircraft hangar

Span drives headroom at 100x200: 100 feet of width on a 4:12 pitch puts 42.7 feet over the middle and 26 feet at the walls, so where a tall item stands matters as much as how tall it is. Every foot of width added multiplies through the roof and the frame; every foot of length mostly adds skin.

Overhead clearance for any lifting or access equipment used during inspection is a specific determination for the equipment and aircraft involved, made with the design professional rather than assumed from the shell.

Planning assumptionPlanning guidance

Clear height below purlins, bracing and lighting is lower than the eave height. The usable figure comes from the manufacturer's framing for the selected building.

Comparison

What changes at adjacent footprints

Computed comparison of nearby footprints for a aircraft hangar

FootprintFloor areaMaintenance stations
80x1008,000 sq ft1 (1 x 1)
60x1509,000 sq ft3 (1 x 3)
80x1209,600 sq ft4 (2 x 2)
100x10010,000 sq ft2 (2 x 1)
100x12012,000 sq ft2 (2 x 1)

Areas computed from each stored size record; maintenance station counts computed with the same 44 by 50 foot planning module.

  • 80x100 moves the count from 6 to 1 maintenance stations (1 across by 1 deep), which is the reason to choose between them.
  • 60x150 moves the count from 6 to 3 maintenance stations (1 across by 3 deep), which is the reason to choose between them.
  • 80x120 moves the count from 6 to 4 maintenance stations (2 across by 2 deep), which is the reason to choose between them.

Nearby footprints read for a aircraft hangar: exact change in area and in planning maintenance stations

FootprintArea Δ% ΔMaintenance stations at that footprintWhat changes for this use
120x150−2,000 sq ft−10%9 (3 x 3)+3 maintenance stations on the same planning module.
120x200+4,000 sq ft+20%6 (2 x 3)Same maintenance station count on this planning module; the difference is circulation and stored depth, not capacity.
80x200−4,000 sq ft−20%3 (1 x 3)−3 maintenance stations on the same planning module.
100x250+5,000 sq ft+25%8 (2 x 4)+2 maintenance stations on the same planning module.

Areas are arithmetic on two stored size records; maintenance station counts use this platform's 44 by 50 foot planning module and are not a capacity statement.

Because this footprint is planned as a hangar built around maintenance and inspection work rather than overnight parking, the useful next reads are different from the ones a differently shaped aircraft hangar suggests: aircraft maintenance hangar planning, parts and documentation area, extended-stay hangar layout.

Visualization

Reading the 100x200 footprint as a aircraft hangar

200′ length100′ width20,000 sq ft
100x200 footprint plan, drawn from the stored dimensional record
26′ eave42.7′ ridge4:12 pitch · 100′ clear span
Gable cross section at a 26-foot eave and 4:12 pitch, computing to a 42.7-foot ridge

FAQ

Questions about 100x200 aircraft hangar projects

The width leaves 12 feet spare after 2 maintenance stations. That margin absorbs wall storage and passing room. Width is the dimension that cannot be extended later.

Reserving 16 ft across the 100 ft dimension for movement leaves 84 ft of working width, which takes 1 maintenance stations at 44 ft. Along 200 ft it takes 4 runs at 50 ft. That is 4 positions out of 20,000 sq ft, and the remainder is circulation, walls and the margin every plan needs. Whether that count is enough depends on when an aircraft sits for days or weeks rather than overnight, is there somewhere for what comes off it that is not the floor around it. These are planning figures computed from the footprint, not a quoted layout.

Length here buys 3 rows and 8 nominal bays; width buys 2 positions side by side. At this aspect ratio the building is already long for its span, so extra length adds depth rather than capacity.

Enclosure keeps small components and paperwork from migrating across the floor, at some cost to flexibility; the specific arrangement is a planning choice for the operation involved.

Depth can grow for shop and storage space, but the opening dimension is fixed by the aircraft and cannot be traded away Practically, the 200-foot dimension is the one that extends; the 100-foot span is fixed once the frames are set.

Methodology

How this page was produced

Sources and methodology

Verified sourceExternal factual sources
  • Find Steel Buildings dimensional records

    Find Steel Buildings · Primary platform dataset · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: Stored nominal width, length, eave height, roof pitch and slab thickness for this subject.

  • International Building Code and International Residential Code

    International Code Council · Model code · Tier 1 — code authority, standards body, primary dataset or manufacturer engineering

    Supports: The framework of adopted codes and local amendments that decides permitting, separation and opening requirements. Cited as the governing framework, never as a local requirement.

Platform calculationComputed on this platform
  • Dimensional figures: Width, length, eave height, roof pitch and nominal slab thickness come from this platform's stored record for the subject. Floor area, perimeter, wall area, roof area, ridge height and slab volume are computed from those inputs rather than transcribed.
  • Maintenance station fit: Counts, leftover strips and per-module areas are computed from the stored 100x200 record against this platform's 44 by 50 foot planning module for the aircraft hangar category, with 16 feet allowed for circulation. The module is editorial planning typology, not a code minimum or an engineered clearance.
  • Allocation model: Zone shares come from this platform's use typology for aircraft storage and maintenance and are applied arithmetically to the stored 200-foot length.
Planning assumptionPlanning assumptions
  • Allocation and layout models: Layout splits are arithmetic on the stored footprint, published as example allocation models. They are not survey findings and do not describe what buyers most often choose.
  • Clearance and opening guidance: Clearance and opening statements are planning guidance. Final dimensions depend on the selected door system, header detail and the manufacturer's engineering for the building.

Methodology notes

  • Prices: No price figure appears on this page. Cost data is published on this platform only with a documented inclusion basis, a collection date and a named source.

Cost drivers

Quantities that move the estimate at 100x200

The estimate at 100x200 moves with four computed quantities: 20,000 square feet of floor, 600 feet of perimeter, 15,600 square feet of wall and 21,082 square feet of roof. Everything else is site and specification. A building that cannot be reversed out of is a building that gets used in one direction only.

Bench space, dedicated lighting across the whole floor, and organized parts storage carry more of the difference from a storage hangar than the shell itself does.

  • the door system type, which drives the end-frame design
  • the clear opening width and height the aircraft requires
  • the eave height the door opening forces across the frame
  • the apron outside the opening
Why we don't quote thisWe do not state 100x200 aircraft hangar pricing here, because it varies too much to give an honest figure. Published only with a documented inclusion basis, a collection date and a named source.

Drawn to scale

Plans and dimensions

Every drawing below is generated from the exact dimensions for this building, so proportions and areas are accurate.

Front third6,667 sq ftCenter third6,667 sq ftRear third6,667 sq ft100′ × 200′ floor plate
Computed from stored dimensions
Floor plate divided into equal thirds along the length; each area is computed from the stored footprint.Platform calculation

Continue your research

Related planning topics

Background reading on the questions this page raises. None of these pages sells anything.

Compare 100x200 aircraft hangar configurations

Review the allocation models for this footprint side by side, then estimate the configuration you intend to build.